Proposal to change bunch length during physics fills to assess beam induced heating after LS1 M. Barnes, P. Baudrenghien, A. Burov, S. Claudet, S. Jakobsen,

Slides:



Advertisements
Similar presentations
Impedance of new ALICE beam pipe Benoit Salvant, Rainer Wanzenberg and Olga Zagorodnova Acknowledgments: Elias Metral, Nicolas Mounet, Mark Gallilee, Arturo.
Advertisements

MD#2 News & Plan Tue – Wed (19. – 20.6.) DayTimeMDEiCMP Tue06: GeV  4 TeV: Ramp for chromaticity - missed A 08:00Ramp down 10: GeV: Large.
Bunch Flattening with RF Phase Modulation T. Argyropoulos, C. Bhat, A. Burov, J. F. Esteban Müller, S. Jakobsen, G. Papotti, T. Pieloni, T. Mastoridis,
Outcome of yesterday’s brainstorming on the potential of using CALIFES or CTF3 electron beam for impedance studies Elias Métral, Benoit Salvant, Carlo.
RF contact non conformities in LHC interconnects: Impedance aspects N. Mounet, B. Salvant With the help of: Gianluigi Arduini, Vincent Baglin, Serge Claudet,
AB-ABP/LHC Injector Synchrotrons Section CERN, Giovanni Rumolo 1 Final results of the E-Cloud Instability MDs at the SPS (26 and 55 GeV/c) G.
First measurements of longitudinal impedance and single-bunch effects in LHC E. Shaposhnikova for BE/RF Thanks: P. Baudrenghien, A. Butterworth, T. Bohl,
Monday 29 October 08:48 V/dM scan CMS end of fill #3236. Check of “fast scan”. 10:06 V/dM scan finished, start of RF studies, reducing RF voltage. 11:10.
G. Rumolo, G. Iadarola, H. Bartosik, G. Arduini for CMAC#6, 16 August 2012 Many thanks to: V. Baglin, G. Bregliozzi, S. Claudet, O. Dominguez, J. Esteban-
History and motivation for a high harmonic RF system in LHC E. Shaposhnikova With input from T. Argyropoulos, J.E. Muller and all participants.
RF strategy, limits and issues A. Butterworth L. Arnaudon, Ph. Baudrenghien, O. Brunner, E. Ciapala, W. Hofle, J. Molendijk, E. Shaposhnikova, J. Tuckmantel,
LSWG day: Impedance and beam induced heating Nicolas Mounet *, Daria Atapovych, Nicolò Biancacci, Elias Métral, Tatiana Pieloni, Stefano Redaelli, Benoit.
Elias Métral, LHC Beam Commissioning Working Group meeting, 08/06/2010 /191 SINGLE-BUNCH INSTABILITY STUDIES IN THE LHC AT 3.5 TeV/c Elias Métral, N. Mounet.
Update on BGV impedance studies Alexej Grudiev, Berengere Luthi, Benoit Salvant for the impedance team Many thanks to Bernd Dehning, Massimiliano Ferro-Luzzi,
Update on BGV impedance August 1 st 2013 Alexej Grudiev, Berengere Luthi, Benoit Salvant for the impedance team Many thanks to Bernd Dehning, Massimiliano.
Status from the collimator impedance MD in the LHC Collimation team:R. Assmann, R. Bruce, A. Rossi. Operation team:G.H. Hemelsoet, W. Venturini, V. Kain,
Injection Energy Review D. Schulte. Introduction Will review the injection energy So could answer the following questions: Which injection energy can.
Some ideas for/from the SPS LIU-SPS team. Scrubbing (only) for ecloud in SPS? aC coating remains baseline..... –but scrubbing has many potential advantages.
Beam induced heating Benoit Salvant, with the invaluable input and help of many colleagues: Collimation team: Oliver Aberle, Ralph Assmann, Roderik Bruce,
LHC Progress Thursday 29 th October 2015 Coordination Week 44: Massimo Giovannozzi, Wolfgang Hofle, Jorg Wenninger.
The HiLumi LHC Design Study (a sub-system of HL-LHC) is co-funded by the European Commission within the Framework Programme 7 Capacities Specific Programme,
Elias Métral, ICFA-HB2004, Bensheim, Germany, 18-22/10/ E. Métral TRANSVERSE MODE-COUPLING INSTABILITY IN THE CERN SUPER PROTON SYNCHROTRON G. Arduini,
Heat load analysis for Inner Triplet and Stand Alone Modules H. Bartosik, J. Hulsmann, G. Iadarola and G. Rumolo LBOC meeting 28 October 2014 Based on.
News on TMCI in the SPS: Injecting high intensity bunches Benoit for the MD team: T. Bohl, K. Cornelis, H. Damerau, W. Hofle, E. Metral, G. Rumolo, B.
SPS proton beam for AWAKE E. Shaposhnikova 13 th AWAKE PEB Meeting With contributions from T. Argyropoulos, T. Bohl, H. Bartosik, S. Cettour.
Elias Métral, LHC Beam Commissioning Working Group meeting, 30/11/2010 /241 PRELIMINARY FINDINGS FROM INSTABILITY MEASUREMENTS DURING THE 75ns AND 50ns.
Elias Métral /1 POWER SPECTRA COMPARISON BETWEEN DIFFERENT TYPES OF LONGITUDINAL BUNCH PROFILES FOR THE LHC BUNCH AT 3.5 TEV Elias Métral Elias Métral.
1 Update on the impedance of the SPS kickers E. Métral, G. Rumolo, B. Salvant, C. Zannini SPS impedance meeting - Oct. 16 th 2009 Acknowledgments: F. Caspers,
Beam induced RF heating Benoit Salvant, with the invaluable input and help of many colleagues: Collimation team: Oliver Aberle, Ralph Assmann, Roderik.
LHC Scrubbing Run 1 Day 3 (27/06/2015) Scrubbing team 28/06/2015.
Impedance Working Group Update ICE meeting June 12 th 2013.
(Towards a) Luminosity model for LHC and HL-LHC F. Antoniou, M. Hostettler, Y. Papaphilippou, G. Papotti Acknowledgements: Beam-Beam and Luminosity studies.
Juan F. Esteban Müller P. Baudrenghien, T. Mastoridis, E. Shaposhnikova, D. Valuch IPAC’14 – Acknowledgements: T. Bohl, G. Iadarola, G. Rumolo,
A preliminary overview on the 2014 Scrubbing Run II The scrubbing team, i.e. H. Bartosik, G. Iadarola, K. Li, L. Mether, A. Romano, G. Rumolo, B. Salvant,
Beam Instability in High Energy Hadron Accelerators and its Challenge for SPPC Liu Yu Dong.
Heat loads due to impedance: update and required upgrades
Cryo Problem MD Planning Tue (1.11.) C B Day Time MD MP Tue 01:00
Longitudinal impedance of the SPS
Machine Coordinators: G. Arduini, J. Wenninger
Longitudinal beam parameters and stability
Proposals for 2015 impedance-related MD requests for PSB and SPS
MD2490 Measurement of the TMCI threshold at flat-top
MD2490: Measurement of the TMCI Threshold at Flat-Top
LHC at 7 TeV/c: comparison phase 1 / IR3MBC
News on the TMCI and SPS transverse impedance
Impedance working group update
LHC Morning Meeting - G. Arduini
MD#4 Progress MD Coordinators: Giulia Papotti, Frank Zimmermann
Week 46 Week 46: Machine coordinators: Roger Bailey – Gianluigi Arduini Main aims of the week: Stable beams with ions Scheduled stop for ion source refill.
MD#4 Summary MD Coordinators: Giulia Papotti, Frank Zimmermann
G. Arduini, R. Calaga, E. Metral, G. Papotti, G. Rumolo, B. Salvant, R
Status from the collimator impedance MD in the LHC
Scrubbing progress - 09/12/2012
Scrubbing progress - 10/12/2012
LHC Morning Meeting - G. Arduini
LHC SPS PS Impedance working group update 3rd July 2013 HL-LHC:
LHC Morning Meeting - G. Arduini
Sunday/Monday & :30 Stable beams. Fill #1851.
LHC impedance: Comparison between phase 1 and IR3MBC – follow-up
News on TMCI in the SPS: Injecting high intensity bunches
MD#2 News & Plan Tue – Wed (19. – 20.6.)
LHC Morning Meeting - G. Arduini
Scrubbing progress - 08/12/2012
HBP impedance calculations
IP8 aperture measurements (07:30-10:30)
LHC Morning Meeting - G. Arduini
Collective effects in the SPS and LHC (longitudinal plane)
Tuesday 20 September 2011.
Update of the heating of ALFA detector in 2011
eSPS Impedance Considerations Aaron Farricker Acknowledgements: T
Presentation transcript:

Proposal to change bunch length during physics fills to assess beam induced heating after LS1 M. Barnes, P. Baudrenghien, A. Burov, S. Claudet, S. Jakobsen, T. Mastoridis, E. Métral, N. Mounet, F. Roncarolo, B. Salvant, E. Shaposhnikova, L. Tavian Acknowledgements to the LHC OP team and coordinators

Agenda End of fill test on Oct 5 th Proposal to reduce the bunch length in physics Proposal for end of fill study to flatten the bunches

End of fill test on Oct 5 th : With P. Baudrenghien, T. Mastoridis, the TE/CRG team (S. Claudet, A. Gallon, L. Tavian) and the OP team (M. Pojer, L. Normann, R. Alemany and M. Albert), thanks to the LHC coordinators (G. Arduini and M. Lamont) Cavity voltage was lowered to 10 MV and increased to 15 MV Objectives: – assess the impact of bunch length on temperature of LHC equipment (did not expect to see much as the available range of bunch length is small with that method) – record beam spectrum change with voltage

End of fill test on Oct 5 th 2012: ALFA (data from ATLAS logging) Significant impact on ALFA temperature !!!

End of Fill test on Oct 5 th : MKI8C temperatures Change of slope observed after changing the bunch length observed for the tube_up temperature

~-6 % on bunch length (BL) ~+14 % on BIH BIH ~BL -2 (power -2 dependence) End of fill test on Oct 5 th : heat load to arc beamscreens (L. Tavian et al) Clear step observed. Nothing observed for the critical standalone Q6R5.

BSRT B1 and B2 Small change of slope at the moment of bunch length change (23:00 for B1 and 23:30 for B2) Change B2 Change B1

Preliminary conclusion: - Even with small change of bunch length, we see effects on the temperature of several devices (ALFA, MKI, beam screens, BSRT). Not much was seen on collimators. - Next step: understand whether this is predicted with the simulated impedances and the small change of spectrum acquired by the RF team T. Mastoridis, P. Baudrenghien

1 st Proposal

Proposal – Reduce the target bunch length after the ramp during physics fills (in small steps: ~ 50 ps per fill). Why? – Assess the possibility to run with lower bunch length after LS1. What is the limit? – Bunch length was increased in mid-2011 to reduce beam induced heating. What should be monitored? – Temperatures (in particular ALFA and beam screens) – Beam spectra Risks? – Damage to ALFA detector, BSRT and other equipments  need to go in small steps – Not enough cooling power for beam screens  need to go in small steps – Maybe more transverse instabilities as discussed with the ABP/ICE team (we could also increase the bunch length for a few fills to check) – With the new diagnostics, the RF team observed that the beam spectrum is quite different from fill to fill. However the variations should become smaller with smaller bunch length. – Dump due to temperature interlocks (TCTVB, MKI, TCP) – Difficulty to compare two fills with many parameters changing. Need statistics. – Other considerations?

2 nd proposal

Following Elena’s talk at LMC Study the impact of flattened bunches with RF noise: Potential interests: – Can enhance heating of unknown high frequencies while decreasing most known problematic sources of heating  very important to disentangle “broaband/narrow band” “high frequency/low frequency” contributions – Assess impact on transverse stability of these flat bunches (as discussed with the ABP/ICE team) This study would require RF tests at injection (2h) and then end of fill studies. Other considerations?