Proton Plan Eric Prebys, FNAL Accelerator Division.

Slides:



Advertisements
Similar presentations
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Advertisements

Chris Smith Booster RF Cavity Upgrade Contents: The Booster Existing RF Cavities Why Upgrade? New Cavities Prototype Plans University Involvement Prototype.
1 Proton Upgrades at Fermilab Robert Zwaska Fermilab March 12, 2007 Midwest Accelerator Physics Collaboration Meeting Indiana University Cyclotron Facility.
Linac Status Eric Prebys DOE Review, Proton Source Breakout Session July 21,2003.
NOvA meeting PIP Update W. Pellico. PIP Goals and Scope (Provided in 2011 – Directorate S. H. / DOE Talk ) Goals: Specific to the issues surrounding the.
Proton Plan PMG 3/22/07 E Prebys 1 Proton Plan Status February Eric Prebys.
Proton Plans at Fermilab Robert Zwaska - Fermilab Science and Engineering at Henderson- DUSEL Capstone Workshop Stony Brook University May 5, 2006 Outline.
F MI High Power Operation and Future Plans Ioanis Kourbanis (presented by Bruce Brown) HB2008 August 25, 2008.
Run II DOE Review - Booster Eric Prebys Booster Group Leader FNAL Beams Division.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
SNuMI (>1MW) SNuMI 1 Motivations for SNuMI The neutrino experimental program for the next decade –NOνA (long baseline νμ→νe search) –MINERνA (Main Injector.
Proton Plan Director’s Review 8/15/06 Prebys 2006 Shutdown Eric Prebys, FNAL Accelerator Division.
Run II PMG 2/16/06 Martens/Sims 1 Run II Upgrades Status February 2006.
AAC February 4-6, 2003 Protons on Target Ioanis Kourbanis MI/Beams.
F Overview of the SuperNuMI Plan A. Marchionni, Fermilab AD/MID Accelerator Advisory Committee, May 10-12, 2006.
F Project X Overview Dave McGinnis October 12, 2007.
Proton Planning Eric Prebys FNAL Accelerator Division.
Experimenter Contributions to Booster Improvements Eric Prebys FNAL Accelerator Division.
Proton Study Meeting 4/19/05 Eric Prebys 1 Proton Plan Stage I Eric Prebys.
Recent RF Development at Fermilab Weiren Chou and Akira Takagi Fermilab, U.S.A. July 7, 2003 Presentation to the FFAG03 Workshop July 7-12, 2003, KEK.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Diagnostics in the Fermilab Proton Source (Linac + Booster) Eric Prebys FNAL Beams Division.
New Corrector System for the Fermilab Booster E.J. Prebys, C.C. Drennan, D.J. Harding, V. Kashikhin, J.R. Lackey, A. Makarov, W.A. Pellico Fermilab, Batavia,
Booster Issues for NuMI Eric Prebys FNAL Beams Division.
F Proton Plan Eric Prebys and Ioanis Kourbanis, FNAL Accelerator Division.
All Experimenters' Mtg - Aug. 04, 2003 Week in Review: 07/28/03 –08/03/03 Doug Moehs – FNAL Stores and Operations Summary Standard Plots.
F AAC Review, May 10, Prebys 1 Answer to Question  What is the analysis backing up the claim that the losses will be reduced with the new corrector.
Booster Acceptance, Apertures, and Alignment Kiyomi Seiya Proton Source WorkshopDecember 07, 2010.
Proton Plan PMG 7/7/05 E Prebys 1 Proton Plan Status June Report Eric Prebys.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Proton Plan PMG 9/27/07 E Prebys 1 Proton Plan Status Eric Prebys.
Proton Source 1/12/07 E Prebys 1 Proton Delivery Because MiniBooNE is off.
F All Experimenters' Mtg - 2 Jun 03 Weeks in Review: 05/19/03 –06/02/03 Keith Gollwitzer – FNAL Stores and Operations Summary Standard Plots.
Proton Improvement Plan Overview Bob Webber July 13, 2011.
Getting the Booster to 2010 Eric Prebys December 20, 2002 Outine Longevity Issues Non-radiation related Radiation related Personnel Performance Issues.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
What’s Up in the Booster Eric Prebys February 27, 2002 and March 6, 2003.
Proton Planning – Major Projects, Schedule, Decisions, and Projections Eric Prebys FNAL Accelerator Division.
Doug Michael Sep. 16, GeV protons 1.9 second cycle time 4x10 13 protons/pulse 0.4 MW! Single turn extraction (10  s) 4x10 20 protons/year 700.
Proton Plan PMG 2/23/06 E Prebys 1 Proton Plan Status January Report Eric Prebys.
Proton Plan Expectations Eric Prebys AD/Proton Source.
Run II PMG 1/19/06 Pushpa Bhat 1 Run II Upgrades Status January 2006 Pushpa Bhat.
Dave Johnson July 12, 2010 NOvA/ANU Recycler Upgrades Review Optics, Apertures, and Operations Nova-doc 4930.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Main Injector Beam Position Monitor Upgrade: Status and Plans Rob Kutschke All Experimenters’ Meeting April 3, 2006 Beams-doc-2217-v3.
Proton Plan PMG 2/22/07 E Prebys 1 Proton Plan Status January Eric Prebys.
Status of the Accelerator Complex Keith Gollwitzer Antiproton Source Accelerator Division Fermilab 2009 Fermilab Users’ Meeting.
High Intensity Booster Operations William Pellico PIP II collaboration Nov. 9 th 2015.
Users' Mtg - 4 Jun 08 FNAL Accelerator Complex Status Ron Moore Fermilab – AD / Tevatron Dept.
SNuMI: WBS 1.1 Booster Upgrades Eric Prebys $642K FY06$ (no contingency, no G&A) xx% contingency Main Injector & Recycler BNB NuMI Tunnel Booster Ring.
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Summary Director’s Review August 2006 Eric Prebys.
Proton Planning Eric Prebys FNAL Accelerator Division.
Proton Plan PMG 10/13/05 E Prebys 1 Proton Plan Status September Report Eric Prebys.
Early Beam Injection Scheme for the Fermilab Booster: A Path for Intensity Upgrade Chandra Bhat Fermi National Accelerator Laboratory DPF2015, ANN ARBOR,
Proton Plan Director’s Review 8/15/06 Prebys Proton Plan Answers to Questions Director’s Review August 2006 Eric Prebys.
Proton Source July 21, 2006 E Prebys 1 Proton Plan Meeting Agenda:  Review of parameter list: Prebys, Kourbanis  Status of writing assignments Prebys,
Proton Plan PMG 4/18/05 E Prebys/J. Sims 1 Proton Plan Status March Report Eric Prebys Jeff Sims.
F Proton Plan Eric Prebys, FNAL Accelerator Division.
Toward a Proton Plan Eric Prebys Fermilab Accelerator Division.
Proton Improvement Plan Bob Zwaska September 9, 2013 All-Experimenters Meeting.
BooNE Meeting, January 15, Prebys 1 How are we doing? Best running Power loss (W) Protons (p/min) Energy Lost (W-min/p) Best running again ? Mysterious.
PAC Meeting, December 12, Prebys 1 The Problem.
Run II Status Keith Gollwitzer Temple Review July 1, 2003.
Intensity Dependent Quad Ramps We know that in order to get the most intensity, the quad ramps must be tuned for a particular intensity. The way this is.
Proton Plan Eric Prebys, FNAL Accelerator Division.
Limitations to Total Booster Flux Total protons per batch: 4E12 with decent beam loss, 5E12 max. Average rep rate of the machine: –Injection bump magnets.
Proton Economics Eric Prebys FNAL Accelerator Division.
Accelerator Division View Sergei Nagaitsev DOE Independent Project Review of PIP-II 16 June 2015.
Booster Corrector Review, Oct. 10 th, 2006 E. Prebys Introduction/Specifications Eric Prebys Proton Plan Manager.
Proton Plan (short version) (BEAMS-DOC-1441) Eric Prebys, FNAL Accelerator Division.
Presentation transcript:

Proton Plan Eric Prebys, FNAL Accelerator Division

Proton Plan, November 11 th, Prebys 2 Acknowledgements  Proton Plan Team  Jeff Spalding  Bruce Baller  Significant contributors (in no particular order)  Alberto Marchionni (MI)  Ioannis Kourbanis (MI)  Kiyomi Koba (MI)  Bill Pellico (PS)  Jim Lackey (PS)  Larry Allen (PS)  Elliott McCrory (PS)  John Reid (RF)  Dave Harding (TD)  Dan Wolf (EE)  Weiren Chou (Integration)  Peter Garbincius (Management)  Dave McGinnis (Management)  + others

Proton Plan, November 11 th, Prebys 3 Charge  Develop a plan for a reasonable set of improvements and operational initiatives to maximize proton delivery to NuMI and the Booster Neutrino Beam (BNB) over the next ten years or so.  Estimate the budget and timeline for these improvements.  Estimate proton delivery to both beam lines if the Plan proceeds on schedule.  Note: this plan is exclusive of the Proton Driver, which we assume will one day replace the existing Proton Source (Linac+Booster).

Proton Plan, November 11 th, Prebys 4 From the Executive Summary  We present a three-year plan for increasing the proton intensity delivered to the two currently approved neutrino experiments, with upgrades to the Linac, Booster and Main Injector. When the elements of this plan are completed, NuMI will accumulate approximately 3.4E20 protons per year. BNB will receive approximately 2.2E20 protons per year, however the latter estimate is highly dependent on the performance of the Booster and other efficiency factors.  The preliminary estimate for the total cost of this plan, including 46% contingency, is $34M ($23M M&S, $10M labor SWF). The labor cost estimate includes technical, physicist and project management effort. Overhead is not included in these estimates.

Proton Plan, November 11 th, Prebys 5 Strategy  Increasing the proton delivery from the Booster to NuMI and MiniBooNE  Increase maximum average Booster repetition rate  by increasing acceptance, and by improving orbit control (less loss for more beam).  Increasing the beam intensity in the Main Injector for NuMI  Main Injector multi-batch operation  Slip stacking in Main Injector (requires RF upgrade)  Improving operational reliability and radiation limitations  Linac quad supplies  Booster and Linac Instrumentation  Booster RF Upgrade  Investigate 7835 Problem

Proton Plan, November 11 th, Prebys 6 Breakdown of Plan WBSDescription M&S Base M&S Cont M&S Total SWF Base SWF Cont SWF Total 1Proton Plan16,51342%23,4866,64857%10, Linac Upgrades2,70586%5, %1, Linac PA Vulnerability2,000100%4, % Linac Quad Power Supplies61750% % Linac Instrumentation Upgrade8830% %80 1.2Booster Upgrades6,49935%8,7652,77754%4, Determine Rep Rate Limit % ORBUMP System25642% % Corrector System62958% %1, Hz Harmonic1,03135%1, % Gamma-t System % Alignment Improvements % Drift Tube Cooling1050%151050% Booster RF Cavity # % % Booster Solid State RF PA's4,20030%5, %1, Booster Instrumentation7327% % Main Injector Upgrades7,29432%9,6612,02660%3, Large Aperture Quads19450% % Main Injector Collimator200100% % NUMI Multi-batch Operation % Main Injector RF Upgrade6,90030%8,9701,22050%1, Management1532% %1,296

Proton Plan, November 11 th, Prebys 7 Linac Projects  1.1: PA Vulnerability  Come up with a plan for dealing with the Linac Power Amplifier (7835) situation once and for all. Investigate: Low Energy Linac replacement Other tubes (e.g. Thales 629) Other 200 MHz power (e.g. multi-beam klystrons) In-house fabrication Significant collaboration with Burle  Submit report to AD head by Feb,  1.2: Pulse Quad Power Supplies  Replace pulsed quadrupoles in the old Linac  Very similar to pulsed supplies in newer linac  1.3: Instrumentation Upgrade  Inadequate Linac instrumentation has led to extended periods of non-optimal running  Only 1/3 of BPM’s instrumented.  Project started in 2004  Add 10 MHz digitizers to old linac RF stations  Move existing BPM digitizers to High Energy Linac  Instrument all BPM’s with 10 MHz digitizers.

Proton Plan, November 11 th, Prebys 8 Booster Projects  2.1: Determine the Booster repetition rate limit  Once the other upgrades described here are complete, the Booster will be capable of extended running at 15Hz, except for the RF system.  The limit is believed to be 8-9Hz, limited by the main power, but this is not well understood.  Although the current scope of the plan does not require us to go beyond 9 Hz, we feel it is important to understand the limitation and what would be required to elimiate it.  2.2: ORBUMP System  Existing injection bump (ORBUMP) has two problems Average repetition rate of the magnet and power supply is limited to 7.5 Hz by heating. It lacks the power to move the beam out far enough at injection, resulting in a mismatch  Plan is to replace the (4) magnets and power supply  Magnet fabrication is under way, with the first magnet just completed.  Aim to put new system in place during 2005 shutdown.

Proton Plan, November 11 th, Prebys 9 Booster Projects (cont’d)  2.3: Booster corrector system  Each of the 48 subperiods of the Booster have a trim package which contains H and V dipoles, as well as a quadrupole and a skew quadrupole.  These are not adequate to control beam position or tune through the cycle.  There would also be benefits to putting a sextupole in each package.  We are working with TD to design a new corrector package for the Booster, which will allow precise control of both beam position and tune throughout the cycle. Beam position around ring, relative to injection, at various times in cycle V H

Proton Plan, November 11 th, Prebys 10 Booster Projects (cont’d)  2.4: 30 Hz harmonic  The booster lattice magnets operate in a 15 Hz offset resonant circuit.  By modifying the magnet girdirs to ad a 30 Hz component, we could reduce the maximum acceleration rate, which is equivalent to increasing RF accelerating voltage  This would allow us to accelerate more beam per batch.

Proton Plan, November 11 th, Prebys 11 Booster Project (cont’d)  2.6: Gamma-t System  The booster transition jump system has a long history.  May be necessary to fully take advantage of other upgrades to increase batch intensity.  It suffers from misalignment problems and exacerbates coupled bunch instabilities, so we don’t use it.  Will schedule a series of studies to make a either make it work or decide to abandon it within a year.  2.7: Alignment  The Booster has never been properly aligned  Made significant progress in the vertical plane and with RF cavity alignment over the last year.  Over the shutdown, did a TeV style 3D laser tracker network and as-found.  Will use this data to form a plan for girder moves over the next year or so.

Proton Plan, November 11 th, Prebys 12 Evaluate Effect of Improvements  Calculate effect of various improvments based on increased acceptance (a la McGinnis):  Use: Effective aperture reduction ConditionDate AA max Dmax beta AcceptanceRelative Completed(mm)(m) (  -mm-mr) Increase (%) Start of MiniBooNE Dogleg 3 FixOct Dogleg 13 FixOct AlignmentOct ORBUMPOct correctorsOct Ideal

Proton Plan, November 11 th, Prebys 13 Effect on Max Proton Intensity  Prior to this shutdown, regularly delivering 7.5E16pph with ~40% reduction in activation around most of the Booster.  Assume after another year of tuning and collimator optimization, we could have hit 1E17 pph with no other improvments (“fallback” =.9E17).  Operational experience: tuning asymptotically approaches benefit of a particular improvement:  Assume after one year of tuning, 50% of the benefit of a particular improvement is realized (fallback = 25%). Date“Design” Limit (1E16 p/hr) Fallback Limit (1E16 p/hr) Comment 1/ Effect of collimators, dogleg fix, plus some alignment 1/ Alignment and ORBUMP 1/ New corrector system

Proton Plan, November 11 th, Prebys 14 Predicted Proton Intensity Limits

Proton Plan, November 11 th, Prebys 15 Calculating NuMI PoT  Even the fallback scenario accommodates NuMI operation.  Assume the following  Ramp up to full 5*5E12 batch operation by April 2005  Ramp up to full 9*5.5E12 batch slipstacked operation a few months after MI RF upgrade.  90% efficiency during slip stacking.  10 month operation each year.  81% total uptime for remainder of years (based on MiniBooNE. Includes scheduled and unscheduled downtime).  85% avg/peak operating efficiency (negotiable).  Will add:  Extra downtime for shot setup and fast transfers (~10%).

Proton Plan, November 11 th, Prebys 16 Calculating MiniBooNE PoT  Trickier:  Still limited by beam loss, NOT rep. rate.  Assume antiproton and NuMI have priority, so  MB VERY sensitive to proton limit and its fluctuations.  Use: (avg pph) = (pph lim.)*η – (NuMI pph) – (pbar pph)  Also assume:  10 month operation  81% up time (based on 2004)  Will add:  Increased protons during shot setup. Avg/pk ~ 86%

Proton Plan, November 11 th, Prebys 17 Machine Loading

Proton Plan, November 11 th, Prebys 18 “Design” PoT Phase Booster Batch Size Main Injector Load Cycle Time MI Intensity Booster Rate* Total Proton Rate Annual Rate at end of Phase (AP + NuMI)(sec)(protons)(Hz)(p/hr)NuMIMini-BooNE July, 045.0E E E E+20 I5.10E  E E+172.4E+201.2E+20 II5.3E E E+172.4E+20 III 5.50E+12 † E E+173.7E+201.6E Hz (beyond plan) 5.50E E E+173.7E+204.4E+20

Proton Plan, November 11 th, Prebys 19 “Design” Totals

Proton Plan, November 11 th, Prebys 20 “Fallback” Totals