CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Baseline for wind energy project in Tunisia Second National Workshop March 31 & April 1, 2004
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Electric sector data National operator: STEG Regulatory framework: STEG has the monopole on energy transport and distribution. Independent power production is allowed Electrification rate: 95% Demand increase: 6,5% per year Electric consumption: about GWh on 2002 Installed capacity: about 2800 MW Peak capacity: 1835 MW
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Power Production Park Evolution
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Electric sector data
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 The Wind Energy project of Sidi Daoud Location: North East Starting operation date: August 2000 Capacity: 10,56 MW Cost: 12,4 MDT Funding: STEG (20%), Long term spanish credit (80%) Extension on 2003 : 8,72 MW, 10,5 MDT Institutional frame: direct operation by STEG
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Wind Energy Potential (capacity)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Wind Energy potential (penetration rate)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Barriers to Wind Energy development in Tunisia high capital technology Wind kWh not competitive with conventional power generation Wind energy does not avoid capacity It substitutes “only” fuel needed to produce marginal kWh No suitable regulatory and institutional framework No mechanism to support the incremental cost between wind kWh and conventional kWh No specific incentives to the wind sector
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Wind Energy CDM Project of Sidi Abderrahmen Location: North East of Tunisia, Sidi Abderrahmen Mountain Wind quality: 8 to 9 m/s in 30 m Performance: 3200 hours/year Capacity: 100 MW Investment: about 100 MUSD, private sector Institutional framework: Independent production
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Methods used for baseline calculation Method 1: Actual average efficiency of the power production park on 2002 Method 2: Historical average efficiency of the power production park Method 3: Calculation based on the generators installed within the 5 last years and who is among the 20% most efficiency generators in operation in the park Method 4: Calculation based on marginal generators average
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Power generators selection for baseline calculation (method 1 & 2)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Power generators selection for baseline calculation (method 3)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Power generators selection for baseline calculation (method 3)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Power generators selection for baseline calculation (method 4)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Power generators selection for baseline calculation (method 4)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Power generators selection for baseline calculation (method 4)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Power generators selection for baseline calculation (method 4)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Energy saving
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Power generators selection for baseline calculation (method 4)
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 GHG emissions reduction
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Economic issues
CD for CDM - Second National Workshop on Baselines (Phase II) Cairo, March 31 & April 1, 2004 Power generators selection for baseline calculation (method 4)