Vigyan Ashram (VA) INDUSA Infrastructure updates Annual Update for 2014-2015 Budget Proposal 2015-2016.

Slides:



Advertisements
Similar presentations
New Bresnahan Model Elementary School Project Neighborhood Meeting January 11 th 2012.
Advertisements

Occupancy Classifications and Loads
GE-final House of fun………... ROOF Solar power and wind powered house 4 wind intakes that transport collected wind into a wind turbine to produce electricity.
Or... What happens when Sponge Bob meets Bob the Builder??? 1.
Aum Sri Sai Ram Current status of construction of plant houses in Odisha.
Raymond School District Raymond School Facility Assessment Executive Summary September 16, 2013 Eppstein Uhen Architects Eric Dufek, Senior Design Architect.
Gregorian Community Trust Proposal to Construct a School for Children with Intellectual Disability at Roha Dec 2014 Supported by Suryoday School for the.
Public Works Institute April 8, 2014 Bob Hartnett Deputy Director of Public Works Steve Aldridge City Architect.
School District Merger Study Crown Point Central School and Ticonderoga Central School Facilities April 17, 2013 Castallo and Silky Education Consultants.
LANGDON LIBRARY ~ FROM 1892 TO THE 21 ST CENTURY.
2008 Goal New Goloka Dhama Dimmocks Mill Road, Hillsborough, NC, To build a nice temple facilities for Sri Sri Radha Golokananda Ji in Hillsborough,
ENERGY AUDITS & ELECTRICITY BILLS Energy & Environment.
KINGWOOD UDGET PRESENTATION TOWNSHIP OF KINGWOOD 2012 BUDGET PRESENTATION.
Senior Architect (WZ)I C.P.W.D.Mumbai MULTIPURPOSE HALL FOR SPORTS AUTHORITY OF INDIA GANDHINAGAR.
Church Renovation/ Expansion Proposals Willowdale.
Auburn University Facilities Prioritization Process Each college will submit up to five projects annually – Ten this first year Projects must cost $50,
Lotterywest Grants Workshop (opportunities & demystifying the process)
Fundamentals of Construction GTT – Unit 7 – Green Architecture
Mathru Project Proposal
Facility Management: “It’s your home away from home, So take good care of it!”
Restoring Hope with Helping Hands Community Project Proposal.
Renovation 2014 Preserving the Past | Preparing for the Future The renovation we are planning seeks to preserve the past by maintaining the character and.
Design Features Structure Concrete slab floor (27’x25’x3”, 6.25 cu yards) Walls created with mud bricks (dry season) or concrete blocks (wet season) Aluminum.
S.M.A.R.T. Project Proposal December 9, 2014 Referendum.
2014 Budget Department Presentations Infrastructure Funding Options.
Overview of HMS Facility Planning Educational Specifications Committee November 16, 2005 Educational Specifications Committee November 16, 2005.
SunTrust Tenant Improvements June 30, Background Current Situation Proposed Work Cost of Proposed Work Questions Presentation Outline.
Feb 27, 2007 Informational Meeting 1 St Paul United Methodist Church Faith Works! “Building for Christ’s Ministry” Informational Meeting February 27, 2007.
2013 Bond Task Force Proposal Presentation & Proposal by Cory Baker Director Scottsdale Center for the Performing Arts 3 Vice President Scottsdale Cultural.
ARC 810: Building Climatology Department of Architecture, Federal University of Technology, Akure, Nigeria ARC 810: Building Climatology Department of.
Design Stage 1 Preconstruction Stage 2: Procurement Conceptual Planning Stage3: Construction Stage 4: Project Close-out Square Foot Estimating.
MV STRATEGIC PLANNING PLANNING FOR PHASE III Should we have 3 architects submit proposals?
FEC Full Economic Costing of Research (and Teaching and Administrative) Facilities.
1. 1 3/14/11 Church Conference 14-Mar-11 Welcome and Introduction Opening Prayer Presentation of Building Project Motion to Approve Project Vote on Proceeding.
Sl. No. Item of ExpenditureEstimated Cost (Rs.) 1Cost for educational aids for 2 Rs.5,000/- per school 10,000 2Cost for School Uniform- 70 uniforms.
Chard RFC Social Spaces – Refurbishment 2014 Phase 1 – Family Bar and New Entrance to the club 1.
1 NEW FAIRFIELD FREE PUBLIC LIBRARY Renovation Project
©2009 Strang, Inc. Orchard Ridge United Church of Christ September 20, 2009.
High Performance Schools Benefits of a High Performance School Higher Test Scores. A growing number of studies are confirming the relationship between.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY September 2015.
Asha for Education November 2005 Akkarapettai School Construction Project Proposal Asha AZ Project Champion – Mukund Asha Chennai Contacts – Lakshmi and.
BRVFD & RS Training Facility Proposal 05/07/2009.
Shristi Updates – September ‘08 New Building Update Other Updates Teacher Salaries.
Renovating Geoscience Labs for the Future “We want our students to learn skills they need in the workplace…not a museum.” Key Design Drivers Capacity—
DEDHAM PUBLIC SCHOOLS FY 2008 Approved FY 2009 Approved FY 2010 Approved Education Technology Program 275, Roof Replacement - High School750,
Effective Use of Laboratory Equipment and Facilities in Pure & Applied Chemistry.
Asha for Education March Monthly Meeting Akkarapettai Project Update Asha AZ Project Champions – Mukund Asha Chennai Project Champions – Lakshmi.
THE FINANCIALS The loan for TPF campus. Update THE FINANCIALS For the building project.
TOWN OF NORTH EAST NEW TOWN HALL AND HIGHWAY FACILITY October 2015.
INTERIOR DESIGN STAR EVENT. MEET YOUR CLIENTS The home is laid out similarly to this ranch home. THE SPACE.
New Listing - Walnut Farms Perfect for entertaining! This spacious custom built home with 4 bedrooms and 3 full baths on over a half acre wooded and landscaped.
Implemented & Managed by: RE-STORING ‘WATER’, RESTORING LIFE TAKING FORWARD RESPECTIVE VILLAGE COMMUNITIES &
Unique assets … of Glentrool: 1.Surrounded by forest 2.Local tourist attractions 3.Amazing local scenery and outdoor activities 4.Only village in the.
Building Team Formation: Background Information St. Andrew Presbyterian Church March 27,
DAVIS SR. HIGH SCHOOL ALL-STUDENT CENTER (MULTIPURPOSE BUILDING) PROGRAMMING OPTIONS August 6, 2015.
Performing Arts Center Use of Unrestricted Endowment Funds & FY Budget Amendment Request March 11, 2014.
DR. Nabil Dmaidi F ACTORS THAT D ETERMINE V ARIATION IN E STIMATES.
BICS PAC Treasurer Report June 19, 2017
Chapter 2 Building Occupancy
TOT SPOT proposal.
Occupancy Classifications and Loads
BURROUGHS HIGH SCHOOL PROJECT STATUS REPORT March 2017 Fast Facts
Occupancy Classifications and Loads
ISLEHAM IMPROVING OUR COMMUNITY FACILITIES
Architectural Drawing
2007 Bond Issue Capital Improvement Program
Concept Features Bus entry, exit and drive are separate from visitor and parent entry and drive Additional area behind building for bus traffic and turn-around;
2011 Exhibition of School Planning and Architecture
Presentation transcript:

Vigyan Ashram (VA) INDUSA Infrastructure updates Annual Update for Budget Proposal

PRESENT BUILDING BEFORE THE PROJECT

INDUSA Fund Utilization ApprovedRs. 12,10,000 Individual donations for the projectRs. 19,30,355 Completed kitchen construction expensesRs. 20,48,502 Remaining kitchen workRs. 8,93, USD 11,000 for computer practical training institute USD 10,000 for OER generation USD 20,000 for kitchen construction INDUSA Fund History

INDUSA Fund Utilization Sr NoHeadFund/ DonationExpencesBalances 1Asha/ Indusa Loksatta Donation Kitchen Construction Sub-head wise details * 1 Kitchen meason labour charges ( Suresh Jadhav/Narsing ) Kitchen Furniture Kitchen Construction Material Cost Kitchen Light Fitting Cost Kitchen construction Travelling cost Kitchen Capital Material

INDUSA Remaining work Sr NoMaterial / Work natureQuantity (Unit Construction)Cost / UnitTotal Cost 1Construction of straircase193 Sq Ft250 Rs/ Sq Ft Fabrication work at First Floor800 Sf T450 Rs/ Sq Ft Side wall of hall3 Brass (300 Sq Ft)500 Rs Sq Ft Floor tiles8 Brass5000 Rs/ Brass Windows and door ElectrificationAprox ColoringAprox fall-ceiling200 Rs/ Sq Ft Other Misc Cost Rs/ Unit area1117

INDUSA Proposal Construction new classroom and open hall at Vigyan Ashram; 2000 sq. ft. in a two story building with ground and first floors (each 1000 sq. ft.). Existing room which VA uses as a classroom was old Poultry shed having an area of 630sq. feet. VA uses this room as a multipurpose room like classroom, hall for cultural events, etc. The existing structure is now beyond the repair and at depleting stage so needs reconstruction. As it was old poultry; the height of structure is much low and ventilation is not proper. In summer season when temperature rises up, we are unable (uncomfortable) to use the room. Due to low structural height, windows are inefficient to provide sunlight and fresh air. We are unable to fix our LCD projector permanently due to unavailability of proper space. We don’t have proper door and storage at current room, therefore always need to carry LCD projector from office when it requires. The room is not designed as classroom hence backbenchers could not see the presenter and presentation.

INDUSA Proposal We are unable to fix our LCD projector permanently due to unavailability of proper space. We don’t have proper door and storage at current room, therefore always need to carry LCD projector from office when it requires. The room is not designed as classroom hence backbenchers could not see the presenter and presentation. We celebrate different festivals and on these occasions students use different musical instruments like Dhol, drum, zanj, lezim, tabla, mrudang, and harmonium - pump organ, and many more. All these instruments are stored on the backside of the classroom. We do not have proper storage room for those. VA believes in ‘Learning while doing’ philosophy and organizes different training programs and workshops. So we need a hall to organize the program/workshops. Currently we need to move the benches from the classroom to get it converted into the hall. In order to overcome the problem we are proposing ground floor + 1 building. In the reconstructed building classroom will be at the ground floor and on first floor will be a hall plus some storage space for musical instruments (total 2000 sq ft.) At present, we also use the existing 630 sq. ft. classroom as a dormitory for people by removing benches outside.

INDUSA Proposal Existing classroom

INDUSA Proposal The costing is based on our experience of construction of kitchen. We will get the actual drawing from architect and then will make final costing. Like our entire previous project, we wish to involve our students in execution of project. Construction work will begin: 6 – 8 months from receipt of the funds. We estimate that approx. 60 students will benefit 2 hrs daily basis of the facility. It will be useful for number of workshops, cultural programs and common assembly of VA throughout the year. Approx. 200 students for 7 days in a year will use it as a dormitory facility.

INDUSA Budget SpecificationsExisting StructureProposed Structure HeightLowAppropriate Area630 sq. ft.1000 sq. ft sq. ft.+1000* sq. ft. (* provision is made for future) MaterialFerro- cement fabricated roofR.C.C. double floor (ground+2) VentilationImproper (for poultry)Proper Solar SystemNoYes Rain water harvestingNoYes – underground tank SunlightImproper- dimProper and clear Classroom and hall630 sq. ft. classroom cum hallClassroom : 1000 sq. ft. at ground flour Hall: 1000 sq. ft. at first flour Second floor: Second Floor: Provision is made in the designing of construction but will not be constructed immediately. Hence funds are not asked for the second floor in this proposal. DormitoryNeed to relocate the furniture like benches tables and then we place beds As hall is going to be a dormitory no need to relocate the furniture LCD projectorNeed to carryFixed Audio visual system and musical instruments Don’t have proper storage roomWill have proper storage room Seating ArrangementAt single platformProperly as classroom WashroomCombinedseparate for ladies and gents at each floor

INDUSA Budget Sr. No. ItemPer unit * QuantityTotal Cost 1Construction cost for new Classroom constructionRs.1100 per sq. ft * 2000 sq. ft.22,00,000 2Furniture, light fitting, cupboards, sound and LCD 3,00,000 3Design / Architect consultancy 50,000 4Travel / admin / miscellaneous6%1,53,000 TOTAL 27,03,000

INDUSA Funds – Intended Utilization KKB family trust grant of USD (INR 16,75,000.) INDUSA-VA Library Fund - INR 50,000 Hybrid Fitness Therapy book publishing costs - INR 1,00,000 Construction of Classroom and Assembly Hall building – INR 15,25,000 Remaining amount is to be raised from other sources.

Hybrid Fitness Training book A book titled, "A Guide to Positive Health with Hybrid Fitness Training by Kishan Bhatia" based on a draft submitted to VA for copy editing as well as adding original graphics. Book rights will rest with VA and all revenues generated from the sale of this book be used for student activities. Book should interest mixed audience (Americans, Europeans and Indians).