December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment.

Slides:



Advertisements
Similar presentations
October 16, 2009 RPG Meeting ERCOT RPG Project Review Update Jeff Billo.
Advertisements

Connection of Wind Farms to Weak AC networks – ERCOT Experience and Challenges Shun-Hsien (Fred) Huang ERCOT System Planning CIGRE WG B4.62 Meeting June.
Houston Import Evaluation Cross Texas Transmission & Garland Power & Light ERCOT RPG Meeting August 27th, 2013.
KURTEN SWITCH PROJECT (BRYAN/ COLLEGE STATION AREA UPGRADES) Technical Advisory Committee December 1, 2005 Transmission Services.
Navarro to Houston Presentation to ERCOT RPG August 27, 2013.
1 Dale Osborn Midwest ISO February 27, Wisconsin Renewable Energy Summit Transmission Expansion Opportunities with Wind Energy.
Technical Advisory Committee December 6, 2010 Summary of the CREZ Reactive Study Warren Lasher Manager, Long-Term Planning and Policy.
Valley Import Overview Jeff Billo Regional Planning Group Meeting July 22, 2014 Preliminary1.
The Status Of The Electric Grid In ERCOT The Electric Reliability Council Of Texas Sam R. Jones, P.E. ERCOT – Retired As a retiree of ERCOT this presentation.
How Winds are Created The earth’s winds are caused by pressure differences across the earth’s surface due to uneven heating Local Winds: During the day.
EE 369 POWER SYSTEM ANALYSIS
October 12, 2007 ERCOT Regional Planning Group Meeting RPG-CREZ Task Force Status Report Warren Lasher System Assessment.
Review of progress and future work SQSS Sub Group 2 August 2006 DTI / OFGEM OFFSHORE TRANSMISSION EXPERTS GROUP.
THE TRES AMIGAS SUPERSTATION IIEA - Dublin October 8, 2010 UNITING THE NATION’S ELECTRIC POWER GRID.
Warren Lasher Director, System Planning October 4, 2014 Our Energy Future.
Long Term Study Task Force Update Transmission Study Practices and Methodologies April 5th,2011 LTS.
Managing West Texas Wind SWEDE 2008 Conference May 2, 2008 Presented by Paul Hassink AEPSC Texas Transmission Planning.
10/03/ Report on Existing and Potential Electric System Constraints and Needs Within the ERCOT Region October 3, 2002.
Lyndonville Electric Department Feasibility Analysis Review December 2,
April 16, 2010 RPG Meeting ERCOT Five-Year Transmission Plan Update Jeff Billo.
CREZ Optimization Studies Scenario 2, Alternative 4: Low Impedance Backbone for Wind Connections Cathey Carter, PE RPG CREZ meeting 12/14/2007.
June 19, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
October 16, 2009 RPG Meeting ERCOT 2009 Five-Year Transmission Plan Update Jeff Billo.
March 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
December 7, 2012 Transmission Needs Analysis Scenario 5/7 Update.
MISO Northwest Exploratory Study Presented to National Wind Coordinating Committee Participants in study – MISO, Various utilities in Minnesota, North.
PRR 547 – Trading Hubs CMWG Presentation to WMS October 21, 2004.
20th Century Electric Transmission Grid
April 16, 2010 RPG Meeting Lamesa Area Upgrades ERCOT Independent Review Jeff Billo.
Electric Reliability Council of Texas (ERCOT) A Success Story… In Progress Ingmar Sterzing United States Association of Energy Economics (USAEE) Pittsburgh.
2008 Annual Five Year Plan Update 2 10/12/2007 Regional Planning: Jay Teixeira, Harry Liu, Brad Schwarz, Jeff Billo, Chris Ngai.
OFFSHORE WIND CONNECTION & COSTS Mary Doswell Alternative Energy Solutions December 7 th, 2010.
TAC02/01/2007 DW 1 TAC Briefing on: - Report on Constraints and Needs: Five Year Plan Development - Long Term System Assessment (LTSA) - Entergy Integration.
SPP.org 1. Final Report: Reliability and Economic Assessments Stakeholder Meeting December 1, 2008 Austin, TX.
ERCOT TAC11/2/ CREZ Study Update ERCOT TAC 11/2/2006.
February 13, 2009 RPG Meeting ERCOT System Development Update Jeff Billo.
ERCOT Independent Review
ERCOT CSC – Vote “Yes” to 3b Jan A. Bagnall Sr. Director Transmission, Reliability & Compliance October 2008.
Economic Analysis Proposed Scope ERCOT RPG Meeting September 17, 2010.
Long Term Study Transmission Results May 21 st, 2013.
RPG: September 24, Long-Term System Assessment Introduction Jeff Billo, Manager, Transmission Planning September 2013 Regional Planning Group.
ERCOT Public 1 Project Panel 1 Dan Woodfin Director, System Operations August 15, 2014.
3/28/2008 RPG CREZ Meeting CREZ Transmission Optimization (CTO) Study And The Oscar Goes To… Warren Lasher Manager, System Assessment.
September 1, 2011 TAC Lower Rio Grande Valley Regional Planning Group Project Jeff Billo Manager, Mid-Term Planning.
OPSTF – Issue 7 Long-term unavailability of autotransformers.
Panhandle Renewable Energy Zone (PREZ) Study
May14, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
Oncor Transmission Service Provider Kenneth A. Donohoo Director – System Planning, Distribution and Transmission Oncor Electric Delivery Co LLC
ERCOT Transmission Planning Process Overview and Recommendations November 6, 2002.
Transmission Services Report: North and West RPG Projects Bill Bojorquez TAC July 7, 2005.
August 24, 2007 ERCOT Regional Planning Group Meeting CREZ Transmission Optimization Study Warren Lasher System Assessment.
1/14/10ERCOT ROS / CREZ OGRR1 Why is CREZ Unique? 15 GW of intermittent generation when ERCOT load is less than 30 GW 5000 miles of 345 kV circuits with.
June 11, 2010 RPG Meeting Houston Import Study Update Jeff Billo.
03/06/2008 TAC CREZ Transmission Optimization (CTO) Study Update Dan Woodfin Director, System Planning.
RECENT TRENDS IN POWER SYSTEMS
R ENEWABLE E NERGY IN T EXAS Jess Totten Public Utility Commission of Texas 1.
4/16/2010 Regional Planning Group Meeting Long-Term Planning Study of the ERCOT Interconnection Warren Lasher Manager, System Assessment.
ERCOT – LP&L Study Status Update For Regional Planning Group Ben Richardson March 22, 2016.
EE590 Transmission Planning Projects and Cost Allocation Ming NI Economic Studies, Midwest ISO.
RPG - 10/12/2007 Competitive Renewable Energy Zones (CREZ) Update Bill Bojorquez Vice President, System Planning.
Houston Import Study Update
ERCOT 2009 Five-Year Transmission Plan Update
Warren Lasher Manager, Long-Term Planning and Policy
ECEN 460 Power System Operation and Control
LMP calculations Congestion evaluation
How Winds are Created The earth’s winds are caused by pressure differences across the earth’s surface due to uneven heating Local Winds: During the day.
How Winds are Created The earth’s winds are caused by pressure differences across the earth’s surface due to uneven heating Local Winds: During the day.
ECEN 460 Power System Operation and Control
HVDC Transmission Systems:
New England Electricity Restructuring Roundtable September 18, 2009
Presentation transcript:

December 14, 2007 RPG - CREZ Meeting CREZ Transmission Optimization Study: Update Warren Lasher ERCOT System Assessment

2 RPG - CREZ Meeting December 14, 2007 Designated Zones and Scenario Wind Levels Capacity of New CREZ Wind by Scenario (MW) Wind Zone Scen. 1 Scen. 2 Scen. 3 Scen. 4 Panhandle A 1,4223,1914,9606,660 Panhandle B 1,0672,3933,7200 McCamey8291,8592,8903,190 Central1,3583,0474,7355,615 Central West 4741,0631,6512,051 Total * 12,05318,45624,85924,419 * Assumes 6,903 MW of existing wind capacity

3 RPG - CREZ Meeting December 14, 2007 Overview of Power Flows – Scenario 2 DFW SA There are limitations on how much generation any one load center can absorb. Too much power flow being directed to DFW can cause significant planning challenges. 5,600 MW2,600 MW10,300 MW HGA

4 RPG - CREZ Meeting December 14, 2007 Overview of Alternate Power Flows HGA DFW SA One possible solution is to direct all power flows towards the southeast

5 RPG - CREZ Meeting December 14, 2007 Overview of Alternate Power Flows HGA DFW SA An alternative solution is to create a significant pathway through the core of ERCOT (shown in red)

6 RPG - CREZ Meeting December 14, 2007 Game Plan ERCOT Planning is evaluating several different general concepts for transporting wind from CREZ generation to load centers. Initial analysis has been conducted using Scenario 2 because this level of wind can be modeled in steady-state power flow models and in SCUC economic dispatch model. We will be evaluating the differential performance of the solutions that are developed. Some solutions may be better suited to higher or lower scenarios. Our intent is to develop each of these solutions to the point that each can be compared from an economic, steady-state, and transient stability context. Final solution for each scenario may contain aspects of several of these conceptual designs.

7 RPG - CREZ Meeting December 14, 2007 Solutions being considered include the following: 1)Reconductoring existing circuits 2)Incremental 345-kV solution 3)Reduced number of right-of-ways using higher voltage circuits (500 kV and 765 kV) 4)Low Impedance Backbone for Wind Connections 5)Low Impedance loop circuits (around load centers and/or around wind generation zones) 6)HVDC Circuit(s) to move wind generation to load centers or to move power between load centers 7)Development of 2 west Texas transmission systems Solutions

8 RPG - CREZ Meeting December 14, 2007 Solutions being considered include the following: 2)Incremental 345-kV solution 4)Low Impedance Backbone for Wind Connections Solutions Advantages: 1)Congestion between load centers in ERCOT is reduced (overall system benefit) 2)Increased flexibility of connecting additional circuits from CREZ generation to load – connect to nearest portion of backbone circuit Disadvantages: 1)Cost of low-impedance backbone 2)Use of low-impedance backbone may require upgrades of underlying transmission system in some areas Advantages: 1)Networked solution will lead to flexibility for generation siting 2)New ROWs can be used to alleviate congestion on underlying circuits Disadvantages: 1)May lead to solution with numerous new ROWs 2)May not provide much transmission expansion capacity 3)A sufficient number of suitable connection points to load centers will need to be identified

Questions or Comments?

10 RPG - CREZ Meeting December 14, 2007 HVDC Economic Modeling There are two options for modeling HVDC lines in UPlan 1)Place a load at one end of the line, and a generator at the other end. Give each an predefined hourly pattern to reflect flows on the DC line. User can define power flows to match wind levels or to match operational limitations User can model losses on the line 2)Use the automatic modeling of a HVDC line in UPlan User defines the end points of the HVDC line and specifies the line rating UPlan will model the HVDC line as though there were loads and generators at each line terminus

11 RPG - CREZ Meeting December 14, 2007 UPlan HVDC Modeling Output of Generator A will equal load A Output of Generator B will equal load B If Gen A ≠ 0 then Gen B = 0 and vice versa Gen A and Gen B have zero cost; max output equals rating of line Cost to serve loads A and B are defined by LMP algorithm UPlan will select the output of Gen A (or Gen B) in every hour to minimize total production cost A A B B

12 RPG - CREZ Meeting December 14, 2007 Other Issues 1)Distribution of models 2)Volunteers for evaluating or developing plans 1)138 kV limiting pathways 2)Overall plans 3)Request for Project Locations 4)GE Wind Impact Study 5)Other RPG Issues Feel free to contact me with questions or comments: or