Done by: Zainab Al-fadhli Supervised by: Prof: M.Fahim Eng : Yusuf Ismail Kuwait university Engineering and Petroleum college Chemical Engineering Department.

Slides:



Advertisements
Similar presentations
Analysis of heat exchangers: Use of the log mean temperature Difference LMTD Method: Q= (m cp ∆T) h = (m cp ∆T) c Q= U A F∆T lm A=N װ DL ∆ T lm = ∆T l.
Advertisements

Heat Exchanger Design Thermal / Fluid System Design Final Project Department of Mechanical Engineering Fall 2005 December 13, 2005 Team Members: Andrew.
Chapter 4.2: Flow Across a Tube Bundle Heat Exchanger (Tube Bank)
Heat Exchange Design and Optimization Project Presented: May 6 th, 2010 Professor: Mr. Toksoy Group Members: Nathan Dart Andrew Kinney Paul Thompson Joe.
Chapter 3.2: Heat Exchanger Analysis Using -NTU method
Experiment : 5/03/2012 Presentation : 12/03/2012 Group B1/B Vartak Shankul Shisheer 10D Abhishek Mathur 10D Kunal Bhoyar 10D
Heat transfer to fluids without phase change
Equipment design Ethylbenzene production by liquid phase
Equipments Design Production of Synthesis Gas from Natural Gas by Steam Reforming Supervised By: Prof. Mohamed A. Fahim Eng. Yusuf Ismail Ali Presented.
Heat Exchangers with Cross Flow past Cylinders P M V Subbarao Professor Mechanical Engineering Department I I T Delhi Another Common Industrial Application!!!
Kern Method of SHELL-AND-TUBE HEAT EXCHANGER Analysis
HEAT EXCHANGERS Day 2.
Heat transfer equipments:
Heat exchangers. Device that facilitate the exchange of heat between fluids that are at different temperatures while keeping them from mixing with each.
Results of Kern Method Basic Kinematic Details Group No. Tube Side Velocity (m/s) Number of Tubes Shell Diameter length STHX (m) Ds/L
ME421 Heat Exchanger and Steam Generator Design
Supervised by : Dr. mohammad fahim Eng. Yousef ali Yaqoub bader ali.
بنام خدا.
Chapter 11: Heat Exchangers
ME421 Heat Exchanger and Steam Generator Design Lecture Notes 6 Double-Pipe Heat Exchangers.
Heat Exchanger Design Anand V P Gurumoorthy Associate Professor
Equipments Design presentation Done By: Amer M. Al-Najdi.
Steam Condenser II Prof. Osama El Masry
College of Engineering & Petroleum Depatment of Chemical Engineering
Capture and Utilization of Carbon Dioxide Ethanol Production Presented By: Dana Al-Maiyas. Supervised By: Prof.Mohamad A.Fahim. Eng.Yousif Ismael.
PM3125: Lectures 10 to 12 Content of Lectures 10 to 12: Heat transfer:
A Presentation on HEAT EXCHANGER DESIGN
PROPLEM DIFINITION Heat exchanger is a device used to transfer heat from a fluid (liquid or gas) to another fluid where the two fluids are physically.
Propylene Oxide Production by ARCO Process Done By Fiasal Juhail.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
For Sell and tube heat exchanger, pump, compressor and valve. Designed by:- Lulwa H. Hamada EQUIPMENT DESIGN.
Table of Content Introduction of heat exchanger. Design of Coolers.
Done by: Adel Abdullah Supervised by: Prof. M.Fahim.
Propylene Production from
Sara Saad Al-Quhaim (Group leader)
So Far: Conservation of Mass and Energy Pressure Drop in Pipes Flow Measurement Instruments Flow Control (Valves) Types of Pumps and Pump Sizing This Week:
Designer: Khaled Aldhaferi Supervised by: Prof.M.Fahim ENG: Yousif Ismail PROPYLEN OXIDE CO-PRODUCTION WITH t-BUTYL ALCOHOL BY THE TEXACO HYDROPEROXIDATION.
Equipment Design. Content: 2 Heat Exchanger ( 1 & 2 ) Cooler (E-100) Compressor (K-102) Trans-alkylation reaction.
Production of ethanol From syngas Design presentation Done by: SARA BADER AL- SAFI Supervised by: Prof. M. fahim.
Distillation column design ( 2 ) Packed column ( 2 ) Heat exchanger design ( 2 Cooler )
Equipments Design PO/Styrene Plant
Chapter 11 Heat Exchangers ( ) Heat Exchangers.
Equipment Design Designed by Eman A. Khajah. Outline Design of Heater. Design of Stripper.
Done by: Esraá Hajjeyah Supervised by: Prof. M.Fahim Eng. Yusuf Ismail.
Supervised by: Prof. Mohamed Fahim Eng. Yusuf Ismail Done by: Mutlaq Al_Shammari.
Equipments Designed Done By Hessa Al-Sahlawi
Table of content 1- Heat exchanger design (cooler ) 2- Distillation column design. 3- Valve.
Heat Transfer Equations For “thin walled” tubes, A i = A o.
FOOD ENGINEERING DESIGN AND ECONOMICS
Done by: Sabah Alfadly Supervised by: Prof. Mohammed Fahim Eng. Yusuf Ismail.
Designer: Bader Al-Rashedi Supervised by: Prof.M.Fahim ENG: Yousif Ismail.
Designer: Mohammed Albannay Supervised by: Prof.M.Fahim ENG: Yousif Ismail.
PROPYLEN OXIDE CO-PRODUCTION WITH t-BUTYL ALCOHOL BY THE TEXACO HYDROPEROXIDATION PROCESS Designer: Sultan Alharbi Supervised by: Prof.M.Fahim ENG: Yousif.
Heat Exchanger Design Cooler E-100 Heater E-108.
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 11 Heat Exchangers.
Table of Content Introduction of heat exchanger. Design of Coolers. Introduction of fixed bed reactors. Design of reactors.
Heat Transfer by Convection
Heat Transfer Su Yongkang School of Mechanical Engineering # 1 HEAT TRANSFER CHAPTER 11 Heat Exchangers.
RIVERA, ALYSSA A. 5ChE-C. Evaporation..  Evaporation is basically a separation step which uses heat transfer to separate products presenting differences.
CHE441 Lecture: Tank & Vessel. Introduction of Vessel Applications of Vessels:  (1) as a liquid surge drum for liquid storage  (2) as a vapor/liquid.
DESIGN OF SHELL AND TUBE HEAT EXCHANGER
Chapter 11: Heat Exchangers
Che 451 chemical engineering design i HEAT EXCHANGER DESIGN
ERT 216 HEAT AND MASS TRANSFER
Chapter 5 The First Law of Thermodynamics for Opened Systems
Chapter 11: Heat Exchangers
Chapter 4 Heat Exchangers: Design Considerations
Heat-transfer Equipment
Heat Exchangers Heat Exchangers.
Overall Heat Transfer Coefficient (U)
Presentation transcript:

Done by: Zainab Al-fadhli Supervised by: Prof: M.Fahim Eng : Yusuf Ismail Kuwait university Engineering and Petroleum college Chemical Engineering Department Plant Design

Out lines  cooler: E-100 ( for process 1). E-100 ( for process 2). E-101 E-102 E-103  Separator : V-101 ( for process 1) V-101 ( for process 2)  Compressor : K-100( process1) K-100( process 2)

 cooler

Cooler design  Objective To cold the stream to required temperature.  Assumptions 1- In our process, Used shell and tube heat exchanger, one shell and two tube passes. 2- The value of the overall heat transfer coefficient was assumed. 3- Assume the outer, the inner diameter and the length of the tube.

Design procedure : 1.Heat load,(kW) Q = (m Cp ΔT) hot =(m Cp ΔT) cold 2. Tube side flow, (kg/hr) 3.Log mean Temperature, (˚C)

Continue ΔT1= Thi - Tco ΔT2= Tho - Tci where, Thi: inlet hot stream temperature (˚C). Tho: outlet stream temperature (˚C). Tci: inlet cold stream temperature (˚C). Tco: outlet cold temperature (˚C). 4.Calculate the two dimensionless temperature ratios: R = (Thi - Tho) /(Tco - Tci) S = (Tco - Tci)/(Thi - Tci) 5. From Figure we get Ft by using R and S ratios where : Ft : temperature correction factor

Continue 6. Calculate True temperature difference ∆Tm= Ft *∆T lm 7. Choose U from table depending on the type of flows in shell and tube side U: Over all heat transfer coefficient 8. Calculate provisional area :

continue 9. Assume inlet tube diameter, outlet tube diameter, and tube length 10. Calculate area of one tube A = 3.14*L*do*10^-3 Where: L: Tube length ( m) do: outlet diameter (mm) 11.Calculate Number of tubes = provisional area / area of one tube

Continue 12. Calculate bundle diameter Db = Do (Nt /K1)^(1/n1) Where: Db: bundle diameter (mm). Do: tube outer diameter (mm). Nt: number of tubes. K1 and n1 are constant from table. 13. From Figure determine bundle diametrical clearance Ds = Db + Dc 14. Calculate shell diameter Where: Db : bundle diameter( mm) ( Dc : clearance diameter( mm

Continue 15.For Tube side coefficient calculate. Cold stream mean temperature = ( Tci +Tco) /2,(ºc). Tube cross sectional area = (π/4 ) di ^2,(mm2). Tubes per pass = no. of tubes / number of passes. Total flow area = tubes per pass * cross sectional area,(m). Water mass velocity = mass flow rate / total flow area,(Kg/s.m2). 16. To calculate Shell side Coefficient : Baffle spacing (Lb) = 0.2 * Ds, mm) Tube pitch (pt) = 1.25 * do, (mm) Cross flow area (As) = (pt - do)* Ds* Lb / pt,(m2) Mass velocity (Gs) = mass flow rate / cross flow area,(Kg/s.m2)

Continue linear velosity (ų ) = mass velosity / density,(m/s). Renolds number (Re) = ρ ų di/ µ. Prantel number (Pr) = Cp µ / κ. (hi di / κ) = jh Re Pr^0.33 * (µ/µwall)^0.14. Assume that the viscosity of the fluid is the same as at the wall,(µ/µwall) = 1 the Then find the value of jh from the figuer. 16. To calculate Shell side Coefficient : Baffle spacing (Lb) = 0.2 * Ds, (mm) Tube pitch (pt) = 1.25 * do, (mm) Cross flow area (As) = (pt - do)* Ds* Lb / pt,(m2) Mass velocity (Gs) = mass flow rate / cross flow area,(Kg/s.m2)

Continue 17. Calculate over all coefficient: 1/Uo = (1/ho)+(1/hod)+(doln(do/di)/(2kw))+(do/di)(1/hid)+(do/di)(1/hi) Where: Uo: the overall coefficient, W/m2°C ho: outside fluid film coefficient, W/m2 °C hi : inside fluid film diameter hod : outside dirt coefficient (fouling factor) hid: inside dirt coefficient, W/m2°C kw: thermal conductivity of the tube wall material di : tube inside diameter, m do : tube out side diameter, m

18.Calculate pressure drop for Tube side : ∆Pt = Np(8*jf*(L/di)+2.5)*(ρut2/2) ∆Pt : tube side pressure drop, pa Np : number of tube side passes ut: tube side velocity (m/s) L : length of one tube ( m) jf : From Fig 19. Shell side : ∆P = 8*jf*(Ds/de)*(L/lB)*(ρ*us2/2) Where: ∆P : shell side pressure drop (pa) Ds : shell diameter (m) lB : baffling spacing ( m) jf : From Fig

20. Thickness: (t) = ((Pri)/(SEj-0.6P)) + Cc Where : P: maximum internal pressure, kPa ri: inside radius of shell, m Ej: efficiency of joints as a fraction S: maximum allowable stress, kPa Cc: allowance for corrosion, m 21. Calculate the cost from

Cooler E-100( for process 1) Operating Condition Shell Side 200 Outlet temperature ( o C) Inlet temperature ( o C) Tube Side 180 Outlet temperature) o C) 35 Inlet temperature( o C) 220 Number of Tubes 2 Number of Tube Rows Shell Diameter (m) Tube bundle Diameter (m) LMTD ( o C) (Q total (Kw Heat Exchanger Area (m^2) 165 U (W/m 2 o C) $52300 Cost ($)

Cooler E-100(for process2) Operating Condition Shell Side 1000 Outlet temperature ) o C) 1336 Inlet temperature ( o C( Tube Side 250 Outlet temperature ( o C) 35 Inlet temperature( o C( 98 Number of Tubes 2 Number of Tube Rows Shell Diameter (m) Tube bundle Diameter (m) LMTD ( o C) (Q total (Kw Heat Exchanger Area (m^2) 100 U (W/m^2 o C) $36900 Cost ($)

Cooler E-101(for process2) Operating Condition Shell Side 500 Outlet temperature ( o C( 1000 Inlet temperature ) o C( Tube Side 200 Outlet temperature( o C( 35 Inlet temperature ( o C( 101 Number of Tubes 2 Number of Tube Rows Shell Diameter (m) Tube bundle Diameter (m) LMTD ( o C ( Q total Kw Heat Exchanger Area (m^2) 300 U (W/m 2 o C) $36800 Cost ($)

Cooler E-102(for process2) Operating Condition Shell Side 250 Outlet temperature ( o C) 500 Inlet temperature ( o C ( Tube Side 150 Outlet temperature ( o C) 35 Inlet temperature ( o C) 112 Number of Tubes 2 Number of Tube Rows Shell Diameter (m) Tube bundle Diameter (m) LMTD ( o C( Q total Kw Heat Exchanger Area (m^2) 300 U (W/m 2 o C) $41400 Cost ($)

Cooler E-103(for process2) Operating Condition Shell Side 200 Outlet temperature ( o C) Inlet temperature ) o C ( Tube Side 120 Outlet temperature ( o C) 35 Inlet temperature(( o C) 46 Number of Tubes 2 Number of Tube Rows Shell Diameter (m) Tube bundle Diameter (m)) LMT ( o C) Q total (Kw) Heat Exchanger Area (m^2) 100 U (W/m 2 o C) $11100 Cost ($)

 Separator A vapor-liquid separator is a vertical usedin several industrial applications to separate a vapor –liquid mixture.

Design procedure 1.calculate the settling velocity of the liquid droplet using the following equation :- Where, Ut = settling velocity in m/s ρl = liquid density in kg/m³ ρv= vapors density in kg/m³ 2- assume there is no demister 3-calculate the actual settling velocity in m/s Ua=0.15Ut.

Dv = ( 4Vv/ Π Ua)^(1/2) 4- Calculate the minimum vessel diameter. Where, Dv = minimum vessel diameter in m Vv = gas volumetric flow rate in m³/s Ua= actual settling velocity in m/s 5- assume 10 min hold – up.

6-calculate the volume held in the vessel Volume = VL * hold time VL = Liquid volumetric flow rate in m³/s

7-Calculate the vessel cross sectional area A= Π/4 * Dv² 8-Calculate the liquid depth hv = volume held up/ vessel cross sectional area hv = liquid depth in m 9-calculate the height Ht = hv+ DV/2+DV+DV/2+DV/2

10-Calculate the thickness of the separator using the following equation t: thickness of the separator in (in) P: operating pressure in Pisa ri: radius of the separator in (in) S: is the stress value of carbon steel = Pisa Ej: joint efficiency (Ej=0.85 for spot examined welding) C0: corrosion allowance = calculate the cost

Separator v-101( process1) Operating Condition 515 Operating Pressure (psig) 59.3 Operating Temperature ( o C( Design Considerations Gas Density (kg/m3( Liquid Density (kg/m3) 1 Z factor Viscosity (cp) Liquid Flow rate (MMSCFD) Gas Flow rate (MMSCFD) Dimensions 3.5 Height (m) Diameter (m) Cost($) 44700

Separator v-101( process2) Operating Condition 515 Operating Pressure (psig) 40 Operating Temperature ( o C) Design Considerations Gas Density (kg/m3( Liquid Density (kg/m3) 1 Z factor Viscosity (cp) Liquid Flow rate (MMSCF) Gas Flow rate (MMSCFD) Dimensions 4.5 Height (m) 1.43 Diameter (m) Cost($) 64900

 Objective To increase the pressure of the feed from 1 bar to 70 bar Choosing the compressor type.  Choosing the compressor type

1.Calculate the compression factor (n) using the following equation: Where, P1,2 : is the pressure of inlet and outlet respectively (psia) T1,2 : is the temperature of the inlet and outlet respectively (R)

2. Calculate the work done in Btu/lbmol by: Where, R is the ratio of the specific heat capacities (Cp/Cv) 3. Calculate the horse power, Hp using the following equation: Hp=W*M Where, M is the molar flow rate in lbmol/s 4. Calculate the efficiency of the compressor using the following equation:

Where, Mw :is the molecular weight of the gas in the stream CP :is the specific heat capacity (Btu/lb◦ F ) 5. Calculate the cost of the compressor from www. Matche. comwww. Matche. com

Compressor K-100 ( process 2) Operating Condition Outlet Temperature (◦C) Inlet Temperature (◦C) 519 Outlet Pressure (psia) 14.7 Inlet Pressure (psia) Power (Hp) 95.55% Efficiency (%)

Compressor K-100 (process2 ) Operating Condition 1336 Outlet Temperature (◦C) Inlet Temperature (◦C) 1470 Outlet Pressure (psia) 14.7 Inlet Pressure (psia) Power (Hp) % Efficiency (%)

Thank you for listening