CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited

Slides:



Advertisements
Similar presentations
SGSS Extensions to and Modifications of CCSDS Space Communication Cross Support Service Management October 2012 John Pietras Global Science and.
Advertisements

(E?)SCCS-SM Concept Green Book Review Items. Global Editorial/Style Issues Defining acronyms once at their first use and using the acronym thereafter.
Status of Extensible SCCS-SM Concept Green Book 12 February
1 24 April 2009 SMWG SMWG Closing Report Colorado Springs, Colorado, USA 24 April 2009.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group February, 2011 Wailea, HI PWG F2F Meeting.
CSA WG Meeting 24 April 2009 Page 1 Colorado Springs CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited
Sheet 1XML Technology in E-Commerce 2001Lecture 6 XML Technology in E-Commerce Lecture 6 XPointer, XSLT.
Sep 2003 CCSDS Navigation WG Progress Report MOIMS Meeting Oct 2003 CSC, Maryland, USA Felipe Flores-Amaya CCSDS Navigation WG.
CSSM Meeting Summary Fall 2012 Meetings 15 – 18 October E. Barkley Chair (NASA/JPL) C. Haddow Co-Chair (ESA/ESOC) Cleveland, Ohio, USA.
1 CROSS SUPPORT SERVICE ARCHITECTURE Takahiro Yamada (JAXA/ISAS) CCSDS Meeting, Heppenheim, Germany 2 October 2007.
ESTEC, Noordwijk, Netherlands 27 Oct 2009 SERVICE ARCHITECTURE FOR SPACE -- BOF 1.
SLE-SM Refactoring Proposal Scope –Allow inclusion of services or modifications to existing ones without having to reedit the entire SLE-SM book. Proposal.
MSF Requirements Envisioning Phase Planning Phase.
Symmetric Key Management Books Development Plan Daniel Fischer (ESA) Ignacio Aguilar Sanchez (ESA) CCSDS Spring Meeting 2010 | Portsmouth, VA.
CSSM Meeting Summary CCSDS CSSM Technical Meetings London, UK 10 – 14 November 2014.
CSSM Meeting Summary CCSDS CSSM Technical Meetings San Antonio, Texas, USA 28 – 31 October 2013.
Delta-DOR SIG: Report of the Fall 2007 Meeting Heppenheim, Germany October 5th, 2007 Roberto Maddè ESA/ESOC
2010 Fall CCSDS meeting SMWG UK ) 1 Prototype Test Coordination for the SCCS Service Management (B-1) 26th October, 2010 JAXA ASAMA
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2010 London, UK Takahiro Yamada, JAXA/ISAS.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October, 2009 ESTEC, The Netherlands Takahiro Yamada, JAXA/ISAS.
Panel P1J: Navigation Data April 2003 CCSDS P1J FINAL REPORT Spring Meeting, ESA/ESTEC, Netherlands Dates: April 1-4, 2003 Felipe Flores-Amaya NASA/GSFC/Code.
April 1, 2007 Global Design Effort 1 Materials for S4 meeting Discussion of risks in BDS WP April 1, 2007.
1 Schema Registries Steven Hughes, Lou Reich, Dan Crichton NASA 21 October 2015.
1 ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG) Draft, Issue March 2003 Takahiro Yamada, Chair, AWG.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
CSSM Meeting Summary CCSDS CSSM Technical Meetings Pasadena, CA USA 23 – 27 March 2015.
WGISS /09/2015 DATA PRESERVATION – CNES APPROACH B. Chausserie-Laprée.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Spring 2009 Meeting Takahiro Yamada (JAXA/ISAS) 25 April.
Configuration Profile Development Approach Bakeoff: Build Up Results CCSDS Spring Workshop Pasadena, CA March 2015 Anthony Crowson Telespazio VEGA.
IPR WG REPORT November Information Packaging and Registries WG REPORT November 2004.
Cross Support Service Management Overview Nicolas Champsavoir DCT/PS/SSC CCSDS – CSS Area Cross Support Services ex-SLE Service Management.
Connect. Communicate. Collaborate PerfsonarUI plug-in tutorial Nina Jeliazkova ISTF, Bulgaria.
XML-NDM Schema Issues (From Service Management Perspective) 18 September 2012.
Copyright © 2006 Pilothouse Consulting Inc. All rights reserved. Search Overview Search Features: WSS and Office Search Architecture Content Sources and.
CSTS File Transfer Service CS File Transfer Specification – Initial Discussions IOAG Service Catalogue #1 Scope Candidate Applications File Content.
1Copyright © 2010, Printer Working Group. All rights reserved. PWG Plenary Status Report MFD Working Group Decemberr, 2010 Irvine, CA PWG F2F Meeting.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan October 2012 Clevaland, Ohio, U.S.A. Takahiro Yamada, JAXA/ISAS.
2009 Spring CCSDS meeting ( Colorado Springs,USA ) SMWG 1 Validation Test Coordination for the SCCS Service Management (R-3.4) 20. April 2009 JAXA YAGI.
C. Huc/CNES, D. Boucon/CNES-SILOGIC Producer-Archive Interface Specification.
1 Cross Support Architecture (CSAWG) Overview, Status, Goals Takahiro Yamada JAXA.
Ty - 1 Space Communication Cross Support Architecture WG Closing Plenary Report Spring 2011 Meeting Takahiro Yamada (JAXA/ISAS) 20 May May 2011.
SEA-1 20 Nov 2014 CCSDS System Engineering Area (SEA): System Architecture WG (SAWG) Restart Peter Shames, SEA AD 20 Nov 2014.
Navigation WG Report D. Berry NASA J. Fertig ESA.
CSS-SM Refactoring Proposal Scope –Allow inclusion of services or modifications to existing ones without having to reedit the entire CSS-SM book. Objectives.
How the NCSX Project Does Business
1 CCSDS Security Working Group Spring 2011 Meeting May 2011 Deutsches Institut für Normung (DIN) Berlin, Germany Howard Weiss NASA/JPL.
NASA MSFC Engineering Directorate Mission Operations Laboratory Page 1 Bob SANA End of Meeting Summary.
CCSDS Navigation Working Group David Berry 01/16/2007.
1 Systems Architecture WG: Charter and Work Plan October 23, 2003 Takahiro Yamada, JAXA/ISAS.
DC Architecture WG meeting Wednesday Seminar Room: 5205 (2nd Floor)
1 Steve Hughes Daniel J. Crichton NASA/JPL January 16, 2007 CCSDS Information Architecture Working.
01-05 October 2007 Heppenheim, Germany eb - 1 SMWG Closing Plenary Report Fall 2007 Meeting Erik Barkley 5 October 2007.
1 Space Communications Cross Support Architecture WG: Charter and Work Plan April, 2009 Colorado Springs, CO, USA Takahiro Yamada, JAXA/ISAS.
Systems Architecture WG: Report of the Spring 2005 Meeting April 14, 2005 Takahiro Yamada, JAXA/ISAS.
DSN CCSDS SLE SM Prototype Plan Erik Barkley December 2006.
Functional Resource and Service Component Information Maintenance 9 November 2015 Darmstadt, Germany.
13-17 October 2008 Berlin, Germany ty - 1 Cross Support Architecture WG Closing Plenary Report Fall 2008 Meeting Takahiro Yamada (JAXA/ISAS) 17 October.
1 20 April 2009 Cross Support Service Area Cross Support Service Area Opening Plenary Colorado Springs, Colorado, USA 20 April 2009 Erik Barkley (AD) /
Fall Meeting, November 11, 2015 Paul Pechkam, JPL/NASA
1 Space Communications Cross Support Architecture WG: Charter and Work Plan May 2010 Portsmouth, Virginia, USA Takahiro Yamada, JAXA/ISAS.
1Copyright © 2011, Printer Working Group. All rights reserved. PWG Plenary Status Report Semantic Model Working Group August, 2011 Camas, WA PWG F2F Meeting.
Omniran CF00 1 Key Concepts of Association and Disassociation Date: Authors: NameAffiliationPhone Max RiegelNokia
19-May-2015-cesg-1 CESG Spring 2015: Project Schedule & Resources.
CSA WG Service Agreement Status
Cross Support Architecture WG: Charter and Work Plan
Grid Scheduling Architecture – Research Group
CWE File Structure.
PWG Plenary Status Report MFD Working Group
ROAD MAP OF THE CCSDS ARCHITECTURE WORKING GROUP (AWG)
Web-based Imaging Management System Including CIM Realignment
Presentation transcript:

CSA WG Meeting 17 May 2011 Page 1 Berlin, Germany CSA WG Service Agreement Status Prepared by Hugh Kelliher Space ConneXions Limited

CSA WG Meeting 17 May 2011 Page 2 Berlin, Germany CSA Charter Requirement Development of a recommended standard for service agreements that: 1)defines template(s) of service agreement contents, including formal schema, 2)offers two or more examples of an instantiated service agreement based on the template and two or more current inter-agency service agreements, 3)identifies mechanism(s) for service agreement maintenance.

CSA WG Meeting 17 May 2011 Page 3 Berlin, Germany Overall Approach This addresses Item 1. Schema will be stored on CCSDS web site This addresses Item 3 Item 2 is addressed in completed templates corresponding to existing missions The parameters are derived from existing agreements and SCCS Service Management The concept is derived from IOAG/SISG and SCCS Service Management documents

CSA WG Meeting 17 May 2011 Page 4 Berlin, Germany Current Status The latest version is Draft 7 dated 15 December 2010: o Sections 2 and 3 have been completed o Section 4 incorporates feedback on real missions from: Fred, based on the Juno mission Takahiro, based on the MMO mission Wolfgang, based on the Cluster mission What has not (yet) been done … o Green Book material in Sections 2 and 3 needs to be extracted o Remaining XML Schema in Section 5 need to be produced o Wider discussion is needed relating to terminology, parameters and relationship to CCSDS Service Management

CSA WG Meeting 17 May 2011 Page 5 Berlin, Germany T0 - years Mission Planning provides …. Mission Registration Service Planning Service Package Execution Service Reporting Service Monitoring Trajectory Prediction Submissions/Updates S ervice Packages Submissions/Updates Configuration Profile Submissions/Updates T0 T1 T0 - monthsT0 – weeksT0 - days Service Agreement Concept Section 2 is based on material generated by the Service Management WG several years ago, as reviewed and modified by the CSA WG.

CSA WG Meeting 17 May 2011 Page 6 Berlin, Germany Service Agreement Process Service Planning includes: o Querying Service Catalogs and short listing providers o Iterating high level: mission schedules spacecraft contact plans Service Agreement includes: o Mission registration o Create Service Agreement o Modify Service Agreement o End Service Agreement

CSA WG Meeting 17 May 2011 Page 7 Berlin, Germany Service Agreement Parameters (1 of 2) e.g. SM timeouts, max number of service instances e.g. agency contacts, agreement period, services requested Mainly Generic Service Agreement parameters are grouped into several templates: o Part 1 - Mission Registration o Part 2 - Options and Constraints o Part 3a - Forward Space Link Parameters o Part 3b - Return Space Link Parameters o Part 4a - Configuration Control Parameters o Part 4b - Trajectory Prediction Parameters o Part 4c – Service Package Parameters Mainly SM

CSA WG Meeting 17 May 2011 Page 8 Berlin, Germany Service Agreement Parameters (2 of 2) The following templates are on hold, pending wider discussion: o Service Monitoring o Service Reporting As an example, the Mission Registration parameter table looks like this: Parameter Service Catalog ID DefinitionService Management Name, Type and Value Service Agreement Reference N/A Specifies a reference for the Service Agreement serviceAgreementReference String256 Supporting Agency01Name of the provider agency.supportingAgency Supporting Agency Contacts 02 List of human contacts and other entity names in the provider organization permitted to participate in the service allowedCmSmEntityNames Provider Complex03 Name of the Complex that will provide the service to the user complexName Supported AgencyN/AName of the user agency.supportedAgency Supported Agency Contacts N/A List of human contacts and other entity names in the user organization permitted to participate in the service allowedUmSmEntityNames Spacecraft NameN/AName of the supported spacecraft.spacecraftName

CSA WG Meeting 17 May 2011 Page 9 Berlin, Germany Mission Registration Template ‘Supporting Agency Contacts’ ‘Wolfgang Hell’

CSA WG Meeting 17 May 2011 Page 10 Berlin, Germany Mission Registration XML File – –- - –- - –- - – Wolfgang Hell – –- - – Takahiro Yamada – –- - – ESTRACK DSN – –- - – BepiColumbo Programme Plan (BC-EST-PL-02944) – –- - – Spacecraft Contact Plan (preliminary) – etc. ‘Supporting Agency Contacts’ becomes ‘allowedCmSmEntityNames’ with value ‘Wolfgang Hell’

CSA WG Meeting 17 May 2011 Page 11 Berlin, Germany Mission Registration XML Schema These Types are copied from the SM Schema: String256Type UTCTimeType SmEntityNameType Additional elements need to be added to the SM Schema e.g. testSupport1 Element names are identical to those defined in the SM Schema e.g. allowedCmSmEntityNames

CSA WG Meeting 17 May 2011 Page 12 Berlin, Germany Next Steps Split documents into “Service Planning” Green Book (Sections 2 and 3) and “Service Agreement” Red Book (Sections 4 and 5) Align with latest SM and IOAG terminology, as appropriate Add missing material: o Complete remaining templates o Add links to Service Catalog parameters (when available) o Add sections on security, patents, conformance matrix, SANA o Add appendix for acronyms Obtain namespace for XML schema Obtain document references from Secretariat!