CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

WP CO Status and Progress December 8th, 2010 Johannes Gutleber PR a-JGU, December 8th, 2010 J. Gutleber 1 R. Gutleber.
Design of a dependable Interlock System for linear colliders TE-MPE Technical Meeting 1 Patrice NOUVEL.
Working Group 1: Microwave Acceleration Summary 10 July 2009.
CSC 402, Fall Requirements Analysis for Special Properties Systems Engineering (def?) –why? increasing complexity –ICBM’s (then TMI, Therac, Challenger...)
Technical review on UPS power distribution of the LHC Beam Dumping System (LBDS) Anastasia PATSOULI TE-ABT-EC Proposals for LBDS Powering Improvement 1.
SNS Integrated Control System EPICS Collaboration Meeting SNS Machine Protection System SNS Timing System Coles Sibley xxxx/vlb.
W. Sliwinski – eLTC – 7March08 1 LSA & Safety – Integration of RBAC and MCS in the LHC control system.
Overview of Machine Protection for the LHC
ITER – Interlocks Luis Fernandez December 2014 Central Interlock System CIS v0.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
Consolidation of access systems for the injector Complex ATOP days 4-6 March 2009 P. Ninin & R, Nunes in behalf of the PS and SPS access project teams…
Distribution of machine parameters over GMT in the PS, SPS and future machines J. Serrano, AB-CO-HT TC 6 December 2006.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Feedback from MEF  Only possible, if COMMON COORDINATION MEETINGS  Main possible conflict: SAFETY –No “work permits” in the injectors. MEF working on.
Architectural Design lecture 10. Topics covered Architectural design decisions System organisation Control styles Reference architectures.
Beam Interlock System PR b-CTM, October 7th, 2010 Cesar Torcato de Matos.
FAIR Accelerator Controls Strategy
TS Workshop, Archamps, May 24 – May 26, 2005 The LHC Access System Status report – May 2005 P. Ninin & the Access project team TS/CSE.
Eugenia Hatziangeli Beams Department Controls Group CERN, Accelerators and Technology Sector E.Hatziangeli - CERN-Greece Industry day, Athens 31st March.
Post Mortem Collimators and Movable Objects Michel Jonker Post Mortem Workshop Cern, 16 & 17 January 2007.
Machine Protection TTF Martin Staack DESY MVP TTF2 Review Meeting at Salzau, January 2003.
Timing Requirements for Spallation Neutron Sources Timing system clock synchronized to the storage ring’s revolution frequency. –LANSCE: MHz.
NUCLOTRON CONTROL SYSTEM (NCS) V.Andreev, E.Frolov, A.Kirichenko, A.Kovalenko, B.Vasilishin, V.Volkov Laboratory of High Energies, JINR, Dubna.
CLIC main activities and goals for 2018 Design and Implementation studies: CDR status: not optimized except at 3 TeV and not adjusted for Higgs discovery,
Friday morning Dump fill due to the trip of the RQF.A78  intervention had been just planned for the morning on the circuit Access, interventions:  RQF.A56/78,
BP & RS: BIS & SLP for AB/CO Review, 23 h Sept Realisation of the interlocking between SPS, LHC and CNGS and open issues Beam Interlock Systems.
February 20, 2006 Nodal Architecture Overview Jeyant Tamby 20 Feb 2006.
Machine Interlocks Upgrading MPE workshopChristophe MARTIN14 th Dec
‘Review’ of the machine protection system in the SPS 1 J. Wenninger BE-OP SPS MPS - ATOP 09.
Machine Interlocks in the Injectors IEFC workshopBruno PUCCIO (TE/MPE) 22 nd March v0.
Machine Protection and Operations. CLIC workshop WG :00-10:30.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Beam Interlock System MPP Internal ReviewB. Puccio17-18 th June 2010.
BPM stripline acquisition in CLEX Sébastien Vilalte.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
LIU-PSB BIS presentation / Christophe Martin TE-MPE-EP 28/02/ Beam Interlock System for Transfer Lines & PS Booster Christophe Martin TE/MPE/EP.
Beam losses in the CLIC drive beam: specification of acceptable level and how to handle them ACE Michael Jonker.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
TE/TM 30 th March - 0v1 CERN MPP SMP 3v0 - Introduction 3 *fast *safe *reliable *available generates flags & values.
Beam Interlock System Technology Evaluation and Design MACS Week 1, 2011 Hannes Pavetits 1 R. Gutleber PR a-HPA, March 28 th, 2011 H. Pavetits.
LHC machine protection close-out 1 Close-out. LHC machine protection close-out 2 Introduction The problem is obvious: –Magnetic field increase only a.
PC Current Interlocking for the SPS Fast Extractions. 1 J. Wenninger July 2009.
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
LHC RT feedback(s) CO Viewpoint Kris Kostro, AB/CO/FC.
Summary of Session 1 - CLIC MP workshop 6-8/6/2012, R.Schmidt 1.
Machine Protection Systems (MPS) Arden Warner, and Jim Steimel Project X Machine Advisory Committee March 18-19, 2013.
BIS main electronic modules - Oriented Linac4 - Stéphane Gabourin TE/MPE-EP Workshop on Beam Interlock Systems Jan 2015.
MI Shielding Machine Protection Credit D. Capista March 7,2010.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
23/06/2011 Linac4 BCC meeting. 23/06/2011 Linac4 BCC meeting Watchdog = Machine protection element whose function is to cut the beam if losses exceed.
Machine Protection and Operational Aspects. Launching of the working group M.Jonker CTC
Design process of the Interlock Systems Patrice Nouvel - CERN / Institut National Polytechnique de Toulouse CLIC Workshop Accelerator / Parameters.
Reliability and Performance of the SNS Machine Protection System Doug Curry 2013.
GSI Helmholtzzentrum für Schwerionenforschung GmbH Fast Beam Abort FAIR FC2WG: M.S. Mandaković, CSCO
XFEL The European X-Ray Laser Project X-Ray Free-Electron Laser Wojciech Jalmuzna, Technical University of Lodz, Department of Microelectronics and Computer.
RF acceleration and transverse damper systems
Outcome of BI.DIS Fast Interlocks Peer Review
Overview of the Beam Interlock System
M.Jonker CTC MPO-WG status
SPS CC: Final plan for interlocking of crab cavities in SPS
Measurements, ideas, curiosities
Real-time orbit the LHC
Interlocking of CNGS (and other high intensity beams) at the SPS
Machine Protection System Commissioning plans
1v1.
Explanation of the Basic Principles and Goals
The LHC Beam Interlock System
Close-out.
SPS Injection BIS - Draft requirements
Presentation transcript:

CLIC Interlock System study: from Principle to Prototyping Patrice Nouvel TE-MPE-EP TE-MPE Technical Meeting : 22/03/2012

Topics CLIC Machine ProtectionInterlock System ConceptsRequirements Focus on dependability requirements Specifications Functionality Technology choice Architecture Proofs of concept Functional at CTF3 Hardware Feasibility Study Wrap-up Patrice Nouvel – March 20122

CLIC Machine Protection Patrice Nouvel – March Passive protection (e.g. collimators) Real time protection, partial dump (at first Linac, on rings) Fast failures (beam in-flight): RF cavity breakdown, kicker failure, etc Equipments based Interlock System “Safe by design” principle (2 ms) Inter-cycle failures: Equipment failures Post-Pulse Analysis System Slow beam failures (drift) - Failures classification and their related protection system - Related Document=> CLIC CDR chap 5.16: “CLIC Machine Protection”CLIC CDR chap 5.16

CLIC Interlock System Concepts The CLIC Interlock System is based on two concepts: – Equipments based Interlock System (EIS) : Looks for any equipment failures Inhibits the next pulse => Beam Permit – Post-Pulse Analysis System (PPAS): Performs beam quality analysis Inhibits the next pulse => Next Cycle Permit Patrice Nouvel – March Example: power converter Example: Beam Loss Monitor

Topics CLIC Machine ProtectionInterlock System ConceptsRequirements Focus on dependability requirements Specifications Functionality Technology choice Architecture Proofs of concept Functional at CTF3 Hardware Feasibility Study Wrap-up Patrice Nouvel – March 20125

Requirements cf. concepts Functional requirements Response time: EIS: 2 ms PPAS: 6 ms Dependability attributes (reliability and availability) Two main performance requirements: Patrice Nouvel – March Related Document=> EDMS : “CLIC Interlock Systems Requirements Analysis”EDMS

Dependability requirements - method -

Hazard Chain:

Dependability requirements - method - Interlock System: Active system => can act on the failure frequency

Dependability requirements - method - Related Document => EDMS : “CLIC Interlock Systems Dependability requirements”EDMS Requirement/ratedefinitionValue (conservative case) Machine AvailabilityDead time range allowed to Interlock system[0.30%;0.10%] Machine SafetyProbability of catastrophic event1 / years Machine Availability impact on Interlock System Probability of VETO Decision when PASS decision is expected ≤ 2.8 x (per cycle) = 2 (per year) Machine Safety impact on Interlock System Probability of PASS Decision when VETO decision is expected ≤ 6 x (per cycle) = 0.01 (per year) Interlock System Availability1- (Outage time/expected operation time)≥ 99.29% Interlock System Reliability Amount of not covered beam per operational times ≤ 438/ beams.year -1

Topics CLIC Machine ProtectionInterlock System ConceptsRequirements Focus on dependability requirements Specifications Functional analysis Technology choice Architecture Proofs of concept Functional at CTF3 Hardware Feasibility Study Wrap-up Patrice Nouvel – March

Functional Analysis Patrice Nouvel – March Ready to be processed Threshold comparison Concentrator + correlation Communication with Control System Switches “[…]decompose the system functions to lower-level functions that should be satisfied by elements of the system design (e.g. subsystems, components or parts)” Aim (from IEEE 1220):

Technology Choice Boards: FPGA-based Tradeoff reliability vs. response time MPE Group experience Other options (such as DSP) are not excluded Hardware Platform: follow choice by BE-CO (µTCA/ATCA?) Hardware: critical part Follow choice by BE-CO (such as FESA class) Middleware Software: non-critical part (testing and monitoring purpose) Patrice Nouvel – March

Architecture: Interface with CO system Patrice Nouvel – March CLIC CDR chap 5.13 Control Acquisition and Control Module X

Architecture: Interface with CO system Patrice Nouvel – March CLIC CDR chap 5.13 Control Application Tier Control Center Middle Tier Servers in Surface building Equipment Tier Dedicated Front-End Computer (FEC) Machine Protection surrounded in red CLIC CDR chap 5.13 Control CM CLIC Modules Acquisition and Control Module

Architecture Patrice Nouvel – March

Architecture: EIS Patrice Nouvel – March EIS Architecture: Daisy chain – Response time required: 2 ms Strategy: Beam Permit Loops – Master Module: frequency generator – Other nodes: switches To be investigated: – Multiple frequencies Target systems: RF sources (to be confirmed)

Architecture: PPAS Patrice Nouvel – March PPAS Architecture: Tree topology – Response time required: 6 ms Strategy: Concentrate and Transmit

Topics CLIC Machine ProtectionInterlock System ConceptsRequirements Focus on dependability requirements Specifications Functionality Technology choice Architecture Proofs of concept Functional at CTF3 Hardware Feasibility Study Wrap-up Patrice Nouvel – March

Proofs of concept Patrice Nouvel – March EIS: direct inheritor from LHC BIS => Function well known PPAS: no direct inheritor (multiple concepts: SMP, PM, SIS, Linac4 WD) => need Functional Proof of Concept Functional (un)validate specifications through requirements Use BE-CO technology choices (e.g. White Rabbit Switches) Hardware demonstration

PPAS function at CTF3 CTF3 (CLIC Test Facility 3 rd version): – practical example – CLIC Test Bench Adapted function (very tunable machine) “Automatic Procedure to restart the beam with safety considerations” Patrice Nouvel – March Related Document=> EDMS EDMS

Hardware demonstration Patrice Nouvel – March Step by step approach First objective: 3 node EIS (hereunder) and 3 layer PPAS (same hardware)

Wrap-up Concepts Requirements Specifications: but need to be validated What is defined PPAS at CTF3: in progress (JAVA developing) HW demonstration: on going (budget validation) Proofs of concept status Dependability study (architecture) What is foreseen Patrice Nouvel – March

Thanks for your attention Questions and remarks are very welcome

Spare slides Patrice Nouvel – March

CLIC Layout Patrice Nouvel – March

CLIC Module Patrice Nouvel – March CLIC CDR chap 5.13 Control

CTF3 Layout Patrice Nouvel – March

Dependability concept definition Patrice Nouvel – March

CLIC Failure characterization CLIC - Drive Beam beam Energy Density in copper (J/g) normalized beam hazard (%) Probability of beam not lost (%) without MP risk (%) tolerable risk (%) Safe Beam Pilot 30 bunches 601E-30991E train (24*121 bunches) 1.80E N trainsN * 1.8*10^4---- Binomial law B(N, 99%) nominal beam 24 trains 4.30E B(24,99%)=79% Patrice Nouvel – March CLIC - Main Beam beam Energy Density in copper (J/g) normalized beam hazard (%) Probability of beam not lost (%) without MP risk (%) tolerable risk (%) Safe Beam Pilot (1 bunch) 601E-30991E beam at the start of main linac 3.21E beam at the end of main linac 9.35E

Project methodology IEEE : Standard for Application and Management of the Systems Engineering Process (ISO-IEC 26702) IEEE 1233: IEEE Guide for Developing System Requirements Specifications EIA standard 632: Processes for Engineering a System ISO-IEC 15288: Systems and software engineering — System life cycle processes Patrice Nouvel – March

CLIC operational scenario Patrice Nouvel – March Safe Pilot Beam and PPAS: CLIC CDR chap 5.16 Machine Protection