CTSSv3 Cutover Checklist Draft 3 JP Navarro, Lee Liming May 25, 2006.

Slides:



Advertisements
Similar presentations
TeraGrid Deployment Test of Grid Software JP Navarro TeraGrid Software Integration University of Chicago OGF 21 October 19, 2007.
Advertisements

Internet Information Services 7.0 and Internet Information Services 7.5 Infrastructure Planning and Design Published: June 2008 Updated: November 2011.
Upgrading the Oracle Applications: Going Beyond the Technical Upgrade Atlanta OAUG March 19, 1999 Robert Cooney.
Quality Assurance (QA) Working Group Update February 11, 2010 Kate Ericson (SDSC) Shava Smallen (SDSC)
NA3 DORII: Deployment of Remote Instrumentation Infrastructure David Gutiérrez – Emilio Díaz University of Cantabria NA3 – Application.
The Premier Software Usage Analysis and Reporting Toolset CELUG Presentation – May 12, 2010 LT-Live : License Tracker’s License Server Monitor.
Compliance on Demand. Introduction ComplianceKeeper is a web-based Licensing and Learning Management System (LLMS), that allows users to manage all Company,
Workflow & Event Derivation Workshop
Windows Monitoring Yancy Ribbens
1 CENTER FOR PARALLEL COMPUTERS An Introduction to Globus Toolkit® 3 -Developing Interoperable Grid services.
The Apache Web Server  Started in April 1996 as an open source multiplatform web server (Windows, FreeBSD, UNIX, and Linux compatible).  Now the world’s.
Task Management System Client xx Team Member 1 Member 2 Member 3 This is not a real project, but a student project carried out for a system requirements.
Dev.globus a framework for open Globus development Lisa Childers Argonne National Laboratory University of Chicago.
Workflow & Event Derivation Workshop
© 2013 Jones and Bartlett Learning, LLC, an Ascend Learning Company All rights reserved. Security Strategies in Linux Platforms and.
Module 16: Software Maintenance Using Windows Server Update Services.
Kate Keahey Argonne National Laboratory University of Chicago Globus Toolkit® 4: from common Grid protocols to virtualization.
1 of 5 This document is for informational purposes only. MICROSOFT MAKES NO WARRANTIES, EXPRESS OR IMPLIED, IN THIS DOCUMENT. © 2007 Microsoft Corporation.
DBSi 5.0 Deployment Overview
Deferred Site Collection Upgrade Self-Service Site Collection Upgrades.
TeraGrid Information Services December 1, 2006 JP Navarro GIG Software Integration.
GIG Software Integration Project Plan, PY4-PY5 Lee Liming Mary McIlvain John-Paul Navarro.
1 Session Number Presentation_ID © 2001, Cisco Systems, Inc. All rights reserved. Using the Cisco TAC Website for IP Routing Issues Cisco TAC Web Seminar.
TeraGrid Information Services John-Paul “JP” Navarro TeraGrid Grid Infrastructure Group “GIG” Area Co-Director for Software Integration and Information.
IMC service provider bidding steps. Add your Username and Password as shown above.
TeraGrid Information Services JP Navarro, Lee Liming University of Chicago TeraGrid Architecture Meeting September 20, 2007.
Cloud SharePoint Existing sites and services App web (optional) Existing sites and services App web (optional) Host web App web.
Module 13: Maintaining Software by Using Windows Server Update Services.
Web Trnsport – Beta Testing and Implementation TUG Roundtable Discussion Elizabeth Rodgers Info Tech, Inc. October 9, 2007.
E-MetroTel UC X Wallboard Overview Sales Overview 05 Dec 2013 E-MetroTel Proprietary and Confidential E-MetroTel is where EVERGREEN is alive and well.
Dynamic Firewalls and Service Deployment Models for Grid Environments Gian Luca Volpato, Christian Grimm RRZN – Leibniz Universität Hannover Cracow Grid.
CTSS 4 Strategy and Status. General Character of CTSSv4 To meet project milestones, CTSS changes must accelerate in the coming years. Process –Process.
CERN IT Department CH-1211 Genève 23 Switzerland t Service Management GLM 15 November 2010 Mats Moller IT-DI-SM.
GT Components. Globus Toolkit A “toolkit” of services and packages for creating the basic grid computing infrastructure Higher level tools added to this.
HPDC 2007 / Grid Infrastructure Monitoring System Based on Nagios Grid Infrastructure Monitoring System Based on Nagios E. Imamagic, D. Dobrenic SRCE HPDC.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks Simply monitor a grid site with Nagios J.
Yannick Patois – Datagrid Repository Presentation- 2001/11/21 - n° 1 Partner Logo DataGrid Software Repository presentation A short presentation of the.
ESnet Site Coordinators Committee (ESCC): IPv6 Activities & Directions Phil DeMar (ESCC Chair) HEPix IPv6 Workshop (CERN) June 22, 2011.
1Offline Weekly Meeting May May 2006 AliRoot Build Integration and (Testing) System Peter Hristov Vagner Morais.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Change and Configuration Management.
Project Café Update LRTL Meeting November 2008 Jason Schober Director, Project Café
Release Management Configuration management. Release Management Goal Coordinate the processes through the project development life cycle Ensure the.
CoBrow Collaborative Browsing A Virtual Presence Service RE 1003 RE 4003.
TeraGrid CTSS Plans and Status Dane Skow for Lee Liming and JP Navarro OSG Consortium Meeting 22 August, 2006.
CN2140 Server II Kemtis Kunanuraksapong MSIS with Distinction MCT, MCITP, MCTS, MCDST, MCP, A+
SAN DIEGO SUPERCOMPUTER CENTER Inca TeraGrid Status Kate Ericson November 2, 2006.
RUBRIC IP1 Ruben Botero Web Design III. The different approaches to accessing data in a database through client-side scripting languages. – On the client.
CIT 470: Advanced Network and System AdministrationSlide #1 CIT 470: Advanced Network and System Administration Change and Configuration Management.
Microsoft Management Seminar Series SMS 2003 Change Management.
November 8, Agenda Welcome Accessibility Reminders Service and Software Updates Reminders.
Portal Update Plan Ashok Adiga (512)
BUSINESS USER MONITORING OBSERVEIT 5.8. Firewall IDS IAM SIEM Business Users IT Users USERS ARE GATEWAYS OF RISK Contractors Systems AppsData.
1 Aspire Document Processing 1. 2 Document Processing – “Aspire” Very High Performance Structured Document Processing Architecture Dynamic configuration.
Attribute-based Authentication for Gateways Jim Basney Terry Fleury Stuart Martin JP Navarro Tom Scavo Nancy Wilkins-Diehr.
Quality Assurance (QA) Working Group Update July 1, 2010 Kate Ericson (SDSC) Shava Smallen (SDSC)
CTSS Rollout update Mike Showerman JP Navarro April
Software Integration Highlights CY2008 Lee Liming, JP Navarro GIG Area Directors for Software Integration University of Chicago, Argonne National Laboratory.
Learning Outcomes 1. Know software installation processes 2. Be able to prepare for software installation 3. Be able to install and configure software.
Maintaining and Updating Windows Server 2008 Lesson 8.
CACI Proprietary Information | Date 1 PD² v4.2 Increment 2 SR13 and FPDS Engine v3.5 Database Upgrade Name: Semarria Rosemond Title: Systems Analyst, Lead.
EGEE-III INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks The Dashboard for Operations Cyril L’Orphelin.
EduBrite Training for Group Admins. Dashboard Reports Groups Enrolled courses More items under this menu.
Financial System Upgrade Agency Change Champion Deployment Session March 16 th, 2006.
Call Center Support Process Web Support & Maintenance for BGC Partners Version 1.1 June 3, 2016 Notice: The enclosed material is proprietary to TRIZE Consulting.
Supporting quality devices
Welcome to the world of CRISIS COMMANDER
New Functionality “Assign a Cart” (April 23, 2007)
CIT 470: Advanced Network and System Administration
Procedures for TG Internal Review
Presentation transcript:

CTSSv3 Cutover Checklist Draft 3 JP Navarro, Lee Liming May 25, 2006

Operations New routing instructions for mds.teragrid.org problems to GIG services (June 5) Change routing instructions for CTSSv3 problems to site admins (June 19) Monitoring changes? (June 19) Any other tasks?

Documentation Post software keys documentation draft (June 5) Post details about $TG_EXAMPLES/.soft.ctssv3 template (June 5) Transition CTSSv3 testing page (June 19) Transition tgcp/data movement pages (June 19) Transition GRAM documentation pages (June 19) Transition srb-client documentation (June 19) Transition CTSSv3 and software keys documentation (June 19) Any other tasks?

User Services Send users a heads up notification (June 5) –Make point about users transitioning their own environments –Make point about new service hostnames and ports –Point to GT4 testing page Review testing results and make go/no-go decision (?) Send users a notification of cutover (June 16 or 18) –Make point about users transitioning their own environments –Make point about new service hostnames and ports –Point to updated documentation

Software WG, GIG SI Critical production Inca tests deployed (May 16) Software-wg checkoff that critical Inca tests are the right tests (May 30) Update CTSSv3 spreadsheet with latest status (May 22, 29, June 5) Review testing, software, service status and make go/no-go decision (?)

Service Transition - GridFTP gridFTP/tgcp (software-wg, data-wg) –Sites notify data-wg of their production gridFTP config (May 26) –Production gridFTP config provided to documentation group (May 30) –Define gt2-gridftp alias for GT2 gridFTP host (June 9) –tgcp configuration checkout freeze (June 9) –Production tgcp configurations in repo cvs (June 16) –Move GT2 gridFTP service from tg-gridftp:2811 to gt2-gridftp:2812 (June 19) –Define tg-gridftp dns alias to round-robin to all GT4 striped gridftp data movers (June 19) –Move GT4 gridFTP services from tg-gridftp:2812 to tg-gridftp:2811 (June 19) –Download and install production tgcp configuration (June 19)

Service Transition - other Gram (software-wg) –Move GT2 GRAM service from :2119 to :2120 (June 19) –Move GT4 pre-WS GRAM service from :2120 to :2119 (June 19) GT4 Web Services container (GRAM, RFT, MDS) –No service transition needed GT4 RLS –No service transition needed

Software Transition User environment/software transition (software-wg, services-wg) –New software environment keys standardized (June 2) –New software keys deployed (June 5) –New $TG_EXAMPLES/.soft.ctssv3 template deployed (June 5)