ICFA DDW'06 - Cracow1 (HEP) GRID Activities in Hungary Csaba Hajdu KFKI RMKI Budapest.

Slides:



Advertisements
Similar presentations
Hungarian HEP-related GRID activities. 1. GRID in Hungary Currently four EGI (formerly EGEE) grid sites operate in Hungary: SiteBMEELTENIIFRMKI CPU25.
Advertisements

LCG Tiziana Ferrari - SC3: INFN installation status report 1 Service Challenge Phase 3: Status report Tiziana Ferrari on behalf of the INFN SC team INFN.
Hungrid A Possible Distributed Computing Platform for Hungarian Fusion Research Szabolcs Hernáth MTA KFKI RMKI EFDA RP Workshop.
LCG-France Project Status Fabio Hernandez Frédérique Chollet Fairouz Malek Réunion Sites LCG-France Annecy, May
Introduction to Grids and Grid applications Gergely Sipos MTA SZTAKI
Southgrid Status Pete Gronbech: 27th June 2006 GridPP 16 QMUL.
Regional Computing Centre for Particle Physics Institute of Physics AS CR (FZU) TIER2 of LCG (LHC Computing Grid) 1M. Lokajicek Dell Presentation.
UKI-SouthGrid Overview Face-2-Face Meeting Pete Gronbech SouthGrid Technical Coordinator Oxford June 2013.
Stefano Belforte INFN Trieste 1 CMS SC4 etc. July 5, 2006 CMS Service Challenge 4 and beyond.
GridPP Steve Lloyd, Chair of the GridPP Collaboration Board.
ITEP participation in the EGEE project NEC’2005, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
Open Science Grid For CI-Days Internet2: Fall Member Meeting, 2007 John McGee – OSG Engagement Manager Renaissance Computing Institute.
Quarterly report SouthernTier-2 Quarter P.D. Gronbech.
Computing for ILC experiment Computing Research Center, KEK Hiroyuki Matsunaga.
HEP Grid Computing in China Gang Workshop on Future PRC-U.S. Cooperation in High Energy Physics.
Preparation of KIPT (Kharkov) computing facilities for CMS data analysis L. Levchuk Kharkov Institute of Physics and Technology (KIPT), Kharkov, Ukraine.
Computing for HEP in the Czech Republic Jiří Chudoba Institute of Physics, AS CR, Prague.
Summary of Accounting Discussion at the GDB in Bologna Dave Kant CCLRC, e-Science Centre.
Open Science Grid For CI-Days Elizabeth City State University Jan-2008 John McGee – OSG Engagement Manager Manager, Cyberinfrastructure.
Quarterly report ScotGrid Quarter Fraser Speirs.
Tier 1 Facility Status and Current Activities Rich Baker Brookhaven National Laboratory NSF/DOE Review of ATLAS Computing June 20, 2002.
IST E-infrastructure shared between Europe and Latin America High Energy Physics Applications in EELA Raquel Pezoa Universidad.
1 1 Service Composition for LHC Computing Grid Monitoring Beob Kyun Kim e-Science Division, KISTI
Grid Computing Status Report Jeff Templon PDP Group, NIKHEF NIKHEF Scientific Advisory Committee 20 May 2005.
SouthGrid SouthGrid SouthGrid is a distributed Tier 2 centre, one of four setup in the UK as part of the GridPP project. SouthGrid.
Tier-2  Data Analysis  MC simulation  Import data from Tier-1 and export MC data CMS GRID COMPUTING AT THE SPANISH TIER-1 AND TIER-2 SITES P. Garcia-Abia.
GridPP Deployment & Operations GridPP has built a Computing Grid of more than 5,000 CPUs, with equipment based at many of the particle physics centres.
São Paulo Regional Analysis Center SPRACE Status Report 22/Aug/2006 SPRACE Status Report 22/Aug/2006.
Slide David Britton, University of Glasgow IET, Oct 09 1 Prof. David Britton GridPP Project leader University of Glasgow GridPP Computing for Particle.
TNC 2006 Catania 17 th May Technical Challenges of Establishing a Pilot Grid Infrastructure in South Eastern Europe Emanouil Atanassov on behalf.
EGEE-II INFSO-RI Enabling Grids for E-sciencE NA2 progress and plans at BME I. Szeberényi Budapest University of Technology and.
EGEE-III INFSO-RI Enabling Grids for E-sciencE Training services offered by SZTAKI for EGEE and EGI Gergely Sipos MTA SZTAKI (Hungarian.
CSCS Status Peter Kunszt Manager Swiss Grid Initiative CHIPP, 21 April, 2006.
October 2006ICFA workshop, Cracow1 HEP grid computing in Portugal Jorge Gomes LIP Computer Centre Lisbon Laboratório de Instrumentação e Física Experimental.
Production Grid Challenges in Hungary Péter Stefán Ferenc Szalai Gábor Vitéz NIIF/HUNGARNET.
V.Ilyin, V.Gavrilov, O.Kodolova, V.Korenkov, E.Tikhonenko Meeting of Russia-CERN JWG on LHC computing CERN, March 14, 2007 RDMS CMS Computing.
The LHC Computing Grid – February 2008 The Challenges of LHC Computing Dr Ian Bird LCG Project Leader 6 th October 2009 Telecom 2009 Youth Forum.
Les Les Robertson LCG Project Leader High Energy Physics using a worldwide computing grid Torino December 2005.
A. Hoummada May Korea Moroccan ATLAS GRID MAGRID Abdeslam Hoummada University HASSAN II Ain Chock B.P Maarif CASABLANCA - MOROCCO National.
11 November 2010 Natascha Hörmann Computing at HEPHY Evaluation 2010.
Derek Ross E-Science Department DCache Deployment at Tier1A UK HEP Sysman April 2005.
SiGNET – Slovenian Production Grid Marko Mikuž Univ. Ljubljana & J. Stefan Institute on behalf of SiGNET team ICFA DDW’06 Kraków, 10 th October 2006.
Rutherford Appleton Lab, UK VOBox Considerations from GridPP. GridPP DTeam Meeting. Wed Sep 13 th 2005.
V.A. Ilyin, ICFA DDW’06, Cracow, 11 October 2006 Networking and Grid in Russia V.A. Ilyin DDW’06, Cracow 11 October 2006.
US-CMS T2 Centers US-CMS Tier 2 Report Patricia McBride Fermilab GDB Meeting August 31, 2007 Triumf - Vancouver.
Testing and integrating the WLCG/EGEE middleware in the LHC computing Simone Campana, Alessandro Di Girolamo, Elisa Lanciotti, Nicolò Magini, Patricia.
ITEP participation in the EGEE project NEC’2007, Varna, Bulgaria Ivan Korolko (ITEP Moscow)
Grid Activities in Portugal Gonçalo Borges Jornadas LIP 2010 Braga, Janeiro 2010.
INFSO-RI Enabling Grids for E-sciencE The EGEE Project Owen Appleton EGEE Dissemination Officer CERN, Switzerland Danish Grid Forum.
IAG – Israel Academic Grid, EGEE and HEP in Israel Prof. David Horn Tel Aviv University.
Ukrainian Academic Grid Initiative (UAGI) Status and outlook G. Zinovjev Bogolyubov Institute for Theoretical Physics Kiev, Ukraine.
Analysis of job submissions through the EGEE Grid Overview The Grid as an environment for large scale job execution is now moving beyond the prototyping.
LCG Pilot Jobs + glexec John Gordon, STFC-RAL GDB 7 December 2007.
EGEE-II INFSO-RI Enabling Grids for E-sciencE EGEE and gLite are registered trademarks EGEE Operations: Evolution of the Role of.
EGI-InSPIRE INFSO-RI EGEE and gLite are registered trademarks Hungrid VO KFKI RMKI Agnes Szeberenyi.
ALICE Physics Data Challenge ’05 and LCG Service Challenge 3 Latchezar Betev / ALICE Geneva, 6 April 2005 LCG Storage Management Workshop.
Building on virtualization capabilities for ExTENCI Carol Song and Preston Smith Rosen Center for Advanced Computing Purdue University ExTENCI Kickoff.
The status of IHEP Beijing Site WLCG Asia-Pacific Workshop Yaodong CHENG IHEP, China 01 December 2006.
Introduction to Grid and Grid applications Peter Kacsuk MTA SZTAKI
EGEE-III INFSO-RI Enabling Grids for E-sciencE Application Porting Support SSC and proposal Gergely Sipos
Bob Jones EGEE Technical Director
A Dutch LHC Tier-1 Facility
NA3 Activities (until April 2005)
NGIs – Turkish Case : TR-Grid
Data Challenge with the Grid in ATLAS
Christos Markou Institute of Nuclear Physics NCSR ‘Demokritos’
The CCIN2P3 and its role in EGEE/LCG
Austria, Czech Republic, Hungary, Poland, Slovakia
LHC Data Analysis using a worldwide computing grid
DEGISCO project - Desktop Grids for application developers and users
Presentation transcript:

ICFA DDW'06 - Cracow1 (HEP) GRID Activities in Hungary Csaba Hajdu KFKI RMKI Budapest

ICFA DDW'06 - Cracow2

3 National Grid Initiative Not really, but something near to it: Hungarian Grid Competence Center – five most active grid participants 2 universities – BME, ELTE 2 reserch institutes – SZTAKI, RMKI + network operator/developer - NIIF

ICFA DDW'06 - Cracow4 Funding Individual grants, no real coordinated efforts Joint effort by MGKK for a larger grant not successful in 2005 National Development Plan >50 million EUR

ICFA DDW'06 - Cracow5 HunGrid VO General purpose scientific and educational national VO – students and other people wishing to learn or experiment with grids can become members easily SZTAKI, RMKI, ELTE and a few other sites support it Ramping up stage - advertised to both users and sites wishing to join

ICFA DDW'06 - Cracow6 Clustergrid General purpose grid project ~1000 CPUs, ~30 TB (~30 labs from ~20 universities)‏ Collection of Condor pools in night+weekend operation mode LCG – Clustregrid gateway under consideration (not easy)‏

ICFA DDW'06 - Cracow7 EGEE Participation in phases I and II – MGKK members NA1-5, SA1 EGEE’07 in Budapest

ICFA DDW'06 - Cracow8 LCG LHC VOs supported by ELTE, NIIF, RMKI RMKI – Research Institute for Particle and Nuclear Physics, Budapest 7 th member in LCG (June 2003)‏ 50 CPUs, 1.5 TB disk Participation in solving early LCG deployment problems Some were even dreaming about becoming a T1 Reality: T2 MOU is not signed yet

ICFA DDW'06 - Cracow9 KFKI RMKI LCG site name: Budapest 110 CPUs TB (DPM), gLite 3.02 All LHC VOs + a few others are supported 2/3 CMS, 1/3 Alice site on the longer run Alice participation just beginning

ICFA DDW'06 - Cracow10 CMS participation Small but active T2 center SC4 and CSA06 Monte Carlo production PheDex transfers Running robot jobs

ICFA DDW'06 - Cracow11 Next steps Get more people involved, especially students Add sites at T3 level Increase CPU and disk capacities at the T2s Sign the T2 MOU with LCG Have a real NGI Participate in Alice and CMS as a small, but fully operational T2