Mission Street Voyage Advanced Features Test Facility Mission street is a major arterial corridor that was re-timed 10 years prior to our project. Our.

Slides:



Advertisements
Similar presentations
The Components There are three main components of inDepth Lite, inDepth and inDepth+ Real Time Component Reporting Package Configuration Tools.
Advertisements

Case Study 2 New York State Route 146 Corridor. This case study is about a Traffic Impact Assessment for a proposed site development in Clifton Park,
ACS-Lite Offset Tuning Algorithm. Collect data from advance detectors on coordinated approaches Develop a Statistical Flow Profile correlated to the phase.
If the universe were perfectly uniform, then how come the microwave background isn’t uniform? Where did all the structure(galaxies, clusters, etc.) come.
Traffic Controller Methodologies NEMA-based vs. Interval-based
1 Charlie Wetzel, PE, PTOE County Traffic Engineer Seminole County Florida 10/18/11.
WASTE AUDITING 101. What Direction Are You Going?
Welcome to El Dorado Hills. Goals of Presentation Summarize growth, traffic, and road network state affecting planning in EDH - Especially where not easily.
Current Practices in Traffic Signal Coordination
Geometry information from Liufang Ave. North in Beijing Green phase (s): 99,77,66,75,60 Dwell time distribution: N (30,9), N (27,7), N (24,6) Maximal bandwidth:
1 Austin Transportation Department Ali Mozdbar, P.E., PTOE Division Manager, Traffic Signals Traffic Signal Features for Pedestrians & Bicyclists.
Chapter 221 Chapter 22: Fundamentals of Signal Timing: Actuated Signals Explain terms related to actuated signals Explain why and where actuated signals.
Progressive Signal Systems. Coordinated Systems Two or more intersections Signals have a fixed time relationship to one another Progression can be achieved.
Lec 24, Ch.19: Actuated signals and detectors (Objectives) Learn terminology related to actuated signals Understand why and where actuated signals are.
1 Introduction to Macroeconomics Chapter 20 © 2006 Thomson/South-Western.
Lec 15, Ch.8, pp : Signal Timing (Objective)
Lesson 13-Intrusion Detection. Overview Define the types of Intrusion Detection Systems (IDS). Set up an IDS. Manage an IDS. Understand intrusion prevention.
Introduction to Transport
Optimal Adaptive Signal Control for Diamond Interchanges Using Dynamic Programming Optimal Adaptive Signal Control for Diamond Interchanges Using Dynamic.
Customized Simulation Modeling Using PARAMICS Application Programming Interface Henry Liu, Lianyu Chu & Will Recker.
Lecture 2 Basics of Traffic Control Signals Any power-operated traffic control device other than a barricade warning light or steady burning electric lamp,
Peter Koonce TRB Annual Meeting January 9, 2005 Best Practices for Signal Operations Best Practices for Signal Operations – Lessons Learned from the Portland.
2015 Traffic Signals 101 Topic 7 Field Operations.
Transportation Engineering
Applied Transportation Analysis ITS Application SCATS.
Evaluating Robustness of Signal Timings for Conditions of Varying Traffic Flows 2013 Mid-Continent Transportation Research Symposium – August 16, 2013.
GCSE Information Technology Desktop publishing 12 Desktop publishing is the use of a desktop publishing package on a computer to produce publications such.
1 Modeling Active Traffic Management for the I-80 Integrated Corridor Mobility (ICM) Project Terry Klim, P.E. Kevin Fehon, P.E. DKS Associates D.
Using Archived Data to Measure Operational Benefits of a System-wide Adaptive Ramp Metering (SWARM) System TAC Meeting December 13, 2006 Robert Bertini.
Coordinated Operations, notes from the field Edward Fok Resource Center Operations Technical Service Team 2005 TRB Annual Meeting.
Transit Priority Strategies for Multiple Routes under Headway-based Operations Shandong University, China & University of Maryland at College Park, USA.
Chapter 20: Actuated Signal Control and Detection
David B. Roden, Senior Consulting Manager Analysis of Transportation Projects in Northern Virginia TRB Transportation Planning Applications Conference.
Coordination Matt Wiesenfeld Darcy Bullock Purdue University.
TRAFFIC SIGNAL OPTIMIZATION: A Coordinated Effort Tom Dancey, P.E. Signal System Engineer City of Springfield CITY OF SPRINGFIELD & MISSOURI DEPARTMENT.
Implementation Transit Priority System and Mobile Internet Passenger System in the City of Los Angeles Kang Hu and Chun Wong City of Los Angeles Department.
Oregon’s Work Zone Traffic Analysis Program FHWA Work Zone Rule Virtual Workshop November 6, 2008 Irene Toews, P.E. Oregon Department of Transportation.
Incorporating Traffic Operations into Demand Forecasting Model Daniel Ghile, Stephen Gardner 22 nd international EMME Users’ Conference, Portland September.
Company LOGO Ramp Meters. Company LOGO What are Ramp Meters? Part of NaviGAtor, Georgia DOT’s Intelligent Transportation System (ITS) Also includes electronic.
Transit Signal Priority (TSP). Problem: Transit vehicles are slow Problem: Transit vehicles are effected even more than cars by traffic lights –The number.
A Study in Creating Computational Models of Traffic.
University of Minnesota Intersection Decision Support Research - Results of Crash Analysis University of Minnesota Intersection Decision Support Research.
TRANSIMS Version 5 Network Files January 20, 2011 David Roden – AECOM.
 Links the optimized settings to VISSIM, the operational analysis results is: Synchronization of Intersections This study employs the core logic of MAXBAND.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Daivamani Sivasailam TPB Technical Committee October 5,
Problem 4: Okeechobee Road Stopped Control Analysis.
Hcm 2010: BASIC CONCEPTS praveen edara, ph.d., p.e., PTOE
Case Study 1 Problem 3 Styner/Lauder Intersection Moscow, Idaho.
Time Series - A collection of measurements recorded at specific intervals of time. 1. Short term features Noise: Spike/Outlier: Minor variation about.
Review of the Texas Transportation Institute (TTI) 2007 Urban Mobility Report By Ronald F. Kirby Presentation to Transportation Planning Board October.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
OBA functionality in PowerPoint 2007 Purpose : This slide will provide you a quick walk through of the possibility of OBA functionality in Power Point.
Problem 6: Route 146 Arterial Study We’re going to look at 7 intersections simultaneously: the Shenendehowa Campus entrance, Moe Road, Maxwell Drive, Clifton.
Presented by NTOC Webcast Gary Piotrowicz, PE, PTOE OAKLAND COUNTY SIGNAL OPTIMIZATION PROJECT.
Transportation System Comments Santolina Level ‘A’ Master Plan.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Mission Street Project Update Voyage 2070 Advance Operation Systems Using ASTRO Proactive Plan Selection Average and Split Variant operations Prepared.
Thinking Inside the Box
Case Study 4 New York State Alternate Route 7 Problem 4
MOVA Traffic Signal Control Trial
GREEN WAVE TRAFFIC OPTIMIZATION
Applied Technology and Traffic Analysis Program(ATTAP) MIDCAP & MUID
* Topic 7 Field Operations
Maryland Unconventional Intersection Design Analysis Tool
Office of Education Improvement and Innovation
Problem 5: Network Simulation
How to Use the Story Board Layout
How to Use the Story Board Layout
Presentation transcript:

Mission Street Voyage Advanced Features Test Facility Mission street is a major arterial corridor that was re-timed 10 years prior to our project. Our improvements and test facilities are located at 7 intersections along this corridor from I-5 Northbound off-ramp west to 17 th street.

Inbound AM Outbound PM

Prior to improvements Mission street travel times were from 8 to 11 minutes each direction during peak periods. Post installation of Voyage Stage 2.0 found travel times to be 4 to 4.5 minutes each way an reduction of 50-60%.

This project was originally conceived as a proof of product test facility for NWS Advanced Voyage firmware Features and 2070 controller training. With the help of NWS, cooperation of the City of Salem, Region 2, TSSU, members of the VUG (Voyage User’s Group), and ODOT electrical crews, this project was taken from concept to reality. Beginning in January of 2010 ODOT placed new 2070 controllers on the street.

The test project was designed to proceed in logical stages. Stage 1.0 used the original 170 timing. Some minor revisions were made to allow for beginning of main street green as the reference point. Additional time was added for Ped. Walk/FDW and phase Red/Yellow transitions to meet current standards.

From the beginning we found that the installation of straight line conversions yielded nearly 20% improvements to operations, volume through put and the travel times with an overall reduction in delay for the entire system. This was believed to be due to the inclusion of POM (ped. override mode) and the fact that the 2070’s get into step from transitions quicker than the 170’s.

The next phase of the operation stage 2.0 used Synchro to model optimized timing splits and coordination plans. Lots of plans! 17 to be exact an entire library that covers the entire day M-F plus weekends. Fact is we only have 8 basic plans to produce. These 8 plans are then ‘cloned’ to produce remaining plans.

The actual base plans or ‘Host’ plans serve as just that, hosts to their respective clones or ‘Guest’ plans. Host plan 8 serves the morning heavy plan ‘Triad’ and has two ‘Guest’ plans. Plans 7 and 9 which are exact copies of the Host plan. This saves time and will allow the population of the plans library in very short order. Later in stage we will make appropriate adjustments to critical movement splits in guest plans that will better use the limited cycle length to the fullest without causing transitions or adjustments in the off-sets or cycle lengths.

The last comment is the most important to this concept. Voyage uses the same cycle length and off-set for the guest plans as that of the hosts. This means no transitions between plans and a smooth re-allocation of cycle time to serve needy phases.

With the plans library was populated with host and guest plans designed to cover the various traffic conditions through the day we activated transparent PPS and SVO operations. This allowed us to collect appropriate v+ko data from the background without activating the advanced operations features on the street.

Plans Library Host Plans are 5,8,12, and 15 Guest Plans are located above and below Host plans as shown with 4,6,7,9,11,13,14, and 16

So how do we identify those needy phases we discussed? Stage 2.0 the start of Voyage advance features operations. In this stage we set up master system detection. One of the primary steps to development of Voyage Proactive Plan Selection and Split Variant Operations. This step is critical in the operations and will require some sound judgment and observations.

Two outbound master system detectors Outbound flow   Inbound flow Two outbound master system detectors

Outbound flow   Inbound flow

Two inbound master system detectors Two outbound master system detectors Outbound flow   Inbound flow

With our initial placements of these detectors we found many issues. Our second placement had better results for the inbound systems but, found the outbound to be questionable.

Two inbound master system detectors Three outbound master system detectors Outbound flow   Inbound flow

Our third attempt, Stage 2.1, Placed the outbound master system detection at the phase 2 approach lane to Hawthorn. This placement resulted in improved data. Allowed us to move to the next phase of the test operations.

Three outbound master system detectors placed at a single location provided smooth and consistent V+ko values. Outbound Master system detectors 

Stage (currently fully activated) plan selection with Proactive Average, and Split Variant inbound or outbound operations. In the next slide we see a typical v+ko and plan selection log as provided by the master system logs in Voyage.

With this detection layout we capture the fluctuations that occur in the morning rush and can make appropriate adjustments to the normal operational splits that the host plan or medium plan is using. As you can see at 7:45 there is a significant rise in the v+ko values. The system responds nearly as quickly as the rise in the values and is prepared for the in flow of the added traffic. Once the event passes the system makes a quick adjustment to the lower host plan and then to the low volume guest plan.

We can see this event in the graph that shows the relationship of the v+ko values and the plan selection. Due to the scale of this graph and short preparation time you can not see the lower graph line of the plan selection but, in the previous plan you can see the relationship of these values.

The previous and following slides show the relationship between plans, their start and stop times, and the threshold v+ko values that drive selections. I’m currently working to build an Excel tool that will allow us to use the raw data from the controller with plan overlays, optimized target volumes, and start / stop times of each operation. The tool should allow us to graphically select v+ko threshold values appropriate to the operations. Even without the this tool we can see the relationship of these thresholds.

In this slide you can see that the v+ko values for the morning operations have levels that will keep the system operational in the primary host plan until such time as the v+ko values drop or rise above the operational parameters of this host plan. In the case of the time after 9:30 we see that we can shift some of the split time from a major phase and use that time in the minor phases.

Synchro Optimizations determined cycle lengths. In this process I found that if I build plans that correspond to the appropriate host and guest plans for each of the target values could determine high, med. and low operation limits. These models currently need to be revised, the volume data for the each intersection and re-run the simulations. Data used was a copulation of several days and times of the year and then used that growth factor to inflate or deflate these values for the models as they stand today.

` Synchro file Synchro file

With the data provide by Voyage MOE logs we can track the areas of concern. Use these measures to determine the extent of improvement gained by the adjustments we make along the way. Each intersection has a story to tell and areas that will either identify problems and/or optimal use of the green times for the intersection at a glance. The following slides illustrate this concept and show the relative improvements gained with the activation of the advanced feature operations.

Given the relative ease of this process and the level of improvement we can make major improvements across the state. Very good results with any or all of these features. Proactive Average is probably the most useful out of the box feature. Split Variant Operations can gain estimated 5 to 10 percent improvement for short term conditions through the day. Other features can be added to these features to further improve performance. Are there any questions?