Watewatch Victoria’s Statewide QA/QC Week 2007 July 23-29 Process, expectations and outcomes.

Slides:



Advertisements
Similar presentations
Key Stage 3 National Strategy
Advertisements

Donor Coordination System in Montenegro Paris 8/2/11.
Performance Management
PQF Induction: Small group delivery or 1-1 session.
Manager Performance Evaluation
Ohio Improvement Process (OIP) August Core Principles of OIP  Use a collaborative, collegial process which initiates and institutes Leadership.
PGCE School Experience 1 Briefing Gill Woods. Important Dates for SE1 PRELIMINARY VISIT DAYS Wednesday 1st October Wednesday 8 th October 8 WEEK BLOCK.
How to write a Report On Assessment Source: AUN Secretariat.
Student Assessment Inventory for School Districts Inventory Planning Training.
Minnesota Healthcare Setting Employee Influenza Vaccination Program Survey Denise Dunn, RN, MPH Adult/Adolescent Immunization Coordinator Minnesota Department.
1 Training Counsellors for the Self-access Centre Pornapit Darasawang School of Liberal Arts King Mongkut’s University of Technology Thonburi
Title IX Information Navigating your way through Title IX.
Youth Protection Wisconsin 4-H Youth Development.
The Education Adjustment Program Profile – Revised.
HR Leadership Forum June 14, New Employee Survey O Created as a result of Strategic Planning discussions O Purpose: feedback re: recruitment and.
Employee Engagement Survey Education Session #3
Accessibility Planning, Training & Advisory Programme Making the connections—making it happen Putting Accessibility Planning withinreach! Derek Palmer.
Performance Management and the cycle of appraisal.
Making the most of your survey results Caroline Powell.
Lecture 23.
Slide 1 of 19 Lessons from the Foundation Learning provision for the new 16 to 19 Study Programmes Discussion materials Issue 1: Attendance, retention,
Presenter-Dr. L.Karthiyayini Moderator- Dr. Abhishek Raut
JCAHO UPDATE June The Bureau of Primary Health Care is continuing to encourage Community Health Centers to be JCAHO accredited. JCAHO’s new focus.
INTERNATIONAL LABOUR ORGANIZATION Conditions of Work and Employment Programme (TRAVAIL) 2012 Module 15: Capacity development and training on Maternity.
Building Your Business PCG, 8 th November, What are we going to do? A mix of …. Getting you ‘on fire’ for 2013 ! Planning for business success in.
 Name  Work experience  Background in continuous improvement activities  Expectations 1.
Delivery of Instruction for Effective Teaching and Learning Day 1: Knowing and Engaging the Learner Tuesday, July 17, 2012.
Public Expenditure Tracking Surveys(PETS) Zerubabel Ojoo Management systems and Economic Consultants Jan
Sub-Regional Workshop for GEF Focal Points in West and Central Africa Accra, Ghana, 9-11 July 2009 Tracking National Portfolios and Assessing Results.
KEY MANAGEMENT ROLES. POLC  There are four key management roles.  Say in your head 5 times: management roles = POLC.  DO NOT FORGET THIS!  Very easy.
June 2012 National Quality Framework Preparing for the assessment and rating visit Podcast Series: 3.
11 Insert Agency Name Time and Labor Implementation Meeting Insert Date of Meeting.
10/22/2015 5:20:08 PM EEC IT Strategic Plan June Board Meeting June 12, 2007 Quinsigamond Community College Harrington Learning Center 670 West Boylston.
Waterwatch Victoria QA/QC Week What is QA/QC Week? Mystery samples (2 ranges) for pH, EC, turbidity and orthophosphates and macroinvertebrates (6.
P ASTOR AND P ERSONNEL M ANAGEMENT AND E VALUATION Pastor Todd Nelsen Fields of Grace Lutheran Parish.
Future Directions Celia Hunt Head of Strategy, Learning and Funding.
Table 5 and Follow-up Collecting and Reporting Follow-up Data Or What’s Behind Table 5? American Institutes for Research February 2005.
Whole School Planning Lecturer: Pete Sanders Week 11: 19 July 2010 EDU4PIB – Issues in Education.
245D-HCBS Licensing Update ARRM Business & Finance Forum Minnesota Department of Human Services Office of Inspector General Licensing Division November.
Systems Accreditation Berkeley County School District School Facilitator Training October 7, 2014 Dr. Rodney Thompson Superintendent.
Validated Self Evaluation of Alcohol and Drug Partnerships Evidencing Implementation: The Quality Principles – Care Inspectorate/The Scottish Government.
Welcome to Mrs. Lynch’s Journalism Class! Please sign the attendance sheet on the clipboard next to the door. Feel free to pick up a copy of our paper.
QA/QC Week 2006 Review of state wide results Waterwatch Coordinators Meeting September 8, 2006 Melbourne And strategising a plan for 2007.
National Secondary Transition Technical Assistance Center Connecting TA for Part B Indicators 1, 2, 13, & 14: Working Together to Support States OSEP Project.
Monitoring and Evaluation in MCH Programs and Projects MCH in Developing Countries Feb 9, 2012.
Ministry of Education Ahmadi Educational Zone
FIELD VISIT PROCESS TPAs develop Monthly Work plan – all sites covered at least once per month. Field Staff (TPAs) – attend field visit with Project Field.
STRATEGIC PLAN Tennessee Department of Education Math Core Coach Prep-Week Opening Session June 3, 2013.
Curriculum Futures Looking after learners, today and tomorrow To develop a modern world-class curriculum that will inspire and challenge all learners and.
SMALL BUSINESS DEVELOPMENT NETWORK NEEDS ASSESSMENT OF COLORADO BUSINESSES Prepared by: Left Brain Concepts, Inc. Lakewood, Colorado August 2012.
Link Tutor Update 17 th March Inspection of Leeds Beckett ITE We anticipate being inspected this year as an ITE provider The Ofsted window opens.
1 QUALITY MANAGEMENT SYSTEM PRESENTATION TO BOTSWANA DRUG ADVISORY BOARD MEMBERS 13 th – 17 th AUGUST 2007.
A Brave New World: Using the New Ofsted Framework on DWP Inspections Karen Adriaanse March 2010.
Strategic Planning Paul McCallion Development of National Coding Standards within the Czech DRG System.
School Based Intervention. Scenario In Mr. Smith’s class, homework is assigned three to four times a week. Students have been instructed to place completed.
Class Observer & Feedback Training Cass Breen & Marco Macchitella.
Minimum Contract Level Partnership Planning Cycles November 2011 Barry Langfield, LSIS Partnership Adviser.
Information Session Teaching Review Program. The Adelaide Peer Review Model Two related programs University of Adelaide2 Peer Assisted Reflection and.
NAPLAN Online: Contentious Issues and Risk Mitigation Strategies
Performance Management
myTimetable Module Timetable Academic Review Session
Proficiency Testing as a quality improvement tool
What Are We Here For?? Athlete Development Coaching Sponsorship and
Unit Award Scheme (UAS)
Employee Engagement Survey Education Session #3
School Cleaning Update
Unit Award Scheme (UAS)
BSBWOR301 Organise personal work priorities and development
Engagement Planning - Communications
Challenging Conversations
Presentation transcript:

Watewatch Victoria’s Statewide QA/QC Week 2007 July Process, expectations and outcomes

QA/QC Week is an opportunity to: Self-assess your and your monitor’s techniques and instrument accuracies against known standards for pH/EC/turbidity/ortho-phosphorus Promote the monitoring strengths of the program to stakeholders Review training and equipment needs in the region Encourage ‘best practice’ monitoring

QA/QC Week is: A logistical challenge just getting the samples to you (last year = 520 litres of mystery solutions, plus 100 sets of macroinvertebrates) An expensive annual event hours of work providing feedback on statewide and regional results

QA/QC Week is NOT: An activity between your monitors and the state office. The samples are free for YOU to support YOUR monitors. A random activity. It’s in your regional DC Plans as one of two QA-checks each year (Std 3 and 4). Compulsory, however you will then need to provide a second QA-check/event for your monitors at your own expense.

Review statewide training needs and educational resources Undertake M&E of the Watewatch program’s monitoring activities Review state performance from year to year. Promote the program’s monitoring improvements and achievements. We use QA/QC Week to:

Who should be involved? ALL Waterwatch Coordinators Waterwatch monitors (Standard 3 and 4) Monitoring/Water Quality Staff at your CMA/Water Authority (a great way for them to see what QCs Waterwatch uses, while checking their own equipment /practices)

Why is this year’s process changing: In 2006 the program wasted (i.e. did not submit results sheets for): 35% of phys-chem samples 35% of macroinvertebrate samples More than $2700 worth of samples

Post-QAQC Week Survey YOU identified the following main reasons for sample wastage: Poor regional planning and implementation Too little time/few resources to engage monitors

Post-QAQC Week Survey Your preferred means of reducing wastage in 2007 were? - Investigate sample stability for a longer QA/QC Week time period - Smaller quantity of samples provided to each region, to be stretched further - Regional orders for individual sample needs - Charge regions for wasted samples

Strategy for 2007: Move QA/QC Week dates back to July, to avoid busy May and allow regional programs time to PLAN Reduced sample volumes (250mL bottles, plus 100mL for phosphate curves) 2 ranges of solutions – Range A = low range (EC < 2000, pH < 7, turbidity <50, ortho-P <0.2mg/L P) Range B = high range (EC >2000, pH >7, turbidity >50, ortho-P >0.2mg/L P)

Strategy for 2007: how you’ll distribute samples to local coordinators and/or individuals in a timely manner Regions to seriously start planning: the number of samples they’ll need for this strategy engagement strategy/ies (mail outs, regional QA/QC events, individual events) how you’ll starting preparing your monitors for the activity.

Strategy for 2007: Batch information will be recorded for all batches 10% samples checked in lab during QA/QC week (all batches checked) Samples to be prepared by a NATA-accredited lab (we will not repeat the pH problems of last year) Statewide and regionally-specific reports will be prepared again, based on results.

Key dates – put them in your diary NOW: Regional Orders for samples (Range A and B, macros and P-curve standards): 12 June 2007 Samples distributed from state to regional head offices: Wed 18 th July 2007 QA/QC Week: 23 – 29 July 2007 Datasheets for reporting purposes MUST be returned by Monday 6 th August 2007

I will be watching wastage like a hawk!