MWSS Weekly Order 1067 Update Chevron 4/15/2015. Out of Reservoir Tilt Events in MWSS 21S EO1067 area from 4/8/2015 to 4/15/2015 Map as per DOGGR’s letter.

Slides:



Advertisements
Similar presentations
Revised Environmental Site Assessment Guidelines & Asbestos Inspection Guidelines for Bridges.
Advertisements

Related Service Long Term Absence (LTA) Procedures An Administrators Guide.
CASE STUDY ON BOILER ACCIDENT
Patty Helphenstine & Roslyn Thomas, CMS
What is Smart911?.
Developing GIS for Scottish Canals
High Pressure Injection 06/10/ Prelude To Incident A Miner was assisting his partner was the operator of the Mclean Bolter. The Miner was new.
Termination Notification Manual Click on our Termination Notification Link located on the side of the HR.FDU.EDU home page.
Critical Book Review Due Dates March 3 rd -1 pg summary due (what you have read to this date, not the whole book)- 25pts March 10 th –Project proposal.
Proposed Statewide Baseline Groundwater Sampling and Monitoring Rules Staff Presentation Cause 1-R, Docket No RM-04 November 14, 2012.
2012 Shift Change Schedules REVISED for new contract language.
Vermont Yankee VSNAP Presentation February 22, 2011 Mike Romeo Director NSA.
KSIS Mid Year Training, 1/8/14 January 8, :00 a.m. (CST)/9:00 a.m. (EST)
YEAR 10 WORK EXPERIENCE 7 th to 11 th July Phase 1  Students should start looking now for their own work placement.  If you receive a positive.
PeopleSoft Time and Labor Training Instructor: Karin Alvarado
WSDA – WSU Leaf Index Management Tool Photo by Gail Amos WSDA EPA-R7 Workshop March
Property Appraiser and Tax Collector Office Space Search Update Real Estate Management March 25, 2014.
On-Boarding Process Working Deck. Agenda HR On-boarding Process for Employees HR On-boarding Process for Employees Key & ID Process Key & ID Process Service.
Atlantic Technical Management SUNOCO LOGISTICS & ATLANTIC TECHNICAL MANAGEMENT, A PARTNERSHIP FOR MANAGING MARINE RISKS.
Chapter 3 Eclipses and the Motion of the Moon The phases of the Moon were introduced in Section 1, but without discussion of eclipses of the Sun and Moon.
© 2008 General Parts International, Inc. Written permission is required to copy or forward to anyone other than the intended recipient. TeammateTime DC.
New Hanover County 2017 Revaluation Update Roger Kelley Tax Administrator Tax Administration September 14, 2015.
Federal Aviation Administration NOTAM MANAGER OVERVIEW Lockheed Martin Proprietary Information Proprietary information owned by Lockheed Martin, such as.
SunGuide® Software Development Project Release 4.3 Express Lanes Enhancements Design Review December 15, 2009 December 15, 20091R4.3 Design Review.
This presentation is for illustrative and general educational purposes only and is not intended to substitute for the official MSHA Investigation Report.
11 Insert Agency Name Time and Labor Implementation Meeting Insert Date of Meeting.
1 HOW TO WRITE A CORRECTIVE ACTION PLAN (CAP) Presented by Nancy Gates Chief, Financial Policy and Compliance Division April 29, 2008.
April 17, 2007 BCC Called Public Hearing on BZA #VA February 1, 2007 Applicant: Towanda Hannah.
THE CHILD AND ADULT CARE FOOD PROGRAM playing a vital and integral role in improving the overall quality of care and daily nutritional health of participants.
Property Appraiser and Tax Collector Office Space Update August 5, 2014.
MWSS Weekly Order 1067 Update Chevron 4/8/2015. Out of Reservoir Tilt Events in MWSS 21S O-1067 area from 4/1/2015 to 4/8/2015 Well symbol at TD 2013.
Silver Line Phase 1 – Status Report Status Overall Phase 1 Construction – 99% complete All Station at 98% complete except Wiehle – Reston East at 99% complete.
Reports. Report Summary Warehouse Reports Returned Material Serial Numbers Not Found This report list the serial numbers of material returned which were.
1 MDS/ITFS Licensing Public Forum. 2 Public Forum Agenda I. Overview and Background II. Finding MDS/ITFS License, Application and Data Correction data.
CBRFC March Peak Flow Forecast Webinar March 11, 2014 Greg Smith & Brenda Alcorn These slides: Presentation.
ALTERNATE WORK SCHEDULE TIME ENTRY SAMPLES. SCENARIO – RDO (REGULAR DAY OFF) : 1st MONDAY OF PAY PERIOD WEEK 1SATSUNMONTUEWEDTHURFRI WEEK TOTAL DATE 25-Jul26-Jul27-Jul28-Jul29-Jul30-Jul31-JulHOURS.
Red Light Running April 29, Red Light Running Outline Pilot Project System Used Cost Warning Notices Violation Photos Results Keys for a Successful.
MWSS Diatomite 21S Weekly Update Chevron Reporting Period: 6/1/2015 – 6/7/2015.
MWSS Diatomite 21S Weekly Update Chevron Reporting Period: 6/29/2015 – 7/5/2015.
US Army Corps of Engineers BUILDING STRONG ® Mark Twain Lake Water Control Manual Update Joan Stemler St. Louis District Water Control.
1 System for Administration, Training, and Educational Resources for NASA External Training Requests.
Predicting Near Space Flights L. Paul Verhage 13 July 2013.
KSIS End-of-Year Training, April 29-30, 2014 Windy L. Newton, Systems Consultant IT Office of Next Generation Schools and Districts Division of Student.
Not all changes will be discussed please view all regulations at
Safe Schools Infinite Campus Interchange Windy L. Newton Office of Next Generation Schools & Districts, Division of Student Success.
Day in the Life (DITL) Production Operations with Energy Builder Copyright © 2015 EDataViz LLC.
Transition Plan Network Operations Model Change Requests 5/26/2010.
Conservation Development and Planning Department Code Compliance Flow Chart for County Code (Zoning & Land Use) Violations COMPLAINT RESEARCH AND PRIORITIZE.
© 2012 Chevron Expatriate Emergency Preparedness.
1 City of Portland Bureau of Development Services Staff Presentation to the Historic Landmarks Commission Type II Appeal of Approval LU HDZ –
CRFS Technical Meeting LC Operations Update November 14, 2012.
PEOPLESOFT UPDATES PeopleSoft Support and Sustainment Center PeopleSoft Support and Sustainment Center.
Conservation Area Impact Permit Gary and Karen Nelson and Dennis Hightower District 4 June 9, 2009 Environmental Protection Division Environmental Protection.
Date of download: 6/22/2016 Copyright © ASME. All rights reserved. From: The Importance of Intrinsic Damage Properties to Bone Fragility: A Finite Element.
NAPA COUNTY Conservation Development and Planning Department Code Compliance Flow Chart Building Code Violations 1 COMPLAINT Written complaint (form, letter,
Graphical Data Engineering
AR SESSION: Using Adjustment Tiers Ruth Sensabaugh
MEIPN Montessori (Early Childhood) Training Physical Sciences
Triggered Earthquakes at Koyna, India
Oil-Based Mud Contamination in Gas-Condensate Samples
{Project or Property Name}
2016 File Maker pro training for Summer program hiring
Payroll Processing pay period end for HR Professionals
Recognize Excellence & Development
Because Technology Never Stops
Confined Space (Permit-required)
Step 1 Click: “Continue to the Online Permit Center”
Field Photos
Actions Updates Action 0282/006 – Exclude from AQ process
Recognize Excellence & Development
Presentation transcript:

MWSS Weekly Order 1067 Update Chevron 4/15/2015

Out of Reservoir Tilt Events in MWSS 21S EO1067 area from 4/8/2015 to 4/15/2015 Map as per DOGGR’s letter Tilt event Activity Summary Offset Operator (TRC): 1 Out of Reservoir Tilt Event in TRC Lease within 800’ of the expression started on April 13 th (event # 04 13A) and currently still ongoing. Pinnacle report shows steam injection into well Kelly 22 (similar to past events on March 4 th and April 1 st ) Chevron: 1 Out of Reservoir Tilt Events in Chevron Lease within 800’ of the expression started on April 8 th (event # 04/08A) and lasted 2 days Chevron is not steaming within 800’ of the expression at this time. Event # 04 13A Event # 04 08A

Event # 04/13A (Out of Reservoir) Uplift and an Out of Reservoir Event observed on April 13 th (on TRC) April 13 th (Field Surface Deformation 12hr map) UPDATE

Out of Reservoir Tilt Events in MWSS 21S EO1067 area Pinnacle’s report on Event # 04 13A

Well 20 Sump Volumes (1/1/2014 – 4/15/2015) 4/8/15– 4/15/15 Date 15 day Avg. Volume pulled (bbls) Daily Volume pulled (bbls) 4/8/ /9/ /10/ /11/ /12/ /13/ /14/ /15/ Start/End of Phase 3 test Start of Chevron Test outside EO1016 (validation of April 13 Well 20 Flow Event) End of Chevron Test outside EO1016 (validation of April 13 Well 20 Flow Event) Estimated start of TRC steaming in DOGGR Limited Injection Zone Phase 3 Testing rescinded, 200' limited injection zone set and request for a geotechnical study Uplift observed on March 2nd on NE side of the lease line and a subsequent Out of Reservoir Event on March 4th (TRC), similar situation occurred on April 1 st (TRC) and April 13 th (TRC) Out of Reservoir Event on April 8 th (CVX) after TRC’s event (on April 1 st )

Well 20 Sump ( 4/15/2015) Visual Observations: No new seep locations. Low energy seep re-started near our Can 5 on April 10 th and is still flowing UPDATE

Chevron MWSS 21S Property Line and Well 20 Sump “21S Restricted Entry Area” Do not enter red outlined area without approved safety plan N Outline of restricted area 22S TRC 21S CVX Photo 2 March 2015 Red outlined area should not be entered without approval of the Chevron 21S Diatomite OS. Site specific safe work plans must be developed and approved prior to entry. Well 20 Sump Expression Area 21S Property Line (dashed line) & Unstable Bank Area Due to the instability of the embankment between CVX and TRC properties, Chevron has extended the Do Not Enter Area (“21S Restricted Area”) to include the area from the embankment to the flow lines that run west of Chevron wells H225 and 204R. The K-rails no longer define the Do Not Enter Area and will be removed. This area is outlined in red on the aerial photo. Chevron requests that no one enters the red outlined area without contacting the Chevron Operations Supervisor and developing a written safe work plan prior to entry. The Chevron Supervisor can be contacted at Chevron will work with the DOGGR to safely obtain photos or other data in this area if access to this area is required.