The Store Cole and Ferg. 120v Three-Light Track Lighting Kit 2 sets $95.85 (no shipping and handling )per unit L: 48 1/2” W: 4 5/8” H: 9 3/8”

Slides:



Advertisements
Similar presentations
______s Room Budget Created by:. My New Room I plan on purchasing _____ items for $ ____________.
Advertisements

Drawing In One-Point Perspective
Room on a budget What do you need Flooring Flooring- you may choose from hardwood, carpet, vinyl or laminate flooring. You will not find these.
Equipment Set Up 4-H Food Stand 2014 BC WI 4-H Food Stand -Equipment Set up1.
Cooling Business Group 1 Integrated Refrigerator.
DISTINCTIVE DIFFERENCES Rousseau vs. ____________.
Excel Environ Racks Simon Robinson. Ranges Sizes Features Environ v. formal surround; enclose.
Mrs. Palmer’s Class Perimeter and Area Problems. The Empty Room Josh and Austin were at school. They wanted to know how much sq. ft. of carpet they needed.
Waveline Displays.  Manufactured in China  Printing in China  Limited Lifetime Warranty on Frame  Strong Frame Design  Full Color Printing  Complete.
Computer Integrated Manufacturing CIM
Store Design & Visual Merchandising
Conduction, Convection, & Radiation Part II CRCT Prep.
Have A Heart How can I help?. Yard Sale – Without the mess! Heritage students are sponsoring an on-line yard sale. We want to help raise $70,000 for Debbie.
Computer Cases. Computer cases and Specification  Length  Width  Height  Weight  Color  Brand  Available peripherals slots  Additional device.
IEEM 110: Computing in Industrial Automation. Selected Events in the History of Automation Organized automation, mechanization: Industrial revolution,
The machine is built to comply with the accident prevention, hygiene and electric standards in force. MODUL SERIES MODULAR DECK OVENS Control panel features:
Fixture Standards. Layouts Fixtures WorkingStation FixtureAccessories Greeter’sArea EquipmentContents.
Name__________________ MCC3.MD.5,6 Assessment 1. John built a rectangle using square meter units. He made four rows with six square meter units in each.
Technical and Installation 1. What will my slot depth/size for the bottom track need to be? The slot depth for standard flush tracks and full drainage.
Chapter 3 Storage Systems
Elevator Installation, Window Replacement, HVAC, Sprinklers, Block wall skimcoating (resident rooms & 1 st through 4 th floor resident corridors). New.
Style | Strength |Value Todd McCann
Horizontal Carousel System “Good” carousel stock is typically a subset of the SKUs that have medium velocity They are called for often enough to make automatic.
Purchasing Lesson 2. Objectives Explain how purchasing impacts sales and profits List qulities of a good buyer Describe the lifecycle of inventory through.
Hunter McWhorter Mark Menard Steven Hammock. Inspectors never fail to check the required emergency-egress window from a sleeping room. At least one window.
HVACR416 - Design Heat Loss / Heat Gain Part 1. Why? The primary function of Air Conditioning is to maintain conditions that are… o Conductive to human.
1 Slides used in class may be different from slides in student pack Technical Note 6 Facility Layout  Facility Layout and Basic Formats  Process Layout.
Weight Room Renovation. Concessions Gets a Facelift All three concessions stands were painted last year. Several microwaves were replaced as well as the.
By: Tyler Downing and Matthew Wall. OUR PLAN Our plan is to get the entire area of the kitchen (B*H), get the area of all of the cabinets together, and.
Visual Merchandising Rhiannon Gagin 1/30/12 3A.
KITCHEN LAB DUTIES. YOUR RESPONSIBILITIES Our kitchen works as a team, between your own classmates and the four other classes that use it every day. You.
Grade 3 Mental Math Measurement Estimation – Length.
UNDERSTANDING HEAT TRANSFER: CONDUCTION, CONVECTION AND RADIATION.
Section 7 Retail Establishments Section 17 Restaurants Section 35 Tables and Seating ID 234 Building Codes Accessibility.
Types of retail locations Important factor in success of business Shopping center Group of retail stores operated as one business by one business owner,
Hypothesis Writing Q: How does the temperature of a rubber ball affect its bounce height? H: The (higher / lower) the temperature of a rubber ball, the.
Buysell4u.co.uk Looking for used or new office furniture supplier in London. Buysell4u offers you all office chairs, desks, filing cabinets, workstations,
Measuring Lab I. Problem: What is the measure of various objects?
HGC Cassettes Jim Freeman September 17, Director's Review -- Calorimetry – HGC Cassettes Jim Freeman, 2015 Sept 17.
REQUEST FOR GRANT TO Kenai Mountains-Turnagain Arm Board of Directors.
We are Specialized in manufacturing Cinema Concession Equipment's & all types of Refrigerating equipment's Like Cold Display, Hot Display, Popcorn Warmer.
Lesson 2.3 Simplifying Variable Expressions Essential Question: How do you simplify variable expressions?
Name ____________Class_____ Date______ Area of Rectangles The ________ _ of a figure is the amount of surface it covers. It is measured in ________ __.
By: Edith Chen & Brenna Prince
Maria’s Restaurant Appendix A Section 16 HVAC Building Loads
PROMO PRICES ARE VALID UNTIL END OF NOVEMBER
Warm-up In Chinese herbal tea shops, bowls of herbal tea are usually covered by glass plates. Why do the shop owners need to do this?
Nisreen Al Mugheiry Abrar Al Ghailani Shuruq Al Zawawi
The NxtWall Advantage.
SBU Digital Infrastructures NEW LINKEO – Freestanding cabinets
Find Area Mrs. Planavsky 4th Grade.
EYEWEAR INC SAVANNAH PHILLIPS.
Retail Store Opening This Presentation Will Outline The Tasks an Associate Performs when Opening the Store. Click on slide or hit arrow to advance.
Space is: The area the designer has to work with.
Air-Row Fans Minimize Freezer Door Sweating
Extension SR1 WP3 Electrical installations
Business, Building and Liquor License for sale Offered at $1,795,000
Please note: The HLC clocks are built to order and may take 2-6 weeks to go out. eBay’s wording of “available” does NOT mean it is in stock, all of the.
ProLine & ProLine+.
Scotsman Ice Systems Essential Ice New Ice Maker Series
Heller Horizontal Machining Centres
Summer 2017 Projects DV Campus.
The following model requirements are based on a basic slab door finish kitchen similar to the one shown in the image.
Hot to Cold Song.
Types of Commercial Refrigerators You Would Come Across There could be a number of reasons with a person behind him investing in commercial freezer rooms.
Volume.
Building standards Mr. Da Silva.
Hot to Cold Song.
**Plate Tectonics: How did it happen?**
BA6. BA6 Sprinkler Station Structure Sprinkler Station Structure The metal sheet has been added for being able to install the.
Presentation transcript:

The Store Cole and Ferg

120v Three-Light Track Lighting Kit 2 sets $95.85 (no shipping and handling )per unit L: 48 1/2” W: 4 5/8” H: 9 3/8”

Neon custom made sign 37” wide 20” tall $ no shipping or handling

8mm Strong Rubber Puzzle Tiles $2.39-$2.44 per sq foot $9.56-$9.76 per tile 5 year warranty Total: $

Price: $1, Width: 69 3/4" Depth: 25 1/2" Height: 35 1/2" Price: $1, Width: 69 3/4" Depth: 25 1/2" Height: 35 1/2"

Price:$3, Width: 78-1/4" Depth: 29-1/2" Height: 79-1/4“

Morey’s station would be moved into Mrs. Leasher’s office so we can replace morey’s station with a pizza warmer

Keeps your pizzas warm $ Omcan FMA (DH18) Humidified Rotating 4-Shelf Glass 18" Pizza Warmer

OFFICE SERVICE COUNTER FREEZER NEW COOLING UNITS LIGHTING Pizza Warmer Showcase Sign

We are adding lights to show the apparel We are also adding a neon sign Rubber puzzle tile flooring A pizza warmer machine to replace Morey’s work station Morey’s work station will be put into the office The computers in the office will be put into the back room with the other computers Also 2 showcases will be built and installed in front of the store Three door cooler will be purchased to replace our old cooler, and the new cooler will be able to be loaded from the back making rotating items easier Horizontal coffin cooler will be purchased to replace the Doozie cooler