SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013.

Slides:



Advertisements
Similar presentations
Eric Montesinos LIU-SPS coordination meeting 23rd May 2014
Advertisements

New 200 MHz and 800 MHz amplifiers
LHC Inject or Upgra de SPS 200 MHz SPS 800 MHz RF Power upgrade Progress report April 2014 Eric Montesinos LIU-SPS meeting, 30 April 2014.
All experimenters meeting – July 7, 2014 LHC Crab Cavity Overview Tom Nicol – Fermilab All Experimenter’s Meeting July 7, It’s a group effort –
Chubaka Producciones Presenta :.
2012 JANUARY Sun Mon Tue Wed Thu Fri Sat
P Pathophysiology Calendar. SundayMondayTuesdayWednesdayThursdayFridaySaturday January 2012.
FCC week March 2015 Marriott Georgetown Hotel Superconducting RF: Novel Cavity Concepts & Cryomodules Fundamental Power Coupler (FPC) Eric Montesinos,
DESIGN OF A HIGH POWER TEST STAND FOR ESS SPOKE CAVITIES
For more information, please contact 19/11/2010 EN/CV/DC Chiller design and purchase by Elena Perez Rodriguez.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
RF power & FPC status Eric Montesinos, CERN BE-RF on behalf of all people involved, great thanks to all of them !
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
PSB MPS Building 245 CV Status EN-CV-PJMichel OBRECHT – Frédéric TEIXEIRA
HINS 6-Cavity Test 3 Month Plan Jan 12, Current Schedule 2-3 day shutdown scheduled to start Jan 18 (Wednesday) to upgrade BPM system and reinstall.
 A brief history of time  In the years BC.  My years at CERN  Current position  What is a Technical Coordinator?  The different type of intervention.
WORD JUMBLE. Months of the year Word in jumbled form e r r f b u y a Word in jumbled form e r r f b u y a february Click for the answer Next Question.
Anders Sunesson RF Group ESS Accelerator Division
1 1. Some recent views ( ) 2 Linac tunnel
PSB C04 RF system Consolidation or upgrade? M. Paoluzzi – CERN BE-RF 11/23/20151.
Bulding 245 schedule update LIU Booster Meeting Fulvio Boattini TE-EPC TEEPC.
DATE POWER 2 INCOME JANUARY 100member X 25.00P2, FEBRUARY 200member X 25.00P5, MARCH 400member X 25.00P10, APRIL 800member.
Almost 40 years of operation with tetrodes in the CERN-SPS CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of RF-SPS team CWRF workshop,
Renovation of the 200 MHz RF system LLRF issues. Cavities redistribution 26 October th LIU-SPS Coordination Meeting 2  2011 : 4 cavities 2 x 4.
KEK/ISIS/ANL LOI Amplifier/Second Harmonic RF Collaboration Meeting Tuesday, 26th of June, 2007 PAC07, Albuquerque, NM.
20 years of high average Fundamental Power Coupler designs at CERN CWRF workshop 2014, Trieste Eric Montesinos, CERN-RF, on behalf of many colleagues CWRF.
2011 Calendar Important Dates/Events/Homework. SunSatFriThursWedTuesMon January
The months of the year January February. The months of the year March April.
T. KurtykaLinac4 meeting 12 March 2009 Guidelines from the sLHC Specification Committee 1). sLHC Specification Committee 2). Schedule of tenders for Linac4.
LIU-SPS RF Power upgrade | 09 December 2015.
SPS point 3 New RF building LIU-SPS-200 MHz Power Upgrade April 19, 2011Eric Montesinos / CERN-BE-RF-SR.
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
CALENDAR 2015: “THIS PROJECT HAS BEEN FUNDED WITH SUPPORT FROM THE EUROPEAN COMMISSION. THIS PUBLICATION [COMMUNICATION] REFLECTS THE VIEWS ONLY OF THE.
High Intensity Neutrino Source Program Overview for CD Controls Management Meeting Bob Webber October 6, 2006.
July 2007 SundayMondayTuesdayWednesdayThursdayFridaySaturday
SPS point 3 LSS3 rearrangement LIU-SPS-200 MHz Power Upgrade May 26, 2011Eric Montesinos / CERN-BE-RF-SR.
SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 15 th August 2012.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
FREIA: HIGH POWER TEST STAND Rutambhara Yogi & FREIA Group ESS RF Group Unit Leader for Spoke Power and RF Distribution FREIA Group Unit Leader, Uppsala.
650 MHz Solid State RF Power development at RRCAT
ALBA RF System Paco Sanchez - 13th ESLS RF - DESY, 30 September Paco Sanchez, RF Group, CELLS (Consortium for the Exploitation of the Synchrotron.
HiLumi-LHC/LARP Crab Cavity System External Review 5-6 May 2014, BNL SPS - RF Power and Coupler status Erk Jensen, Eric Montesinos, CERN BE-RF.
RF Commissioning D. Jacquet and M. Gruwé. November 8 th 2007D. Jacquet and M. Gruwé2 RF systems in a few words (I) A transverse dampers system ACCELERATING.
LARP Crab Cavities Cryomodule Integration Meeting Final Notes A.Ratti LBNL.
Lucio Rossi for the LARP Internal Project Review Via videlink, June 10, 2013.
LIU-SPS Project baseline, objectives and reviews for 2016 B.Goddard 20/01/16.
Andrew Moss ASTeC, Daresbury Laboratory October 2010 MICE RF Amplifier Status.
CBETA Technical Review
LIU – SPS Low level RF Updates and schedule G. Hagmann,
BE/RF-IS Contribution to LIU C. Rossi and M. Paoluzzi
10 MHz amplifier status G. Favia
RF Status 1 4 High Power Amplifier circuits available CERN(2)
Dictation practice 2nd Form Ms. Micaela-Ms. Verónica.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
McDonald’s Kalender 2009.
2300 (11PM) September 21 Blue line is meridian..
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
McDonald’s calendar 2007.
RF systems introduction
HIGH POWER AMPLIFIERS For WARM LINAC Arash Kaftoosian
LHC External Collimation Review
Status and New Developments of ALBA RF Systems
Krzysztof Czuba ESS LLRF Quarterly Meeting
McDonald’s calendar 2007.
Status of the ESS High Power RF Systems
345 kV Bailey-Jones Creek Project Anticipated Project Schedule
Status and New Developments of ALBA RF Systems
2015 January February March April May June July August September
Presentation transcript:

SPS 200 MHz RF Upgrade Eric Montesinos LIU-SPS coordination meeting 17 th December 2013

Amplifiers Drivers (SSA): MS completed : 17 companies selected IT completed : selected company under qualification FC March 2014 Finals (SSA or Tetrodes): MS completed : 7 companies selected TS to be send out January 2014 FC June 2014 Combiners (3 dB above 100 kW) After Finals have been selected MS + IT 2014 FC 2014 Transmission lines (coaxial, 345 mm outer) During Winter shutdowns 17 December 20132LIU SPS RF Drivers 16 SSA Final 16 PAs 3 dB combiners and power loads 120 m and 180 m Coaxial lines To cavity input 120 m away From Beam Control 1/16 splitter

Amplifiers Drivers (SSA): MS completed : 17 companies selected IT completed : selected company under qualification FC March 2014 Finals (SSA or Tetrodes): MS completed : 7 companies selected TS to be send out January 2014 FC June 2014 Combiners (3 dB above 100 kW) After Finals have been selected MS + IT 2014 FC 2014 Transmission lines (coaxial, 345 mm outer) During Winter shutdowns 17 December 20133LIU SPS RF Drivers 16 SSA Final 16 PAs 3 dB combiners and power loads 120 m and 180 m Coaxial lines To cavity input 120 m away From Beam Control 1/16 splitter

December 2013 Amplifiers Schedule 17 December 20134LIU SPS RF October IT sent March FC Order placed IT : Invitation to Tenders FC : CERN Finance Committee FAT : Factory Acceptance Tests CERN AT : CERN Acceptance Tests LD Tests : Long duration tests : Long Technical Stop, No beams March First Series FAT June Pre-series FAT December CERN approval for Series Production (after LD tests) August Pre-series CERN AT December Last Series CERN AT Junuary IT sent June FC Order placed December First Series FAT March CERN AT September CERN approval for Series Production (after LD tests) December Pre-series FAT December Last Series CERN AT Drivers Finals

September December 20135LIU SPS RF Studies Tendering Construction Installation Commissioning Start up 2018 Studies HBW (kicker and Pickup) New power couplers Cavities pickups vacuum CV, EL Studies Authorizations Construction Services (CV, EL)Startup Spare sections LLRF Design and proto LLRF Tests LLRF Series New RF Building LSS3 Tunnel Integration New RF Power Amplifiers and LLRF 6 months cavities re-arrangement 2 months RF Power conditioning 4 months LLRF commissioning Coaxial Lines

December December 20136LIU SPS RF Studies Tendering Construction Installation Commissioning Start up 2019 Studies HBW (kicker and Pickup) New power couplers Cavities pickups vacuumCV, EL Studies Authorizations Construction ServicesStartup Spare sections LLRF Design and proto LLRF Tests LLRF Series New RF Building LSS3 Tunnel Integration New RF Power Amplifiers and LLRF 9 months cavities re-arrangement 4 months RF Power conditioning 5 months LLRF commissioning Coaxial Lines 2018

THANK YOU FOR YOUR ATTENTION!