NERC Field Trial ERCOT Time Error Correction. Balancing Authority Control Standards Drafting Team (BACSDT) Pursuing the option to eliminate Time Error.

Slides:



Advertisements
Similar presentations
2004 NERC, NPCC & New England Compliance Programs John Norden Manager, Operations Training, Documentation & Compliance August 31, 2003 RC Meeting.
Advertisements

Business Practices Subcommittee Update August 17, 2010.
Business Practices Subcommittee Update October 26, 2010.
Business Practices Subcommittee Update February 2, 2010.
Business Practices Subcommittee Update February 1, 2011.
Business Practices Subcommittee Update February 3, 2009.
WECC Reliability Based Control Field Trial
Bob Harshbarger Volunteer Order 771 January 16, 2013 Still Icy-Cold Salt Lake.
BAL-002-WECC-1 Contingency Reserves
Cleco Transmission Planning Summit Attachment K November 15, 2007 Terry Whitmore.
Brenda Ambrosi ISAS Chair OC Update August 2012 Salt Lake City, UT.
NERC Operating Committee Activities Update June 10-11, 2014 Meeting.
WECC Reliability Based Control Field Trial
NERC Operating Committee Activities Update September 16-17, 2014 Meeting.
PER
NAESB Time and Inadvertent Management Business Practice (TIMBP) February 3, 2009 Terry Bilke.
SAR-003-TRE-001 FERC-Ordered Modification to ERCOT waiver CPS2 Prepared By Ananth Palani, EnergyCo.
Standards Development: Update to IMO Regulatory Standing Committee May 14, 2003.
Generator Governor Frequency Response Alert
ERCOT’S COMPLIANCE ASSESSMENT PROGRAM Mark Henry Compliance Manager March 23, 2005.
WECC Market Interface Committee Update WSPP Spring 2008 Meeting April 8, 2008 Robert D. Schwermann MIC Chair.
Texas Regional Entity Update Sam Jones Interim CEO and President Board of Directors July 18, 2006.
Business Practices Subcommittee Update May 4, 2010.
Standards Review Subcommittee Update November 2007 – January 2008 February 5, 2008.
July 2008 CPS2 Waiver SDT Technical Workshop for Draft BAL-001-TRE-01 Judith A. James Reliability Standards Manager TRE.
Paragraph 81 Project. 2RELIABILITY | ACCOUNTABILITY Background FERC March 15, 2012 Order regarding the Find, Fix, Track and Report (FFT) process  Paragraph.
Date 05/01/2012 MIT Manual TEC Analysis Sandip Sharma ERCOT.
Business Practices Subcommittee Update Executive Committee Meeting October 20, 2015.
Standards Review Subcommittee Update August 17, 2010.
Page 1 of 13 Texas Regional Entity ROS Presentation April 16, 2009 T EXAS RE ROS P RESENTATION A PRIL 2009.
Overview of Texas RE Reliability Standards Process and 2008 Year in Review Judith James Manager, Reliability Standards.
Retail Market Subcommittee Visibility into OGRR219.
RSC An Overview of Fill-In-the-Blanks (FIB) Reliability Standards Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity
BAL-001-TRE-01 ERCOT CPS2 R2 Waiver Regional Variance April 16, 2009 Sydney Niemeyer.
Electric Reliability Organization and Issues in Texas Technical Advisory Committee January 4, 2006 Jess Totten Director, Electric Industry Oversight Division.
Grid Operations Report To ERCOT Board Of Directors December 16, 2003 Sam Jones, COO.
Texas Regional Entity ROS Presentation January 15, 2009 T EXAS RE ROS P RESENTATION J ANUARY 2009.
SAR 001 DT Presentation Texas RE Presentation to SAR-001 Drafting Team Farzaneh Tafreshi Manager, Reliability Standards Texas Regional Entity.
ROS Report to TAC October 5, Outline  General Items  Nodal Operating Guides  OGRR192  Document control issues  Proposed revisions to Texas.
Business Practices Subcommittee Update October 27, 2009.
Business Practices Subcommittee Update Executive Committee Meeting August 18, 2015.
Reliability Standards Development Plan David Taylor Manager Standards Development Standards Committee Meeting June 12-13, 2008.
Standards Review Subcommittee Update August 19, 2014 Co-Chairs Rebecca Berdahl, BPA Marie Knox, MISO.
Business Practices Subcommittee Update August 16, 2011.
Business Practices Subcommittee Update Executive Committee Meeting February 23, 2016.
North America Energy Standards Board Craig L. Williams, Specialist Ld./Sr. ISAS Meeting April 20, 2016 Salt Lake City, UT W ESTERN E LECTRICITY C OORDINATING.
North America Energy Standards Board Craig L. Williams, Specialist Ld./Sr. MIC Meeting March 23, 2016 La Jolla, CA W ESTERN E LECTRICITY C OORDINATING.
1 Compliance Update May Control Performance Highlights  NERC CPS1 Performance April Performance  April performance comparison April 2007:
NERC Transmission System Vegetation Management Standard ERCOT TAC Update Mike Boone – CenterPoint Energy John Schechter – AEP August 4, 2005 Austin, TX.
Reliability Standards Committee 2009 Scope and Plan Judith James Manager, Reliability Standards.
Standards Review Subcommittee Update August 18, 2015 Chair Rebecca Berdahl, BPA.
NERC vs. RTOs July 16, 2001.
Top 10 Questions on Regional Reliability Standards Development Judith A. James Manager, Reliability Standards March 5, 2009 June 2008 TAC.
NERC Reliability Standard EOP 001
Business Practices Subcommittee Update
WECC-0118 Removal of Interchange Authority
Kenneth Silver Los Angeles Department of Water & Power
Manual Time Error Correction Discussion
Standard Review Subcommittee Update
Anitha Neve Operations and Interchange Specialist
Anitha Neve Operations and Interchange Specialist
Reliability Standards Development Plan
Anitha Neve Operations and Interchange Specialist
Anitha Neve Operations and Interchange Specialist
Standards Review Subcommittee Update
North America Energy Standards Board
North America Energy Standards Board
Kenneth Silver Los Angeles Department of Water & Power
Standards Review Subcommittee Update
Standards Review Subcommittee Update
Presentation transcript:

NERC Field Trial ERCOT Time Error Correction

Balancing Authority Control Standards Drafting Team (BACSDT) Pursuing the option to eliminate Time Error Correction (TEC) as a reliability standard defined in BAL Completed Industry Survey TEC paper covering the history and reasons to remove/keep TEC went out with the Survey Initiating Field Trial to reduce TEC offset from 20 to 10mHz (Eastern Interconnect) Initiating Field Trial to NOT perform Time Error Correction (ERCOT)

Balance Authority Control SDT Tasks Address the following: FERC Order 693” applies to NERC standards BAL-002, 004, 005, and 006  Time Error Correction  special Area Control Error cases  Inadvertent Interchange  reliability requirements/business practices with NERC and NAESB collaborative participation

Field Trial in ERCOT Have: 1.Written verification from NERC that ERCOT ISO will not be in violation of NERC standards Need: 1.Need Stakeholder support of OGR to modify TEC requirement 2.Written verification from TRE that ERCOT will not be in violation of the Protocols and OG’s

OGRR219 Section 1.5, Time Error Monitoring Modify the last sentence by removing the following text: ‘however, at no time should the accumulated time error be allowed to exceed five (5) seconds.’