06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line.

Slides:



Advertisements
Similar presentations
8:16 SB 25ns dumped by RF; integrated lumi 0.6 nb-1. 9:14 BIC problem in TI8 and CMS recovering their tracker 10:09 Abort gap cleaning commissioning. 16:29.
Advertisements

Beam commissioning strategy Global machine checkout Essential 450 GeV commissioning System/beam commissioning Machine protection commissioning.
LHC progress Saturday 2 nd May 2015 Coordination: Mike Lamont, Wolfgang Hofle.
Sat/Sun 26/27 th March Sat 18h20: Stable beams. Fill #1653. Sun 10h02: Stable beams continued. vdM scans. Length calibrations. 16h59: Beam dump. Delivered.
Wednesday 12 th September Pumping, removal of vacuum equipment from tunnel in the morning TOTEM & ALFA, RP movement tests: OK 11:50 pre-cycle started,
21/05/2012LHC 8:30 meeting Overview Week 20 Injectors, LHCb polarity, Beam-Beam Coordinators: Bernhard Holzer, Jan Uythoven.
LHC 30 th and 31 st July :10 Finish scrubbing fill 25 ns trains by operator dump. –No XPOC data … 08:40 Inject for another scrubbing fill 09:09.
Until Sat 3:30: Stable beams.  Stopped by collimator temperature interlock. Sat 7:00 – Sun 8:30: Cryo stop IR4 and recovery.  PLC problem due to SEU.
● 08:30 Loaded by mistake squeeze function to 2 m  Dumped beams ● 10:30-13:00 Test of new algorithm for long. Emittance blow-up to minimize oscillations.
Summary of Week 30 G. Arduini, J. Wenninger Main aims: “Adiabatically” increase peak luminosity by emittance reduction Luminosity production.
Monday h00: End of fill #1640: 3.7 pb h14: RB S12 and S23 tripped before loading rampdown table, active filter. MPE piquet. Fip_Com_Lost.
LHC Beam Operation Comitte24. April INJECTION AND TRANSFER LINE STABILITY L.Drøsdal For the injection team.
Tuesday 17 th April 04:00 Prepare second fill for v/d Meer scans. 06:22 Stable beams, v/d Meer scans for Alice and LHCb. 13:20 End v/d Meer scans.Dump.
00:15: Stable beams fill 1883, 1.1E33 cm-2s-1.  Seems the 144 bunches beam 1 doe not fit properly on the injection kicker waveform. Systematically the.
09:25 Operator dump fill #2178, integrated lumi 107/108/18 nb-1. Trip of RQ4.R6 (fire heaters discharged) just after the beam dump but the QPS gave no.
08h15: Injection.  Correction injection oscillations.  Transfer line steering.  Losses at 30% of dump threshold, limited by SPS scraping. 12h35: Start.
Monday 12 th November 04:50 Beam dump, trip of RF line 4B, integrated L ~120 pb-1. Access for RF. 07:00 Injecting. FBCT phasing. Line steering. 09:59 Beam.
Goal of the week: Stable beams with trains of 200 & 248 bunches 1 OP summary of week 40 R. Bailey, J. Uythoven & J. Wenninger.
Tuesday 24 th July - morning 10:15 Operator dump of fill 2873  Initial luminosity: 5.83e33 cm-2s-1  12 hours stable beams  151 pb-1 delivered  Initial.
Injection and protection W.Bartmann, C.Bracco, B.Goddard, V.Kain, M.Meddahi, V.Mertens, A.Nord, J.Uythoven, J.Wenninger, OP, BI, CO, ABP, collimation,
Saturday 11.9 ● From Friday – Minimum required crossing angle is 100  rad in 2010 – Plenty of aperture at triplets: > 13  (n1 > 10) – Can stay with 170.
LHC 8 & 9 May :10: Injection kicker B1 faulty on oil level –Check in UA and RA. Leaks fixed, to be further checked in TS1 10:30: Pre-cycle started.
Injection status W. Bartmann, C. Bracco, B. Goddard, V. Kain, A. Macpherson, M. Meddahi, S. Redaelli, J. Uythoven, J. Wenninger LIBD Meeting, 20 th Sept.
Thursday 20 th April 01:53 RCBV17.R7B2 tripped as happened few days ago: SIS intercepted. 05:54 Stable beams, 1380b, still RF problems B1, abort gap cleaning.
04h36: Cryo problem in arc 81. Access. 09h14: Injection.  TI8 injection collimator setup.  Testing new sequence.  New version of vacuum application.
Thursday 27 th October 00:57 fill 2257 dumped during squeeze (RQTF.A67B1) 03:52 stable beams fill #2258 4:33 Dumped, problem of LBDS dilution kicker power.
07:00 Dump fil #2219, 123 pb -1 delivered. Trim TDI parking position to +/- 55 mm in the collimator BP trimmed the temperature kicker limit to 62 degrees.
Tuesday 3 rd October STABLE BEAMS until 12:25 when we switched to ADJUST for a EOF test for Tobias  dump B2 first and then B1.  Dump at EOF test because.
Aperture measurements during LHC commissioning 2017
1st LHC MD Period Started
Wednesday :06 Dump fill 3533: interlock BPMS in IP6
Monday Recover after trip of RB.A81  Cause of the trip not clear. MP3? 09:00-13:00 Re-inject and Injection verification. In parallel investigations on.
Wednesday September 14th
Monday h00: Ramp 10 A/s (chromaticity, crossing angle non-closure, beta-beating): At 7m and 3.5m, put in one by one crossing angles, calculated.
Friday 07:00 Power glitch on the EDF network. Point 8 affected.
Tue :25 Beams dumped due to RF vacuum interlock
Thursday morning – optics correction
Tuesday 23/11/10 8:00 Physics fill #1511 dumped
Wednesday 31 October: Morning
Summary of Week 16 G. Arduini, J. Wenninger
Lost at 12:05 to power converter (RTQX2.R1) problem
Wed :40 Lost S78 - QPS controller.
Monday February 28th 8h00: Injection
Thursday :00: Physics fill from the night shift
Tuesday 9th November 10:02 Fill beams dumped
Friday Morning 7:30 injection for fill 2908
Friday AM Some oscillations of the cryo conditions in MSR8 perturbed the setup for injection. RF frequency interlock fixed – required a reset of RF controls.
Sunday
Summary of week 19 Machine Coordinators: G. Arduini, M. Lamont Main aim: Luminosity production.
Monday – Morning Fill 3265 stable beams since 1:31
Aims for the week Recover from technical stop and precycle at 10A/s
Monday 24 October hours of 25ns MD
LHC Morning Meeting - G. Arduini
Thursday 04/11 - Morning Access until ~13:00 Pre-cycle Proton checks:
Thursday 26th July 13:21 Fill 2880 beam dumped
Programme for Friday 9 July
Friday 14th September 03:15 Beta* at 1 km. Optics measurements, see yesterday. 07:00 Dump. 08:00 Refill with 3 nominal bunches for high beta. 11:15 Beams.
Thu 04:00 Fill #2729 Stable Beams. Initial lumi 6.5e33 cm-2 s-1.
Tuesday In the morning test cycle with probe for Q’ measurement.
Wednesday 23/2 Thanks CRYO!!!.
Fri :52 Stable beams fill #2536
Thursday
Wednesday 6th April Injection of 50 ns up to 108 bunches (3 x 36).
Thursday Aperture studies (foreseen until ~ midday, nothing done) Problems with single bunch B2 from SPS (extraction kicker not enabled) Setting.
Injection Studies: 50 ns ABT/BTP.
Friday h55 Stable beams. Fill #1841. Lumi ~1.2e33.
Monday 27th August & night
Wednesday morning / afternoon
Sat :24 Fill 2669 stable beams, average bunch intensity 1.5e11, peak lumi: ~6.5e33 cm-2s-1. 14:37 Beams dumped by operation due to cryo problem.
Tuesday
Presentation transcript:

06:00 – Ongoing injection problems on beam 2  07:42 – Start of injection investigations  11:11 – Injection problem fixed. Resteering of transfer line. Change due to perturbations from ion cycle? 11:42 – Start of checks for transfer line collimators  12:09 – Switching polarity of LHCb dipole and compensators  14:45 – 30min stop of beam from injectors due to restoring of second control system for SPS compensators  Cryo has put up improved system for handling of T sensor problem into R5. 16:41 – End of checks for injection collimators. Go to physics:  16:58 – Injection for physics. Losses fine now.  17:54 – Start of ramp  18:13 – Start of squeeze 18:38 – Stable beams. Fill #2117.  From RF: Keep bunch intensity at 1.4e11. Klystron T regulation. Friday September 16 th LHC morning report

Sorting out injection problems with 144b  injection for B2 appeared fine for 12 b but had already offset of 600 um at the MSI; loss shower from TL dumped while injecting 144b  checked if recently seen bunch dependent injection oscillations causes the dump --> pattern visible but not strong  steered trajectory focusing around horizontal collimators  situation improved, but seems to be for two reasons:  ion cycle in the SPS was put in again which resumed the same cycle conditions as for yesterday's trajectory steering --> dependency of trajectory on cycles which are before the LHC cycle to be checked  careful steering around collimators in the horizontal plane brought further loss reduction  injected 3 x 144 b with losses OK  B1 steering more tricky because one BPM reading needed to be flipped in sign --> to be checked with kick response  B1 losses improved finally by ~50% and checked with 2 x 144b being OK  sticking to one dedicated filling super cycle with always the same cycle composition could avoid these problems  for both transfer lines we see big shot to shot variations of the trajectory, B1 more sensitive --> MSE stability to be followed up SUMMARY OF INJECTION STUDIES - Chiara, Wolfgang, … LHC morning report

Checking trajectory drift in TI2  Checks only for B1. TI 2 trajectory corrected. Settings copied to pilot cycle. Masks: maskable ring BLMs, BPM.P6, TI 2 BLMs, opened TCDI thresholds.  Check TCDI center for 3 collimators in I&D mode with pilot, moving full gap. Removed masks. Check TCDI center for 2 collimators with 12 b, moving only one jaw at a time.  RESULTS: Values in [um] show measured beam centre wrt to the actual coll. centre: beam ctr shift beam ctr shift pilot 12b TCDIH (-0.3 sig) --- TCDIH (0.03 sig) + 20 (0.03 sig) TCDIV (-0.3 sig) -200 (-0.15 sig)  measured beam centre for 12 b is consistent with BPM readings from trajectory  maximum shift of 0.3 sigma measured  trajectory correction before the measurement did not deteriorate injection oscillations  the shot to shot trajectory variation in TI 2 horizontal is in average ~330 um (max 1mm), so centre shifts of todayare of the same order as shot to shot variations  a full re-setup of the TL with new trajectory and collimator centering will probably not improve the situation significantly on the long term  TCDI setup with pilot cycle is appropriate, critical TCDIs potentially tbc with 12b  since no significant trajectory drift at the critical TCDIs has been measured, opening the TCDIs from 4.5 to 5 sig remains valid (last validation done beginning of March) SUMMARY OF INJECTION STUDIES - Chiara, Wolfgang, … LHC morning report

Centering Transfer Line Collimator LHC morning report

03:28 – Beam dump due to temperature interlock on collimator TCP.B6.B1. Collected 75 pb-1 in 8h50. 04:55 – Injection 06:31 – Ramp 06:57 – Beam dump at flat top. Lost cryo in point 4 (PLC fault and FIP problem). Stopped cold compressor. Recovery estimated earliest at 21:00… Saturday September 17 th LHC morning report

Collimator jaw temperature (TCP) LHC morning report

Cryo recovery: until ~21:00 earliest Accesses in shadow of cryo recovery:  Access for CMS water pump (CMS to switch magnet off)  Access CMS tunnel forward detector: ~2h  RF intervention to remove limitation for bunch intensity (UX45): ~1h  e-cloud solenoid IR2: ~6h  QPS in 78: ~0h30  MKIC LSS8 vacuum intervention  BLM crate reset IR2: ~1.5h  BI intervention UA47: ~3h  Repair power converter RSS.A34.B1 Delivering integrated luminosity… Ahead LHC morning report