Doc.: IEEE 802.11-11-0982/5 Submission July 2011 Hiroshi Mano (Root Inc.)Slide 1 IEEE 802.11ai Fast Initial Link Setup Agenda for July 2011 San Francisco.

Slides:



Advertisements
Similar presentations
Doc.: IEEE /0715r0 Agenda May 2015 Stephen McCann, BlackBerrySlide 1 IEEE TGaq Teleconference Agenda for May to July 2015 Date:
Advertisements

Doc.: IEEE /0233r0 Agenda March 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE /0698r1 Submission May 2015 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group May 2015 Report.
Doc.: IEEE /0723r4 Agenda July 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE Agenda March 2015 Slide 1 IEEE ai Fast Initial Link Setup Agenda for March 2015 Berlin Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE r4 Agenda Nov 2013 Hiroshi Mano (ATRD, Root, Lab)Slide 1 IEEE ai Fast Initial Link Setup Agenda for Nov 2013 Dallas Date:
Doc.: IEEE /0021r0 Submission January 2011 Stephen McCann, RIMSlide 1 TGu Agenda Date: Authors:
Doc.: IEEE s Submission March 2015 Shoichi Kitazawa,ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE sru Submission October 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /0718r0 Submission July 2015 Edward Au (Marvell Semiconductor)Slide 1 Task Group AY July 2015 Agenda Date: Authors:
Doc.: IEEE /1001r0 Submission Sept 2012 Jon Rosdahl (CSR)Slide 1 Sept 1 st Vice Chair Report Date: Authors:
Doc.: IEEE /1585r0 Submission Nov 2011 Hiroshi Mano (ATRD Root Lab)Slide 1 IEEE TGai Closing Report Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE sru Submission April 2013 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: r02 Submission Aug Hiroshi Mano, Root IncSlide 1 IEEE TGai Fast Initial Link Setup Teleconference Agenda for 2 Aug to 13 Sep 2011.
IEEE q SubmissionChiu Ngo (Samsung)Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission.
Doc.: IEEE s Submission May 2015 Shoichi Kitazawa, ATRSlide 1 Project: IEEE P Working Group for Wireless Personal Area Networks.
Doc.: IEEE /0698r0 Submission May 2015 Xiaoming Peng (I2R)Slide 1 Date: Authors: IEEE aj Task Group March 2015 Report.
Doc.: IEEE / 0404r0 Submission March 2015 Slide 1 TGax PHY Ad Hoc March 2015 Meeting Agenda Date: Authors:
Doc.: r01 Agenda Apr/May Hiroshi Mano, ATRD Root,LabSlide 1 IEEE TGai Fast Initial Link Setup Teleconference Agenda for 9 th Apr 2013.
Doc.: IEEE /0075r0 Report Nov 2011 Jon Rosdahl, CSRSlide 1 First Vice Chair Report 2011 Date: Authors:
Doc.: IEEE /0507r0 Submission TGaj CC12 on 10 April 2014 Report Author: Date: NameCompanyAddressPhone Haiming WANGSEU/CWPAN 2.
Doc.: AgendaHiroshi Mano, Koden-TISlide 1 IEEE TGai Fast Initial Link Setup Teleconference Agenda for March to May 2015 Date:
HL7 / ISOTC215 / IEEE11073 Device Communication Work Group Agenda January 11-16, 2009, Orlando, FL.
Doc.: IEEE /0335r1 SubmissionEldad Perahia, Intel CorporationSlide 1 Date: Authors: TGaj March 2013 Report March 2013.
Doc.: Submission, Slide 1 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4r Opening and Closing for.
Doc.: IEEE s Submission November 2014 Shoichi Kitazawa (ATR)Slide 1 Project: IEEE P Working Group for Wireless Personal Area.
Doc.: IEEE /0335/01 Submission March 2011 Hiroshi Mano (Root Inc.)Slide 1 IEEE ai Fast Initial Link Setup Agenda for March 2011 Singapore.
Doc.: IEEE /0689/02 Submission May 2011 Hiroshi Mano (Root Inc.)Slide 1 IEEE ai Fast Initial Link Setup Agenda for May 2011 Palm Springs.
Doc.: IEEE /1537r0 Submission November 2011 Mark Hamilton, Polycom, Inc.Slide 1 ARC-agenda-minutes-november-2011 Date: Authors:
Doc.: IEEE /1031r5 Agenda September 2014 Stephen McCann, BlackberrySlide 1 TGaq Agenda Date: Authors:
Doc.: IEEE r2 Submission Sep 2012 Hiroshi Mano (ATRD, Root, Lab)Slide 1 IEEE ai Fast Initial Link Setup Agenda for Sep 2012 Palm Springs.
Doc.: IEEE /0491r0 Agenda May 2015 Stephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors:
Doc.: r00 Submission Mar/Apr/May Hiroshi Mano, ATRD Root,LabSlide 1 IEEE TGai Fast Initial Link Setup Teleconference Agenda for 27 th.
Doc.: IEEE /0846r0 Submission July 2015 Slide 1 Date: Authors: IEEE aj Task Group July 2015 Report Jiamin Chen (Huawei/HiSilicon),
Doc.: IEEE /1515r0 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: January 2016.
Doc.: IEEE /0217r7 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: May 2016.
Doc.: IEEE /1230r0 AgendaStephen McCann, BlackBerrySlide 1 TGaq Agenda Date: Authors: November 2015.
Doc.: IEEE /0021r0 Submission January 2013 Jon Rosdahl (CSR)Slide 1 1 st Vice Chair Report January 2013 Date: Authors:
Doc.: IEEE r2 Submission March 2013 Hiroshi Mano (ATRD, Root, Lab)Slide 1 IEEE ai Fast Initial Link Setup Agenda for March 2013 Orlando.
Doc.: AgendaMarc Emmelmann (self)Slide 1 IEEE TGai Fast Initial Link Setup Teleconference Agenda for Feb 2016 – May 2016 Date:
Doc.: IEEE Agenda July 2015 Slide 1 IEEE ai Fast Initial Link Setup Agenda for July 2015 Waikoloa Date: Authors: NameCompanyAddressPhone .
Doc.: IEEE Agenda Jan 2016 Slide 1 IEEE ai Fast Initial Link Setup Agenda for January 2016 Atlanta Date: Authors: NameCompanyAddressPhone .
January, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for January 2015]
IEEE TGai Closing Report
IEEE TGai Teleconference Agenda for Oct 30th 2012
November 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for November.
doc.: IEEE <doc#>
April 2009 doc.: IEEE /xxxxr0 July 2011
July 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [SG SRU Opening Information for July 2014]
September, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
March 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for March 2015]
April 2009 doc.: IEEE /xxxxr0 July 2011
April 2009 doc.: IEEE /xxxxr0 July 2010
September 2014 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for September.
April 2009 doc.: IEEE /xxxxr0 May 2010
April 2009 doc.: IEEE /xxxxr0 July 2011
April 2009 doc.: IEEE /xxxxr0 July 2010
July, 2015 Project: IEEE P Working Group for Wireless Personal Area Networks (WPANs) Submission Title: [TG4s Opening Information for July 2015] Date.
IEEE ai Fast Initial Link Setup Agenda for January 2016 Atlanta
TGae Agenda Date: Authors: March 2011 September 2009
April 2009 doc.: IEEE /xxxxr0 May 2010
IEEE ai Fast Initial Link Setup Agenda for July 2015 Waikoloa
IEEE ai Fast Initial Link Setup Agenda for March 2011 Singapore
HEW SG January 2014 Meeting Agenda
April 2009 doc.: IEEE /xxxxr0 February
April 2009 doc.: IEEE /xxxxr0 Aug
doc.: IEEE <doc#>
April 2009 doc.: IEEE /xxxxr0 September 2010
April 2009 doc.: IEEE /xxxxr0 March
April 2009 doc.: IEEE /xxxxr0 April
Presentation transcript:

doc.: IEEE /5 Submission July 2011 Hiroshi Mano (Root Inc.)Slide 1 IEEE ai Fast Initial Link Setup Agenda for July 2011 San Francisco Date: Authors: NameCompanyAddressPhone Hiroshi MANOROOT Inc.8F TOC2 Bldg Nishi- Gotanda, Shinagawa-ku, Tokyo JAPAN

doc.: IEEE /5 Submission July 2011 Hiroshi Mano (Root Inc.)Slide 2 Abstract Agenda for Fast Initial Link Setup Task Group for July 2011, San Francisco

doc.: IEEE /5 Submission July 2011 Hiroshi Mano (Root Inc.)Slide 3 Meeting Protocol Please announce your affiliation when you first address the group during a meeting slot

doc.: IEEE /5 Submission July 2011 Hiroshi Mano (Root Inc.)Slide 4 Attendance 1.Register 2.Indicate attendance

doc.: IEEE /5 Submission July 2011 Hiroshi Mano (Root Inc.)Slide 5 Attendance, Voting & Document Status Make sure your badges are correct If you plan to make a submission be sure it does not contain company logos or advertising Questions on Voting status, Ballot pool, Access to Reflector, Documentation, member’s area –see Adrian Stephens – Cell Phones Silent or Off

doc.: IEEE /5 Submission Plan for this week San Francisco, July 2011 Official time slot –Monday AM1,PM1 –Tuesday AM2, PM1 –Wednesday PM1, PM2 –Thursday PM1,PM2 Goals for the Meeting: –Review and Approve the Palm Springs and Teleconference meeting minutes –Presentation of submissions Approve Verification of TGai Requirements Submission of Initial technical contribution –TIME line of task group –Plan for September & Teleconference July 2011 Hiroshi Mano (Root Inc.)Slide 6

doc.: IEEE /5 Submission Agenda ( adhoc ) Monday, July 18th, 2011 – 09:00-11:00 TGai MEETING CALLED TO ORDER CALL FOR ESSENTIAL PATENTS AND POLICIES & PROCEDURES REMINDER Modify and/or Approve Agenda Review and Palm Springs and Teleconference meeting minutes. –May 2011 Palm Springs session minutes, 11/ ai-may palm-springs-session-minutes.doc –May-July Teleconference minutes, 11/ ai-may-july- teleconference-minutes.doc Review –11/ r01 Verification of TGai Requirements Plan for the Week Recess until PM1 July 2011 Hiroshi Mano (Root Inc.)Slide 7

doc.: IEEE /5 Submission Agenda Monday, July 18th, 2011 – 13:30-15:30 TGai MEETING CALLED TO ORDER CALL FOR ESSENTIAL PATENTS AND POLICIES & PROCEDURES REMINDER Modify and/or Approve Agenda Review and Approve Palm Springs and Teleconference meeting minutes –May 2011 Palm Springs session minutes, 11/ ai-may-2011-palm- springs-session-minutes.doc –May-July Teleconference minutes, 11/ ai-may-july-teleconference- minutes.doc Review and Approve “Verification of TGai Requirements” –11/ r05 TGai evaluation methodology Presentation of technical contribution –11/0976r1 TGai Authentication Protocol Proposal / Hitoshi Morioka (Root,Inc.) –11/0977r1 TGai Upper Layer Setup Proposal / Hitoshi Morioka (Root,Inc.) –11/1015/r0 Network Selection Optimization / Gabor Bajko (Nokia) Recess until Tuesday AM2 July 2011 Hiroshi Mano (Root Inc.)Slide 8

doc.: IEEE /5 Submission Agenda Tuesday, July 19th, 2011 – 10:30-12:30 TGai MEETING CALLED TO ORDER CALL FOR ESSENTIAL PATENTS AND POLICIES & PROCEDURES REMINDER Modify and/or Approve Agenda Review and Approve TGai evaluation methodology –11/ r06 TGai evaluation methodology Presentation of technical contribution –11/1012/r0 IP address configuration during association / Gabor Bajko (Nokia) 20min –11/1014/r0 IP address configuration during association / Gabor Bajko (Nokia) 20min Recess until PM1 July 2011 Hiroshi Mano (Root Inc.)Slide 9

doc.: IEEE /5 Submission Agenda Tuesday, July 19 th, 2011 – 13:30-15:30 TGai MEETING CALLED TO ORDER CALL FOR ESSENTIAL PATENTS AND POLICIES & PROCEDURES REMINDER Modify and/or Approve Agenda Presentation of technical contribution –11/1000r1 TGai FILS proposal / Jihyun Lee (LG) 30min –11/1003r2 TGai Upper layer data for management frames / Hiroki Nakano (TNT) 30min –11/ r0 Using Upper Layer Message IE in TGai / Ping Fang (Huawei) Editors Report –11/ r0 Editors Report / Tom Siep (CSR) Recess until Wednesday PM1 July 2011 Hiroshi Mano (Root Inc.)Slide 10

doc.: IEEE /5 Submission Agenda Wednesday, July 19 th, 2011 – 13:30-15:30 TGai MEETING CALLED TO ORDER CALL FOR ESSENTIAL PATENTS AND POLICIES & PROCEDURES REMINDER Modify and/or Approve Agenda General presentation –11/ r0 Air-time Consumption by Beacon and Probe / Hitoshi Morioka (Root,Inc.) –11/ r0 supported operating band / Bajko Gabor (Nokia) Thursday PM1 July 2011 Hiroshi Mano (Root Inc.)Slide 11

doc.: IEEE /5 Submission Agenda Thursday, July 20th, 2011 – 13:30-15:30 TGai MEETING CALLED TO ORDER CALL FOR ESSENTIAL PATENTS AND POLICIES & PROCEDURES REMINDER Modify and/or Approve Agenda Presentation of technical contribution 11/0976r3 TGai Authentication Protocol Proposal / Hitoshi Morioka (Root,Inc.) General presentation Recess until PM2 July 2011 Hiroshi Mano (Root Inc.)Slide 12

doc.: IEEE /5 Submission Agenda Thursday, July 20th, 2011 – 16:00-18:00 TGai MEETING CALLED TO ORDER CALL FOR ESSENTIAL PATENTS AND POLICIES & PROCEDURES REMINDER Modify and/or Approve Agenda Presentation of technical contribution General presentation 11/1066r1 Fast Security Setup /Robert Moskowitz (Verizon) TIME line of task group Plan for September & Teleconference Adjourn July 2011 Hiroshi Mano (Root Inc.)Slide 13

doc.: IEEE /5 Submission Administrative Items Please be familiar with the documents at the following links: –IEEE Patent Policy - –Patent FAQ - –LoA Form - –Affiliation FAQ - –Anti-Trust FAQ - –Ethics - –IEEE Working Group Policies and Procedures - file/07/ policies-and-procedures.dochttps://mentor.ieee.org/802.11/public- file/07/ policies-and-procedures.doc Task Group ai (Fast Initial Link Setup) Chair and secretary –Chair :Hiroshi Mano (Root Inc) –Vice Chair: Marc Emmelman (Fokus) –Technical Editor: Tomas Siep (CSR) –Secretary: Hitoshi Morioka (Root, Inc.) Recording your attendance – July 2011 Slide 14Hiroshi Mano (Root Inc.)

doc.: IEEE /5 Submission Participants, Patents, and Duty to Inform All participants in this meeting have certain obligations under the IEEE-SA Patent Policy. Participants: l “Shall inform the IEEE (or cause the IEEE to be informed)” of the identity of each “holder of any potential Essential Patent Claims of which they are personally aware” if the claims are owned or controlled by the participant or the entity the participant is from, employed by, or otherwise represents l “Personal awareness” means that the participant “is personally aware that the holder may have a potential Essential Patent Claim,” even if the participant is not personally aware of the specific patents or patent claims l “Should inform the IEEE (or cause the IEEE to be informed)” of the identity of “any other holders of such potential Essential Patent Claims” (that is, third parties that are not affiliated with the participant, with the participant’s employer, or with anyone else that the participant is from or otherwise represents) l The above does not apply if the patent claim is already the subject of an Accepted Letter of Assurance that applies to the proposed standard(s) under consideration by this group Quoted text excerpted from IEEE-SA Standards Board Bylaws subclause 6.2 l Early identification of holders of potential Essential Patent Claims is strongly encouraged l No duty to perform a patent search July 2011 Slide 15Hiroshi Mano (Root Inc.)

doc.: IEEE /5 Submission Patent Related Links All participants should be familiar with their obligations under the IEEE-SA Policies & Procedures for standards development. Patent Policy is stated in these sources: IEEE-SA Standards Boards Bylaws IEEE-SA Standards Board Operations Manual Material about the patent policy is available at If you have questions, contact the IEEE-SA Standards Board Patent Committee Administrator at or visit This slide set is available at July 2011 Slide 16Hiroshi Mano (Root Inc.)

doc.: IEEE /5 Submission Call for Potentially Essential Patents If anyone in this meeting is personally aware of the holder of any patent claims that are potentially essential to implementation of the proposed standard(s) under consideration by this group and that are not already the subject of an Accepted Letter of Assurance: –Either speak up now or –Provide the chair of this group with the identity of the holder(s) of any and all such claims as soon as possible or –Cause an LOA to be submitted July 2011 Slide 17Hiroshi Mano (Root Inc.)

doc.: IEEE /5 Submission Other Guidelines for IEEE WG Meetings l All IEEE-SA standards meetings shall be conducted in compliance with all applicable laws, including antitrust and competition laws. l Don’t discuss the interpretation, validity, or essentiality of patents/patent claims. l Don’t discuss specific license rates, terms, or conditions. l Relative costs, including licensing costs of essential patent claims, of different technical approaches may be discussed in standards development meetings. l Technical considerations remain primary focus l Don’t discuss or engage in the fixing of product prices, allocation of customers, or division of sales markets. l Don’t discuss the status or substance of ongoing or threatened litigation. l Don’t be silent if inappropriate topics are discussed … do formally object See IEEE-SA Standards Board Operations Manual, clause and “Promoting Competition and Innovation: What You Need to Know about the IEEE Standards Association's Antitrust and Competition Policy” for more details. July 2011 Slide 18Hiroshi Mano (Root Inc.)

doc.: IEEE /5 Submission Approve TGai meeting minutes of Palm Springs face-to-face meeting. Motion: Approve TGai Meeting Minutes for the IEEE March 2011 Plenary : –May 2011 Palm Springs session minutes, 11/ ai- may-2011-palm-springs-session-minutes.doc July 2011 Hiroshi Mano (Root Inc.)Slide 19

doc.: IEEE /5 Submission Approve TGai teleconference meeting minutes of Palm Springs to San Francisco meeting. Motion: Approve TGai teleconference meeting minutes of Palm Springs to San Francisco meeting.: –May-July Teleconference minutes, 11/ ai-may-july- teleconference-minutes.doc July 2011 Hiroshi Mano (Root Inc.)Slide 20

doc.: IEEE /5 Submission Motion to approve TGai evaluation methodology document Move to accept all changes to and upload the revised document as rev 07 to the server, accept as TGai evaluation methodology document. Mover : Marc Emmelmann (Fokus) Second : Tom Siep (CSR) Result May 2011 Hiroshi Mano (Root Inc.)Slide 21

doc.: IEEE /5 Submission Teleconference Schedule Motion: –Approve the following schedule of weekly teleconferences. – Tuesdays 09:00 EDT (NY Time) continue from 2 nd Aug. –Duration 1Hour –Using WEB-EX that will be provided by Task Group Chair Moved: (), Seconded: () Result: - - July 2011 Hiroshi Mano (Root Inc.)Slide 22

doc.: IEEE /5 Submission Time line of TGai PAR Approved, Modified, or Extended [Expires] –WG Letter Ballots Initial / RecircMar 12 / Jul 12 –Form Sponsor Ballot Pool / Reform Jan 13 –MEC DoneJan13 –IEEE-SA Sponsor Ballots Initial / Recirc Mar13/ Jul13 –Final WG Approval Jan 14 –final or Conditional 802 EC Approval Jan 14 –RevCom & Standards Board Final or Continuous Process Approval Mar14 –ANSI ApprovedN/A July 2011 Hiroshi Mano (Root Inc.)Slide 23

doc.: IEEE /5 Submission Plan for September Plan for July –Goal Submission of Initial technical contribution General submission July 2011 Hiroshi Mano (Root Inc.)Slide 24

doc.: IEEE /5 Submission Conformance w/ Tgai PAR & 5C January 2011 Marc Emmelmann, Fraunhofer FokusSlide 25 Conformance QuestionResponse Does the proposal degrade the security offered by Robust Security Network Association (RSNA) already defined in ? Yes / No Does the proposal change the MAC SAP interface?Yes / No Does the proposal require or introduce a change to the architecture?Yes / No Does the proposal introduce a change in the channel access mechanism?Yes / No Does the proposal introduce a change in the PHY?Yes / No Which of the following link set-up phases is addressed by the proposal? (1) AP Discovery (2) Network Discovery (3) Link (re-)establishment / exchange of security related messages (4) Higher layer aspects, e.g. IP address assignment 1,3,4 (list of applicable phases) Please add this table (IEEE /2 ) to describe the conformance to PAR & 5C.