ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016.

Slides:



Advertisements
Similar presentations
Resistive bulks industrialization Status report 2 OCTOBER 2012 Fabien Jeanneau | PAGE 1 RD51 Collaboration meeting | Stony Brook University | October 2012.
Advertisements

ATLAS-NSW CERN MMM workshop assembly of the module (quadruplet)
APPLICATION OF EDMS TO XFEL CRYOMODULE ASSSEMBLY AT CEA Christelle CLOUE - Catherine MADEC.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP THERMO-MECHANICAL SIMULATIONS FOR THE MM WEDGES (TDR OPTIONS – SCREWED QUADRUPLETS) of June 2013 Patrick.
SAISINUC SOFTWARE ENVIRONMENT Data tools: import, check, export, use DDEP , October 8-10 Marie-Martine Bé, Charlène Bisch, Christophe Dulieu, Mark.
Discussion on Studies at Test Stands Roger Ruber Uppsala University.
From Research Prototype to Production
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
ENDORSING RADIATION PROTECTION IN ACADEMIA AND UNIVERSITY HOSPITALS, THE INTERNATIONAL STANDARDS Egypte workshop | Akli HAMMADI | PAGE 1 CEA | 10 AVRIL.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Accelerator/WP High Beta Structures Alan Wheelhouse HIGH-BETA CAVITY DELIVERY April 21, 2015.
Manufacturing contracts for RFQ
PRELIMINARY VERSION ESS RFQ CDR 2 TIME SCHEDULE, PROJECT RISKS, RAMI AND SAFETY Anne-Catherine CHAUVEAU8th and 9th december 2015.
October 1st 2015 Alexis Fouché 1, Florian Noyrit 1, Sébastien Gérard 1, Maged Elaasar 2 SYSTEMATIC GENERATION OF STANDARD COMPLIANT TOOL SUPPORT OF DIAGRAMMATIC.
Accelerator/ Medium Beta Cavities Paolo Michelato INFN Milano - LASA April 21, 2015.
JRA1 – SRF report CARE Steering Committee meeting,
Industrial Participation & SRF Infrastructure at Fermilab Phil Pfund with input from Harry Carter, Rich Stanek, Mike Foley, Dan Olis, and others.
RISK REGISTER Management & Engineering
ESS RFQ PROJECT RISKS Anne-Catherine CHAUVEAU 14 January 2016.
Bruyères-le-Châtel, 8 décembre 2015
ACCSYS Risk Management J. G. Weisend II Deputy Head of Accelerator Projects January 14, 2016.
INTERFACES MANAGEMENT CRYOMODULES Vincent HENNION SYSTEM ENGINEERING ACTIVITIES.
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
H. Danared | Cryomodule Workshop | Page 1 The In-Kind Process at ESS Håkan Danared Lund, 15 October 2014.
Irfu.cea.fr ATLAS-NSW 4 TH MMM WORKSHOP SELECTION CRITERIA FOR THE DECISION ON THE MM CONSTRUCTION SCHEME of June 2013 Patrick PONSOT for the CEA-Saclay-Irfu.
ESS | title of presentation | 2012-xx-xx | name of presenter Roles and Responsibilities sub title.
RF PROCESSING OF RFQ COUPLERS CDR2 | Michel Desmons 8-9 DEC 2015.
H-ECCTD - KICK-OFF MEETING 16TH MARCH 2016 GENERAL INTRODUCTION Florence ARDELLIER.
Pierre Bosland 4 TH OF FEBRUARY 2016 COORDINATION COMMITTEE FR-SW AGREEMENT STATUS OF THE FRENCH ACTIVITIES UNDER THE RESPONSIBILITY OF CEA.
SRF COLLABORATION MEETING MAY.2016 ESS MEDIUM BETA CAVITY MANUFACTURING CEA Saclay/ESS ECCTD WU Cavités | Enrico Cenni.
Shrikant_Pattalwar ICEC 26, March 7-11, 2016, Delhi 1 Horizontal Tests in a Vertical Cryostat Shrikant Pattalwar STFC Daresbury Laboratory UK.
ESS RFQ INTERFACES | Didier CHIRPAZ-CERBAT CEA-ESS INTERFACES.
DISCUSSION OF THE ARCS AND OVERALL LATTICE INTEGRATION FCC meeting 8th of January 2015 Antoine Chance.
Wish list from ESS Christine Darve H-ECCTD Kick-off meeting 16 March
1 & 2 JUNE 2015 – LLRF – BEAM DYNAMICS WORKSHOP URIOT Didier What is taken into account in simulations LLRF – Beam dynamics Workshop.
ESS WP4 Strategy for series production ESS TAC10 – 5th to 6th November Lund Sébastien Bousson WP 4 leader.
H-ECCTD KICK-OFF DEVELOPMENT PLAN AND SCHEDULE 16/03/2016.
Technical External Management Requirements Technology Complexity Interfaces Reliability / Performance Quality Planning Controlling Funding / Resources.
CONTROLS OF ESS EMU Jean-François DENIS / Tom JOANNEM.
CONFIGURATION MANAGEMENT AND CONTROL PLAN ESS Quality Assurance and Control workshop (30June) V. HENNION.
ASSEMBLY OF THE IFMIF CRYOMODULE Janic Chambrillon On behalf of the SRF-Linac Team TTC Meetting - June 5th – 8th, Saclay.
ESS Program Plan and Schedule Update
Status and plans for the 3.9 GHz section of XFEL
Medium beta cryomodule demonstrator M-ECCTD
Task T HTS Dipole Magnet Design and Construction
Task 10.3 : 5T HTS Dipole Magnet Design and Construction
WP-46 XFEL 3rd harmonic system XFEL Project Progress Report (1-2010)
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
6th srf collaboration lasa 13 June CAVITY interfaces - Vincent Hennion / PIERRE BOSLAND Bonjour, Franck Peauger, Je suis Ingénieur RF.
XFEL Tuner system non-conformities Detected At saclay
ESS RF Development at Uppsala University
XFEL Cold mass & vacuum vessel non-conformities Detected At saclay
recent activities our company Jean Claude Le Scornet - Tomas JUNQUERA
MID: A MetaCASE Tool for a Better Reuse of Visual Notations
COSI Evaluation of non-nuclear material balance with the COSI software
3rd Workshop on dynamic fuel cycle Timothée Kooyman, DEN,DR,SPRC,LE2C
Daresbury ESS In-Kind Contributions
F. Peauger (mainly for CM components)
General Assembly Meeting
Cryomodule ESS FAT & SAT SRF meetinG on 07/11/2017
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL main evolutions between M-ECCTD and serie - Bonjour, Franck Peauger, Je.
Identification and marking of ESSI deliverables
Cryomodule Product Breakdown Structure and configuration traceability
XFEL cryomodule production and Reliability improvement
Quality assurance and Quality control organisation
Critical design review #1 for medium beta cavity cryomodules 3-4 APRIL SAFETY AND RAMI INPUTS - Franck Peauger OLIVIER KUSTER (INSTALLATION AND.
IKCA CEA Technical ANNEXES Follow up 18th DECEMBER 2015.
SNS-PPU upgrades the existing accelerator structure
10th srf collaboration LASA JUNE CAVITY interfaces - Vincent Hennion
Presentation transcript:

ESS CRYOMODULE RISKS REGISTER ESS CRYOMODULE COMPONENTS AND CAVITY EXPERTISE Franck PEAUGER14th January 2016

RISK REGISTER ESS CRYOMODULE COMPONENTS | PAGE 2

CAVITY EXPERTISE | PAGE 3 Transfert : ESS schedule will explicit limit of responsibilities and change instruction provisions (studies) Mitigation : involvement in Configuration Control Board + close follow-up of accounted hours CEA responsability is directly or undirectly engaged + demands from ESS partners exceed the allocated budget -> CEA support the impact (performance, cost)

COUPLERS | PAGE 4 No industrial company is qualified before the contract + Couplers prototype is qualified by separate parts then integrated and tested by CEA -> Pre-serie will not reach the expected performance during conditionning Analyze schedule impacts with different procurement scenario. Possible multisourcing (2 minimum). Keep the companies involved in prototypes in the business

RF TEST STAND FOR POWER COUPLER CONDITIONNING | PAGE 5 Commissioning of RF source may last 12 months to achieve full reliability (3 months commissioning planned) -> RF source lack of reliability at he start Prioritirize the RF source procurement + Prepare the installation in advance Couplers

COUPLER DOORKNOB | PAGE 6 Couplers doorknob definition is new and technically challenging: -> Couplers doorknob do not respect specifications or difficult to manufacture Test in Spring 2016 : no mitigation except what is foreseen (risk should be re- evaluated) RF trap Kapton insulation

CRYOSTAT COMPONENTS (GASKETS) | PAGE 7 CRYOSTAT COMPONENTS Aluminium material difficult to procure: -> Un-availability of Aluminium gaskets for assembly Procurement of material in advance and test other material

CRYOSTAT COMPONENTS (TUNER MOTORS) | PAGE 8 Tuner motor: only one provider (TSA) -> Un-availability of tuner motors for assembly Procure all the items (128) asap + proper storage conditions (packaging)

RISK REGISTER ESS CRYOMODULE COMPONENTS | PAGE 9 Before mitigationAfter mitigation Synthesis - Risk portfolio Criticity matrix +1 retention

Commissariat à l’énergie atomique et aux énergies alternatives Centre de Saclay | Gif-sur-Yvette Cedex T. +33 (0) xx xx | F. +33 (0) Etablissement public à caractère industriel et commercial | RCS Paris B | PAGE 10 CEA Saclay/Irfu projet ESS | DATE