Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 4, 2011.

Slides:



Advertisements
Similar presentations
Accelerator Science and Technology Centre Prospects of Compact Crab Cavities for LHC Peter McIntosh LHC-CC Workshop, CERN 21 st August 2008.
Advertisements

SLAC rotating collimator for HiRadMat beam tests 14 March 2014 S. Redaelli, A. Bertarelli, CERN T. Markiewicz, SLAC US LHC Accelerator Research Program.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
LARP Rotatable Collimator Prototype Assembly completed and all mechanical tests successful: Cooling tubes now twist, under vacuum, as jaws turn, with R~1.
HL-LHC WP2 Brainstorming Meeting 1 Purpose of this meeting:  Introduce the main objectives of the new HL-LHC project: Prepare technical proposal by 2013.
Eric Prebys LARP Program Director 1/8/09.  This meeting will be both and update and an official response to the review of LARP which took place at LBNL.
Few slides from J. Fox’ talk in last November’s LARP meeting LARP CM
Eric Prebys LARP Program Director 1/8/09.  Background  Summary of review findings  Partial response  Coordination with CERN  New initiatives  Lumi.
LARP Program Perspective G. Apollinari - LARP Director FCC Week 2015.
Eric Prebys LARP Program Director Jaunary 14, 2009.
 Guidance from DOE  $13M with a 6 month continuing resolution at 84%.5*.84*13+.5*13 = $11.96M  Separate money ($1-2M) found for APL planning!  General.
Eric Prebys Fermilab APC Program Director, LARP April 15, 2010.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 16, 2010.
Eric Prebys 10/28/2008.  There is a great deal of synergy between PS2 and the Fermilab Main Injector during the Project X era.  High energy ion transport,
 Good  LARP has grown significantly in size since it started  Gained credibility both here and at CERN US Labs like it as a way to support work CERN.
SLAC Accelerator Development Program LHC Accelerator Research Tom Markiewicz OHEP Accelerator Development Review January 24-26, 2011.
Ralph Assmann What Do We Want To Measure (in 2009) R. Assmann S. Redaelli, V. Previtali CERN/BE discussed with W. Scandale CERN/EN26/3/2009CC09  See also.
CesrTA Experimental Plan M. Palmer for the CesrTA Collaboration November 17, 2008.
Eric Prebys, Fermilab Director, LARP November 13, 2014.
LHC-CC10, 4th LHC Crab Cavity Workshop Summary Session 5: Crab Cavity Beam Studies P. Collier.
US LHC Accelerator Research Program Jim Strait For the BNL-FNAL-LBNL LHC Accelerator Collaboration DOE Meeting 18 April 2003 brookhaven - fermilab - berkeley.
Preparation of Review R. Assmann et al CWG, CWG R. Assmann.
Eric Prebys LARP Program Director 7/13/09.  Background  Summary of findings from last review  Partial response  Coordination with CERN  New initiatives.
Eric Prebys Accelerator Physics Center Program Director, LARP December 7, 2009.
1 BNL LARP Accelerator Physics Program Resources BNL role in national program BNL Accelerator Physics Program.
J. Strait Fermilab 16 October 2006 Consideration on LHC upgrade from A US perspective.
F LHC Accelerator Research Program Accelerator Systems Tanaji Sen FNAL/APC  Project management  Accelerator Physics  Instrumentation  Beam commissioning.
Machine development - results and plans – critical results, what’s to be done? R. Assmann 15/07/2011 R. Assmann for the LHC MD coordination team (R. Assmann,
CERN Phase II Collimation Conceptual Review Summary 09 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
View From CERN Summary of Upgrade Projects:  Phase 1 IR upgrade: construction project  LINAC4: construction project  Phase 2 collimation: design finalization.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) March 15, 2011.
Project X RD&D Plan Beam Transfer Line and Recycler Injection David Johnson AAC Meeting February 3, 2009.
LARP Accelerator Systems 6-Year Plan FY09-FY14 10 April 2009 LARP CM12 Napa, CA Tom Markiewicz/SLAC BNL - FNAL- LBNL - SLAC US LHC Accelerator Research.
US LHC Accelerator Research Program (LARP) Background  Proposed in 2003 to coordinate efforts at US labs related to the LHC accelerator (as opposed to.
The SPS as a Damping Ring Test Facility for CLIC March 6 th, 2013 Yannis PAPAPHILIPPOU CERN CLIC Collaboration Working meeting.
Updated Overview of Run II Upgrade Plan Beam Instrumentation Bob Webber Run II Luminosity Upgrade Review February 2004.
LHC-CC Validity Requirements & Tests LHC Crab Cavity Mini Workshop at CERN; 21. August Remarks on using the LHC as a test bed for R&D equipment.
Eric Prebys LARP Program Director January 14, 2009.
Beam-beam compensation at RHIC LARP Proposal Tanaji Sen, Wolfram Fischer Thanks to Jean-Pierre Koutchouk, Frank Zimmermann.
U.S. Activities on the High-Luminosity LHC: LARP Sustainability & Evolution as a Construction Project HiLumi-LARP Collaboration Meeting October 26, 2015.
Proton Driver Design Keith Gollwitzer Fermilab February 19, 2014.
Eric Prebys LARP Program Director July 14, LARP FY10 and Beyond - E. Prebys 2 Guidance: LARP funding decreases $1M/yr Assume: $13 M LARP total for.
LARP Review, June 12-14, 2006 Prebys, Todesco, Zisman 1 Accelerator Systems Eric Prebys Ezio Todesco Mike Zisman.
EU accelerator contributions to the IDS … R. Garoby ISS meeting RAL 28/04/2006.
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Updates on Tevatron and LARP Vladimir Shiltsev FNAL/Accelerator Physics LARP/Accelerator Systems.
 Presented ongoing activities in LARP  Magnet Systems  Accelerator Systems  Program Management  Also presented plan for “spinning off” construction.
Eric Prebys, Fermilab Director, LARP October 29, 2010 *plus a bit of LAFS.
Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) May 16, 2011.
Eric Prebys, Fermilab Program Director, LARP July 10, 2012.
Crab Cavities for the HL-LHC Project Definition and Design Study E. Ciapala, E. Jensen, J. Tuckmantel (CERN) R. Calaga (BNL) US-LARP CM15, November 2010,
The HiLumi LHC Design Study is included in the High Luminosity LHC project and is partly funded by the European Commission within the Framework Programme.
Eric Prebys, Fermilab Director, LARP November 13, 2014.
Global Collaborations Towards LHC Crab Cavity J. P. Koutchouk Thanks to Rama Calaga and Rogelio Tomas Crab Cavity Validity Requirement Workshop August.
Collimation Aspects for Crab Cavities? R. Assmann, CERN Thanks to Daniel Wollmann for presenting this talk on my behalf (criticism and complaints please.
Eric Prebys LARP Program Director 7/13/09.  Background  Progress and Highlights in 2010  Summary of findings from last review  Chamonix  New schedule.
Eric Prebys Accelerator Physics Center Program Director, LARP Important material Contributed by Elliott McCrory (FNAL), Ryoichi Miyamoto (BNL), Alan Fisher.
LARP Accelerator Systems D. Rice, J. Rosenzweig, M. White LARP 2009 review.
ICE SECTION The coolest place to be! Elias Métral
Plans towards CC in the LHC a US – centric perspective
Review of options for crab cavities in LHC:
contribution to the round table discussion
US LHC Accelerator Research Program (LARP)
19th Hadron Synchrotron Incoherent effects section meeting
Acknowledgments: LIU-PT members and deputies, H. Bartosik
CLIC-ILC BDS & MDI work.
23 April 2012 Tom Markiewicz/SLAC
CSP Meeting CERN CERN Accelerators in th November 2010
SLHC-PP kick-off meeting, CERN 9 April 2008
Presentation transcript:

Eric Prebys, Fermilab Director, US LHC Accelerator Research Program (LARP) February 4, 2011

 Part 1 (E. Prebys)  Our impressions from Chamonix Discussion  Key activities and topics Discussion following each item  State of the HL-LHC and injector projects and relationship to LARP  Part 2 (G. Sabbi)  LARP Magnet Program and integration into HL-LHC plan I would like this meeting to be used primarily for discussion, so we’ll keep formal presentations to a minimum. February 4, Eric Prebys - USLARP/CERN Meeting

(…) Letter to Dennis Kovar, Head Office of DOE Office of High Energy Physics, 17-August-2010 February 4, Eric Prebys - USLARP/CERN Meeting

 Energy=  Most anticipated decision, but no real effect on LARP  Schedule  As expected, the LHC will run through 2012  How does this affect LARP long term plans?  Collimation  The current collimation system is working much better than expected  What are the implications for the LARP collimation program (more about this shortly)?  E-Cloud  The SPS feedback system was discussed and the LARP effort specifically mentioned.  What future does this have?  What are you counting on from LARP? February 4, Eric Prebys - USLARP/CERN Meeting

 Crabs  Not really discussed much  We’re still assuming they’re the base line option?  HL-LHC  Will the ultimate luminosity of the initial configuration alter plans and goals for the HL-LHC upgrade?  Magnets  Not really discussed  How likely is the 150 mm aperture mentioned in Stephan’s talk?  PSB/RCS Options  What is the path to a decision?  Where can LARP help? February 4, Eric Prebys - USLARP/CERN Meeting

 Luminosity monitor  Primary tool for fast luminosity measurements and VDM’s  Schottky Detector  Can now be used for bunch by bunch tune measurements  Improved support for remote access to data February 4, Eric Prebys - USLARP/CERN Meeting per bunch lumi ions

 AC Dipole  Continues to be the primary tool for high field optics measurements  SLM  Saw ion bunches  Focal problem identified and fixed, which should eliminate inconsistency between SLM and flying wire. February 4, Eric Prebys - USLARP/CERN Meeting

 LLRF Tools  Leverage RF tools and techniques developed at PEP-II  Configuration tools used extensively during LHC RF commissioning and operation. February 4, Eric Prebys - USLARP/CERN Meeting

 Handoff and support?  Our impression is that everything is either handed off or in the process of being handed off.  Is there anything more we need to do on our end?  Are there additional instrumentation topics where we could contribute?  Noting that we’ve already passed on the PSB IPM’s February 4, Eric Prebys - USLARP/CERN Meeting

 This year, LARP supported four long term visitors:  Uli Wienands (SLAC) PS2 close out LARP PSB coordination UA9 work  Chandra Bhatt(FNAL) Long bunch studies for LPA option  Rama Calaga (former Toohig Fellow) Commissioning Crab Cavities  Eliana Gianfelice-Wendt Gap cleaning studies  In addition, former long term visitor Alan Fisher has continued to make contributions to the SLM system. February 4, Eric Prebys - USLARP/CERN Meeting

 Continuing Fellows  Dariusz Bocian (FNAL) Working on modeling of the Nb3Sn magnets Extended for third year  Ryoichi Miyamoto (BNL) AC Dipole and Lumi monitor Extended for third year  Riccardo DiMaria Left Toohig Fellowship to become CERN Fellow  New Fellows  Simon White (BNL) luminosity measurement, electron lenses  Themis Mastoridis (SLAC) LLRF and high bandwidth SPS damping system February 4, Eric Prebys - USLARP/CERN Meeting

 Are LARP visitors at CERN being used effectively?  Are there more activities were LARP personnel would be useful? February 4, Eric Prebys - USLARP/CERN Meeting

 Jaws, supports, rotation drives, vacuum tank, BPM assembly ready & tested  Installation & functional tests of RF foils joining jaws to beam-line in progress  Next Steps:  Remount jaws so that future rotations twist the cooling tubes as per design; retest rotation.  Weld on vacuum tank cover, evacuate, retest; vacuum bakeout, RGA scan at torr, retest.  Ship, retest & fiducialize at CERN, install in SPS Anticipate shipment to CERN in early March  Details of destructive tests in HiRadMat Facility under discussion  Whether/how to proceed to partner with CERN for production versions needs guidance BPM Rotation Drive CERN Phase I Drive Table February 4, Eric Prebys - USLARP/CERN Meeting

 Both experiments saw improved configuration in 2010  UA9: improved goniometers and instrumentation installed over winter shutdown  T980: New crystals and instrumentation  Very impressive channeling data from both experiments T980 UA9 February 4, Eric Prebys - USLARP/CERN Meeting

February 4, Eric Prebys - USLARP/CERN Meeting

 Beam loss much lower than anticipated  No intensity limit at 3.5 TeV  Intensity 30% of nominal at 7 TeV better worse 2010 analysis *from Ralph Assmann’s Chamonix talk February 4, Eric Prebys - USLARP/CERN Meeting

 How does the unexpectedly good performance of the collimation system affect long term plans for collimation in general and the LARP rotatable collimators in particular?  Is there still interest in hollow electron beam or crystal collimation? February 4, Eric Prebys - USLARP/CERN Meeting

February 4, Eric Prebys - USLARP/CERN Meeting

 Discussion: how important does CERN think this effort is (potentially large $$)? February 4, 2011 Eric Prebys - USLARP/CERN Meeting 19

 As agreed, LARP has submitted material for the PS2 white paper covering  E-cloud  Impedance  Space Charge  We have begun to transfer this expertise to the PSB energy upgrade effort  Because of budgetary constraints, other suggested contributions, such as IPM’s, had to be canceled.  Discussion: How much LARP presence is expected in the PSB effort?  Currently very little has been budgeted February 4, Eric Prebys - USLARP/CERN Meeting

 Important decisions at CC10  KEK crab cavity test in SPS canceled Still feel a test of some sort in SPS is required, but should be better thought out and more closely aligned with ultimate goals.  Adopt 400 MHz, compact, local scheme as base line unless proven unworkable.  Appear to be 3-4 potentially workable designs. LARP has supported SLAC and Jlab. May support new BNL concept.  Complete conceptual design of 800 MHz elliptical as a backup.  Discussion points  How is CERN proceeding with the long term plan?  What will LARP’s role be? February 4, Eric Prebys - USLARP/CERN Meeting

 Have come up with a new set of flat bunch (LPAS) parameters in view of the re-stated SLHC L peak goal (  5  cm -2 sec -1 ) & estimated bb tune shift (<0.02) from LHC data  Performed studies of large bunches in the PS, as well as emittance growth studies for various bunch spacings Bunch at 20ms before Ejection Aug. 6, 2010: ~3.7E11p/bunch February 4, Eric Prebys - USLARP/CERN Meeting

 Accelerator physics is one of the areas where LARP can make significant contributions to the LHC  This is because much of the scientific effort comes “for free” from the labs (although this is getting a bit tougher)  Is it CERN’s impression that we are using our resources as effectively as we can?  Electron cloud?  Beam beam?  Are there other areas where we can assist?  Collimation?  Crab cavity issues besides cavity design? February 4, Eric Prebys - USLARP/CERN Meeting

 LARP has joined with CERN and EuCARD for the design study for the high luminosity upgrade of the LHC.  The proposal was submitted in November,  Where do we go from here?  Major milestones?  Any follow up LARP involvement (beyond what’s been committed to)?  Any strategy for engaging US resources beyond LARP? There’s clearly significantly more interest in the US than LARP can support. February 4, Eric Prebys - USLARP/CERN Meeting

 We feel that LARP has made and continues to make valuable contributions to the LHC.  We want to work with CERN to use our (limited) resources as effectively as possible in the future.  We greatly appreciate the support and recognition that we’ve gotten from CERN  It doesn’t go unnoticed when LARP is mentioned in a CERN talk.  We also want to acknowledge the significant resources that have been provided by the labs outside of direct LARP funding.  I want to thank the following people who provided significant material for this talk:  Tom Markiewicz, Rama Calaga, John Fox, Chandra Bhatt, Sasha Valishev, Uli Wienands, Nikolai Mokhov, Alex Ratti, Alan Fisher, Ryoichi Miyamoto, et al February 4, 2011 Eric Prebys - USLARP/CERN Meeting 25

February 4, Eric Prebys - USLARP/CERN Meeting