A Heap Leach Plan. My Concept I’ll build one great big pad I’ll fill it in with rows of material about 40 feet high I’ll then fill in between the rows.

Slides:



Advertisements
Similar presentations
Excavators Cranes(will discuss another section)
Advertisements

Surface Sr. Design Week 7. What You Should Have Distances to Mill and Leach as a Function of Depth Cycle Time Calculations for Proposed Truck Fleets.
Loading and Hauling.
How to Set Up a Processing Plan in MSOPIT’s Economics Panel.
Are You Smarter Than a 5 th Grader? Modified by Ms. McDaniel.
Estimating Dozer Operating Costs ©2005 Dr. B. C. Paul.
3-1. Estimate the actual bucket load in bank measure for a hydraulic excavator – backhoe whose heaped bucket capacity is 2.10 CY (1.6 CM). The machine.
Lecture 4 Excavating and Lifting
Approximately 3 ounces of gold from the mine. Water pump, 2,000 gallons a minute.
Production Capacity of Truck and Loader Teams ©Dr. B. C. Paul 2003.
Handling Solution in a Heap Leach ©2009 Dr. B. C. Paul.
TRUCKS THE MOST COMMON HAULING EQUIPMENT USED FOR MILITARY CONSTRUCTION SITE ARE 2 1/2, 5, AND 20 TON DUMP TRUCKS. THE HAUL CAPACITY CAN BE EXPRESSED.
Catfish Pond Construction Gary Burtle Animal & Dairy Science, UGA Tifton, GA.
Matching An Excavator to Our Trucks ©2009 Dr. B. C. Paul Note – These Slides contain tables and information found in the Caterpillar Performance Handbook.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
1 Math Questions. 2 Length x Width x Water Depth = cubic feet.
Splash Screen. Lesson Menu Five-Minute Check (over Lesson 12–3) Then/Now New Vocabulary Key Concept: Volume of a Pyramid Example 1: Volume of a Pyramid.
Excavating and Lifting Part 2
CTC-375 Construction Methods
Basketball Problem #2 SOLUTION B. Given: The Classroom Owen 241 Find: The number of basketballs required to fill this classroom.
Measuring using… INCHES FEET YARDS MILES
EXAMPLE 1 Finding Perimeter and Area SOLUTION Find the perimeter. P = 2l + 2w Write formula. = 2 ( 8 ) + 2( 5 ) Substitute. = 26 Multiply, then add. Find.
Tire Heating – The TMPH Rating ©Dr. B. C. Paul 2000 revised 2008 Note- These slides demonstrate the use of the FPC computer program developed by the Caterpillar.
Education for Sustainability Flemington School 2007 Our Visit to the Omaranui Landfill, AllBrites and PanPac.
Adjusting a Mine Cost Service Model. A Note About MSOPIT Compatibility Mine Cost Service Expressed Mining Costs as Costs Per tonne of Ore Mined MSOPIT.
THE NATURE OF MEASUREMENT Copyright © Cengage Learning. All rights reserved. 9.
Effects of Human Activity on Water
Getting Cycle Times ©2009 Dr. B C Paul Note – These slides contain material from slides dating back to 2000 and also contains screen shots from the program.
Planning for Earthwork Construction
SHOVELS.
Developing Haulage Profiles (Part of Getting the Truck Cycle Time) ©Dr. B. C. Paul 2000 revised 2008 Note – The instructor prepared the basic steps and.
Actual Costs to fix roads at Fort Peck Reservation 2008 National Tribal Transportation Conference November 12, 2008 Oklahoma City, OK.
16.2.
Matching Shovels ©Dr. B. C. Paul 2000 revised 2008 Note – Matching procedures depicted in these slides are widely understood among those schooled in the.
Area of Surface and Volume of Three-Dimensional Objects
$200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 $200 $300 $400 $500 $100 Radius & Diameter Volume.
Soil Compaction Topic I Topic I.
Will the Pan Overflow?!   Guess how many meatballs it would take for the pan to overflow?  Write.
Step #1 Matching ©Dr. B. C. Paul 2000 revised 2008 Note many of the ideas expressed in these slides can be found in Surface Mining Manuals, the Book Surface.
How to do proportions. How many feet are in 5 yards? Proportion STEPS Keep same units on top, same units on bottom. 1.and 2. What measurements you already.
ESTIMATING EARTHWORK DR. Nabil Dmaidi.
FPC Assignment 1. Go to Your Project and Fire-Up MSOPIT.
A cylindrical tank is initially filled with water to a depth of 16 feet. A valve in the bottom is opened and the water runs out. The depth, h, of the.
Managing Road Maintenance Efficiently and Economically (Doing it Right the First Time) 2015 SDATAT Annual Road Conference Mr. Ken Skorseth SDLTAP Special.
House 18 ft 20 ft Sidewalk is 36 inches wide and 4 inches thick. Driveway is 15 feet wide, 60 feet long, and 6 inches thick. DRIVEWAYDRIVEWAY.
Farm Radio In The Field Additional research component. Respondents were asked to submit daily photos based on the following questions: Where you are when.
Entering Our Choices into FPC ©2009 Dr B C Paul Note – This slide series contains screen shots of the computer program FPC developed by Caterpillar Equipment.
November 29, 2010 Geometry Bellringer & Lesson. Bellringer 1.If my shoe size is 10.5 inches, what is my shoe size in yards? 2.What is the difference between.
Back to menu Final jeopardy question Definitions The Round Let’s Cover Fill It The Whole Up It Up Thing
Related Rates 5.6.
SILOSACK The Collapsible Seed Bin. SILOSACK Why the SILOSACK? Lower Cost to Purchase and Operate – 46% Savings on the purchase price compared to our.
PERIMETER AND AREA Learn to figure out how to measure these…
or * * P =22 in P =40 cm
BY MR. JOHNK CONVERSION FACTORS. units-powerpoints.
© Awad S. Hanna, PhD, P.E.1 Estimating and Scheduling CEE 492 Lecture 5 ESTIMATING EARTHWORK.
Obtaining Moving Cycle Times ©Dr. B. C. Paul 2000 revised 2008 Note – The methods shown in these slides are adapted to use FPC, a program produced by.
Smarter Balance Assessment Great Coffee Cup.
Find THAT Volume! (5.MD.C.5).
Finding Perimeter and Area
5th Grade Module 2 – Lesson 5
Area, Perimeter, and Volume
CONSTRUCTION METHODS & TECHNOLOGY
TRUCKS & HAULING EQUIPMENT
Which earth cycle am I? Answer the questions to figure out what I am. Am I the Water Cycle Nitrogen Cycle Carbon Cycle Oxygen Cycle.
FOUNDATION HOMEWORK For a live load of 600K, determine the size ( in square feet) of a spread concrete footing for the following NYC Code Classifications.
Lecture 5 Dozer TSP-308 MPK Ferdinand Fassa.
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Key ‘Juice’ for the APDC
ESTIMATING EARTHWORK Prof Awad S. Hanna.
Splash Screen.
Presentation transcript:

A Heap Leach Plan

My Concept I’ll build one great big pad I’ll fill it in with rows of material about 40 feet high I’ll then fill in between the rows I’ll then build another line of rows on top

The Vision

Do Some Excel Estimating

A Quick Handle on Trucks Pad Crusher Quick Estimate Haul Distance (about 4000 feet) Quick Estimates from Cat Handbook Cat 793 takes about 6 minutes Loaded to go 4000 feet And about 2.1 for an empty return About 1.2 minutes to dump About 1 minute to load Truck will take about 10.3 minutes A cycle (I can now start guessing my Truck requirements)

Another Cat Book Quicke A D11 can push 2600 loose cubic yards of material 100 feet in an hour I’ll dump and have the dozer push the material out I’ll work from the far end back I’ll do two piles at a time so they will be out of sync with each other.

Cost Estimating With Means I will need to Grade about 3.28 million Square yards At 60 cents each About 2 million

I Need a Clay Layer If I put in a 2 feet Of compacted Clay 1.39/cubic yard For clay fill 3.28 million X.67 X1.39 About 3 million

I Need to Compact the Clay Looks like about 86 cents per Cubic yard 2.2 million cubic Yards at 86 cents Each $1.9 million

Next I Need to Put Down a Geomembrane Looks like about $1.03/square yd 3.3 million Square yards at $1.03 $3.4 million

Next I Need a Rock Drainage Layer About 12 inches Of spread Gravel at $5.55/ square Yard 3.3 million Square yards $18.2 million Total 28.5 million

So What Else Do I Need I need an estimated flow rate for solutions I need an SX plant flow rate This will let me guess on Preg pond size –I will need to build the Preg pond I will need to buy pumps and sprinklers for the solution distribution I’ll need to run the pumps and maintain the water lines I’ll need to figure my truck haulage I’m assuming I already have my delivery cost, crushing costs, SX-EW costs