2 Feb 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 1 IEEE802.3aq Channel model ad hoc Task 2 and 4 Launch study Teleconference notes,

Slides:



Advertisements
Similar presentations
16 Sept 04IEEE802.3aq Channel model ad hoc Task 2: Time variation and modal noise 1 Task 2 update: Time variation and modal noise study.
Advertisements

Proposed experiments on time- variation due to polarization and MMF shaking and initial results jonathan king 12-Oct-04.
14 Nov 04IEEE802.3aq Channel model ad hoc Task 2: Time variation and modal noise 1 Task 2, November update Time variation and modal noise study Participants.
19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 1 IEEE802.3aq Channel model ad hoc Task 2 and 4 Launch study Summary of progress 19.
Mode Group Diversity Multiplexing in Step Index and Graded Index Multimode Fibers Grzegorz Stępniak.
Authentication, Access Control, and Authorization (1 of 2) 0 NPRM Request (for 2017) ONC is requesting comment on two-factor authentication in reference.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #18, London Closing Plenary Date Submitted: January, 2007 Presented.
15 Dec 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 5Jan, 2005.
18 Aug 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 18 August 2004 Jonathan King.
9/17/04IEEE 802.3aq Ad-hoc task 4 Comparison of some Cambridge model results with simulation results of RSoft and Optium in-house simulators Gary Shaulov,
Doc.: IEEE /527r1 Submission November 2001 John Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks (WPANs)
1 Experiments on time-variation due to polarization and MMF shaking and initial results jonathan king 27-Oct-04.
1 Experiments on time-variation due to polarization and MMF shaking and results jonathan king 5th-Nov-04.
17-Sept-041 Amplitude vs frequency for LRM vibration tests based on GR-63-CORE Jonathan King IEEE802.3aq Channel model ad hoc Task 2: Time-varying study.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #17, Dallas Closing Plenary Date Submitted: November, 2006 Presented.
15 July 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise Meeting notes, 15 July 2004 Jonathan King.
22 Sept 04IEEE802.3aq Channel model ad hoc Task 2: Time variation and modal noise 1 Task 2 update: Time variation and modal noise study Contributors and.
25 Aug 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 25 August 2004 Jonathan King.
12 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 1 IEEE802.3aq Channel model ad hoc Task 2 and 4 Launch study Teleconference notes,
SMO Agenda point 2 Objectives of the Task Force Meeting NAMEA Task Force Meeting on Energy Accounts 6-7 May 2010.
1 Dec 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal.
15 Dec 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 15 Dec 2004 Jonathan King.
3 Nov 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 3 Nov 2004 Jonathan King.
LBS Drafting Group Session #63.5 Report IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-09/2209 Date Submitted:
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #20, Montreal Closing Plenary Date Submitted: May, 2007 Presented.
February 2, 2016 RMS Meeting 1. * Reasons: * Per the ERCOT Board Report dated 8/5/14 there were 6.6M Advanced Metering System (AMS) Electric Service Identifiers.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Session #26, Jacksonville Closing Plenary Date Submitted: Jan, 2008 Presented.
APHEO Membership Survey Results May 2, APHEO Membership Survey Low membership turn-out at general meetings Obtain membership input on format, location,
DC Architecture WG meeting Wednesday Seminar Room: 5205 (2nd Floor)
12 Aug 04 jonathan kingIEEE802.3aq Channel model ad hoc Task 2: Time variation and modal noise 1 Task 2 update: Time variation and modal noise study.
1 IEEE MEDIA INDEPENDENT HANDOVER DCN: Title: , Melbourne Closing Plenary Date Submitted: September, 2006 Presented at.
Doc.: IEEE /0160r0 Submission March 2004 Dr. John R. Barr, MotorolaSlide 1 Project: IEEE Working Group for Wireless Personal Area Networks.
1 TIA-1083-A Differences Minimal changes for telephones with analog interfaces that were covered by TIA Transverse performance requirements that.
P802.16q Task Group Closing Report for Session #83 [IEEE Mentor Presentation Template (Rev. 0)] Document Number: IEEE Gdoc Date.
Doc.: IEEE /0173r0 Submission Jan 2010 Andrew Myles, CiscoSlide 1 Closing Report Date: Authors:
Doc.: IEEE /026r2 Submission July 1999 Robert F. Heile, GTESlide 1 Bob Heile, Chairman P Working Group Status Presentation to IEEE 802 Standards.
19 Jan 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 1 IEEE802.3aq Channel model ad hoc Task 2 and 4 Launch study Summary of progress 19.
8 Dec 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 8 Dec 2004 Jonathan King.
4 Aug 2004IEEE802.3aq Channel model ad hoc Task 2: Time-varying study & modal noise 1 Teleconference notes, 4 August 2004 Jonathan King.
Transmission Line Studies Need to understand data transmission at 640 Mbps along bus tape. Analytic formulae FEA calculations from Roy. Network analyser.
Updating the UK Physical Activity Guidelines: Scientific Consensus Meeting Nanette Mutrie with help from BHFNC.
Fred Sugihwo, Jonathan King
Teleconference notes, 11 August 2004 Jonathan King
Teleconference notes, 21 July 2004 Jonathan King
Guaranteed issue valuation Table discussion
Everything You Ever Wanted to Know About Filters*
Notes Over 2.1 Function {- 3, - 1, 1, 2 } { 0, 2, 5 }
doc.: IEEE <doc#>
doc.: IEEE <doc#>
January 2014 doc.: IEEE /0084r0 January 2016
IEEE MEDIA INDEPENDENT HANDOVER
Submission Title: [WG-TG3 closing Report May02]
doc.: IEEE <doc#>
Submission Title: [TGn Liaison Report] Date Submitted: [20Jan2006]
<month year> doc.: IEEE < e> <July 2018>
IAASB-IESBA Coordination
doc.: IEEE <doc#>
Spectral Control Issues for TGg
Jul 12, /12/10 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: TG3f Closing Report for July 2017.
Comments on IMT-Advanced Review Process
Academic Freedom & Standards Committee
802.11F Meeting Report May 2001 Month 1998 doc.: IEEE /xxx
January 2014 doc.: IEEE /0084r0 January 2016
Smart Grid ad hoc Closing Report – January 2011
Teleconference notes, 13 Oct 2004 Jonathan King
Summary of task 2 status following Nov meeting
Submission Title: [WG-TG3 Opening Report Jan02]
Alignment of Part 4B with ISAE 3000
Draft Launch Recommendations for insertion into Table 68-3 rev 0.3
IESBA Meeting Nashville June 17-19, 2019
Presentation transcript:

2 Feb 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 1 IEEE802.3aq Channel model ad hoc Task 2 and 4 Launch study Teleconference notes, 2nd Feb 2005 Jonathan King

2 Feb 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 2 Agenda 1)attendees 2)Joint task 2 and task 4 launch study a)status after the Jan 05 meeting b)discussion of residual items for launch study group Is there a CPR spec issue? wider Tx OMA needed? Recommendation for preferred method for implementing the dual launch ? PIE-D for a multi-mode CL type launch on 54YY and 67YY launch? 3)other business 4)next meeting date/time if needed

2 Feb 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 3 1) Attendees Jonathan King, Big Bear Networks Yu Sun, Optium John Ewen, JDSU Piers Dawe, Agilent Andre van Schyndel, Bookham David Cunningham, Agilent Mike Dudek, Picolight Petar Pepeljugoski, IBM John George, OFS

2 Feb 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 4 2) Joint task 2 and task 4 launch study a) Status after the Jan 05 meeting Primary & alternative launches were voted in at the Vancouver task force meeting OM1 - Primary launch via MCP, alternative CL via standard MMF patchcord OM2 - Primary launch via MCP, alternative CL via standard MMF patchcord OM3 - Primary launch CL via standard MMF patchcord, alternative launch via MCP b) Discussion of residual items for launch study group Is there a CPR spec issue ? The revised draft specifies a Tx OMA range that must be met with MPC and MMF patchcords - has the coupled power ratio of TOSA sources been sufficiently accounted for in the spec? Mike Dudek explained that with a typical TOSA there is only partial attenuation of power in the cladding of the TOSA single mode stub output, so the power coupled into a single mode fibre (such as the input of an MCP) is lower than into MMF. Piers Dawe said that coupled power ratio had been accounted for in the OMA spec, but that excess loss of the MCP (max 0.5dB) had not. David Cunningham pointed out that a coupled power ratio spec is unnecessary since the Tx OMA spec bounds the CPR. Does this group need to draft a recommendation for implementing the dual launch ? After discussion it was decided that it was not necessary to add a recommendation concerning the implementation of the dual launch. The standard will specify the MCP as the preferred launch (for example for OM1) and centre launch as an alternative launch. In the field it was expected that CL would be used first, then MCP if needed, as in 1GigE. John George guessed that about 90% of fibres may work first time with centre launch. PIE-D for a multi-mode CL type launch on 54YY and 67YY launch ? The question referred to whether PIE-D values needed to be recalculated for a centre launch from a 'large spot' type launch from a typical TOSA design (using a ball lens and a single mode stub). It was thought that it may be difficult to agree a common definition of a standard launch MPD for this, whereas a single mode fibre launch spot is well defined. Piers Dawe noted that the quality of the launch from the TOSA into MMF was at least partly constrained by the Tx OMA specification and requirement it be met with both MMF and MCP. David Cunningham commented that the advantage of the dual launch approach was not dependent on a tight specification of what centre launch was. John Ewen offered to post a graph of correlation between OSL vs offset bandwidth and OFL bandwidth that shows that at 20 um offset, fibre bandwidth is anti-correlated with OFL bandwidth, while at offsets below 15um, the OSL bandwidth was uncorrelated with OFL bandwidth.

2 Feb 2005IEEE802.3aq Channel model ad hoc Task 2 & 4: Launch Study 5 4) Next meeting Wednesday 9th February am PCT 3) Other business It was decided that the launch study group should convene weekly on an 'as needed basis' with the same format/time as usual