NRG Contribution to LEADER WP1.1 Status LEADER Petten, Netherlands Ferry Roelofs

Slides:



Advertisements
Similar presentations
MAINTENANCE PLANNING AND SCHEDULING
Advertisements

Guidebook for Risk Analysis Tools and Management Practices to Control Transportation Project Costs Keith R. Molenaar, PhD Stuart D. Anderson, PhD, PE Transportation.
ASME SMR ROADMAP (STP-NU-072)
WP 6, Milan, 10 February,2011 Laura Currie, Fiona Godfrey.
Risk Based Estimating Self Modeling Ovidiu Cretu, Ph.D., P.E. Terry Berends, P.E. David Smelser.
1. Henry Laurence Gantt, A.B., M.E. ( November 1919) was a mechanical engineer and management consultant who is most famous for developing the.
Subprogramme 5: Synthesis, Irradiation, and Qualification of Advanced Fuels Joe Somers JRC - Institute for Transuranium Elements (ITU) SP5 coordinator.
10.5 Report Performance The process of collecting and distributing performance information, including status reports, progress measurements and forecasts.
OPTIRAIL WORKSHOP · OCTOBER 23, 2014 · BRUSSELS Overview of WP2: “Analysis of the transferability of tools”
1. RCC Action Plan Item: Financial Protection for Produce Sellers Webinar presentation December 2013 Agriculture and Agri-Food Canada (AAFC)
The BIM Project Execution Planning Procedure
2 nd Steering Committee Meeting October 2008, Athens and Aegina.
1 Progress report: DISCONTOOLS Project Morgane Delavergne DISCONTOOLS Project Manager, September 22nd, 2009 Mirror Group Meeting Châtelain Hotel, Brussels.
BSBPMG503A Manage Project Time Manage Project Time Unit Guide Diploma of Project Management Qualification Code BSB51507 Unit Code BSBPMG503A.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Introduction- Project Management By Ctrl+C & Ctrl+V 1.
D29 - Roadmap for LFR development Davide Mattioli ENEA UTFISSM-PRONOC LEADER (Lead-cooled European Advanced DEmonstration Reactor) WP 1 - Task 1.1 Amsterdam.
Project Management Practices Vesa Tenhunen University of Eastern Finland LUMA Centre
Work Package 2 Giacomo Grasso ENEA UTFISSM-PRONOC LEADER Work Package 2 meeting Madrid, May 8, 2012 Current status and organization of the work.
Top Down Cost Estimate ELFR LEADER WP1.4 Status Petten, Netherlands Ferry Roelofs
LEADER WP3 Conceptual Design Status KIT Town Office Ostendorfhaus Weberstraße 5, Karlsruhe, Luigi Mansani
Geog 469 GIS Workshop Project Management.
BSBPMG402A Apply Time Management Techniques Apply Time Management Techniques Unit Guide C ertificate IV in Project Management Qualification Code.
Calculating Project Schedule Risk Using Monte Carlo Simulation Curt Blair, PMP.
LEADER, GIF,EURATOM and other News 6 th PCC and 3 rd GB meeting of the LEADER project Karlsruhe November, 23 rd 2012 Alessandro Alemberti
BSBPMG505A Manage Project Quality 8.1 Plan Quality Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of identifying.
PLUG IT IN 6 Project Management. 1.Project Management for Information Systems Projects 2.The Project Management Process 3.The Project Management Body.
Lecture # 17 PRM 702 Project Risk Management Ghazala Amin
Risk Management Handbook by H Global Managing Project - Group H Samuel SuarezMark McCann Ankit TanejaNazmul Alam LaurenceHsuTony Huang Farid MojahediEddie.
KIT – University of the State of Baden-Wuerttemberg and National Research Center of the Helmholtz Association Institute for Neutron Physics and Reactor.
Office Management Tool - II Institute of Management Sciences Muhammad Shahzad Ali Lec 7: Introduction to MS - PROJECT L E C T U R E 7 INTRODUCTION TO MS.
Consolidation and Upgrade of the SPS Electrical Networks Current Status JP. Sferruzza, on behalf of EN/EL.
BSBPMG504A Manage Project Costs 7.1 Estimate Costs Adapted from PMBOK 4 th Edition InitiationPlanning ExecutionClose Monitor Control The process of developing.
Plenary Meeting Crete, 3-4 September, RURAL WINGS IP RURAL WINGS WP8 Status.
WP1: Reference design objectives and specifications Didier De Bruyn SCKCEN Fourth PCC meeting FP7 LEADER Bologna, 27 October.
1 EMS Fundamentals An Introduction to the EMS Process Roadmap AASHTO EMS Workshop.
LEADER WP3 Conceptual Design Status KIT Campus North, Karlsruhe, Luigi Mansani
IAEA International Atomic Energy Agency Methodology and Responsibilities for Periodic Safety Review for Research Reactors William Kennedy Research Reactor.
(Project) RISK MANAGEMENT PROCESS SEPTEMBER 5, 2008.
Nuclear Research and consultancy Group European Radiation Survey Site Execution Manual Leo van Velzen ENVIRONET Kick-off meeting Vienna 23 – 26 November.
ΜCHP WP4 Progress Update Expert groups formed at First meeting of expert groups (Month 6) Blue highlight: Attending first annual meeting.
National Quality Assurance and Accreditation Committee & Quality Assurance and Accreditation Project Action Planning Workshop January 2007.
1 IRES, version 0: an overview Vladimir Markhonko United Nations Statistics Division The Oslo Group on Energy Statistics Fifth meeting, Cork, Ireland,
Project Organization Chart Roles & Responsibilities Matrix Add Project Name.
Task 2.1: Review of ELSY and Conceptual design & neutronic characterization of the ELFR Industrial Plant Kamil Tuček on behalf of Task 2.1 contributors.
LEADER achievements and next steps 4 th GB MEETING of the LEADER project Genova May 10 th 2013 Alessandro Alemberti
September 2005 DEA: First National Workshop 1 Development and Energy in Africa First National Workshop: Tanzania 12 September 2005 Introduction Gordon.
UNECE TIMBER COMMITTEE Fifty-ninth session 2-5 October 2001 STRATEGIC REVIEW OF INTEGRATED PROGRAMME Kit Prins Chief, Timber Section.
Company LOGO. Company LOGO PE, PMP, PgMP, PME, MCT, PRINCE2 Practitioner.
Roadmap for CTA Quality working groups Teo Bernardino (UCM_ELEC/GMV) May 18 th, 2011.
How to use C OBI T implementation resources Brian Selby Director of C OBI T Initiatives ISACA.
IS&T Project Reviews September 9, Project Review Overview Facilitative approach that actively engages a number of key project staff and senior IS&T.
1. WORKFORCE PLANNING ( HUMAN RESOURECE PLANNING) By Dr. Arbab Akanda.
CRITICAL INFRASTRUCTURE RISK ASSESSMENT SUPPORT CIRAS PROJECT OVERVIEW 2nd Stakeholders’ Workshop Aschaffenburg, November, 26th, 2015 Jaime Martín, Project.
3.1 Project Management – time and resources, staying on track
Building an ENI CBC project
MODULE 16 – EFFECTIVE STAFF MANAGEMENT
Maintenance Scheduling
Development and Energy in Africa
Project Implementation Plan
MAINTENANCE PLANNING AND SCHEDULING
DG Environment, Unit D.2 Marine Environment and Water Industry
Industry Buy and Maintain Quiet initiative update
Multi-Criteria Assessment Tool for Floating Offshore Wind Power Plants
NOISE RISK ASSESSMENT Kagisho Motseme
IS&T Project Reviews September 9, 2004.
PPT3: Project planning and management
Start-Up Meeting <Project No. / Project Name>
Current state & Prospects of implementation
Time Scheduling and Project management
Presentation transcript:

NRG Contribution to LEADER WP1.1 Status LEADER Petten, Netherlands Ferry Roelofs

2 Petten 2 November 2011 Contents Introduction Roadmaps v3 –Guinevere –MYRRHA –ALFRED –PROLFR –ELFR –LEADER Overview –LFR Deployment Conclusions

3 Petten 2 November 2011 Introduction Roadmap visualisation Purpose –Provide overview of timing of main developments –In addition Identification of critical path Identification of costly developments Identification of developments with high risk Approach –Roadmapper Workbench Excel based tool from Albright Strategy Group –Limited level of detail to enable keeping an overview Outcome –Roadmap visuals which can be used in presentations to (potential) stakeholders and which are easy to update during and after the project

4 Petten 2 November 2011 Introduction Roadmaps under Consideration It was agreed with WP1 and WP1.1 coordinators to include roadmaps for: –LFR Zero PowerGUINEVERE (LFR/ADS) –LFR ETPPMYRRHA (LFR/ADS) –LFR E&TELECTRA (LFR) –LFR ETDRALFRED (LFR) –LFR PrototypePROLFR (LFR) –LFR FOAKELFR (LFR)

5 Petten 2 November 2011 Introduction Roadmap Construction Three levels –Level 1 Main roadmap elements (e.g. reactor, fuels, materials) –Level 2 Secondary roadmap elements / subdivisions of main roadmap elements, e.g. fuel qualification, fuel fabrication –Level 3 Individual developments / subdivisions of secondary roadmap elements, e.g. fuel irradiation, fuel safety tests

6 Petten 2 November 2011 Introduction Input Data Input data –Begin time –End time / duration –Cost estimate (range) –Risk (low / medium / high) Initial guess provided by NRG based on information from SNE-TP, ESNII, EUROTRANS, MYRRHA, EISOFAR Fuel Roadmap, ELSY and LEADER projects Data review by LEADER experts to be identified this meeting Continuous update during the LEADER project

7 Petten 2 November 2011 Introduction Items for Discussion Confirmation/identification of main and secondary roadmap elements Confirmation/identification of individual developments Input data content review

8 Petten 2 November 2011 Roadmaps GUINEVERE

9 Petten 2 November 2011 Roadmap MYRRHA

10 Petten 2 November 2011 Roadmap ALFRED

11 Petten 2 November 2011 Roadmap PROLFR

12 Petten 2 November 2011 Roadmap ELFR

13 Petten 2 November 2011 Roadmap LFR Deployment Adapted according to D29 rev1.1 october 2011 Including a schedule for ELECTRA

14 Petten 2 November 2011 The End “Thanks for your attention”