LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM.

Slides:



Advertisements
Similar presentations
Chapter 20 Electricity.
Advertisements

6 th April 2010 MP3 weekly summary – issues and follow-up 0v1 M. Zerlauth for the MP3-CCC shift crew.
MP3 report – week 17 19/4/2010 – 25/04/ interventions MP3/QPS team in CCC Monday Morning Meeting : 26th of April 2010.
Frédérick BORDRY – LHCMAC 22- 6th December 2007 Review of the experience of LHC powering: short-circuit tests and sector 7-8 and start of powering sector.
RRR Measurements in S23 during LS1 Emmanuele Ravaioli Daniel Rasmussen Scott Rowan Thanks to Z. Charifoulline, R. Denz, J. Steckert, H. Thiesen, A. Verweij.
PIC configuration (maskable/unmaskable circuits) I. Romera MPP meeting –
ELECTRO THERMAL SIMULATIONS OF THE SHUNTED 13KA LHC INTERCONNECTIONS Daniel Molnar, Arjan Verweij and Erwin Bielert.
TE-MPE –TM, 16/05/2013, Mateusz Bednarek, TE/MPE-EE ELQA testing during and beyond LS1.
Proposal for measurements on RB.A81 on 1st September August 2010 Emmanuele Ravaioli Thanks to A. Verweij.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
MP3 report : W49 (6 slides, 6’) J.Ph Tock for the MP3 team Since oral report last week (24 th of November) 1JPhT – LMC 1st of December 2010.
First draft of the CLIQ test plan for the HQ2b magnet Emmanuele Ravaioli Thanks to Hugo Bajas & GianLuca Sabbi 02/05/2014.
CSCM Project Powering cycle and results of the PSpice simulations Emmanuele Ravaioli Thanks to H. Thiesen, A. Verweij TE-MPE-TM
LMC 30 LPC A. Verweij, TE-MPE. 30 Sept 2009, LMC meeting 1.9 K, 0 T, 7.5 kA run Heat pulse.
A. Verweij, TE-MPE. 3 Feb 2009, LHC Performance Workshop – Chamonix 2009 Arjan Verweij TE-MPE - joint stability - what was wrong with the ‘old’ bus-bar.
TE-MPE Workshop 14/12/2010, Manuel Dominguez, TE/MPE-EI 1 Stephen Pemberton, TE/MPE-EI RB Earth Spark Investigation Initial Report. S. Pemberton, G. D’Angelo.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
The diode lead resistance ‘issue’ A. Verweij, TE-MPE, CSCM workshop 7/10/2011 Contents:  Diode geometry  Measurements performed in the past  Measurements.
HFM High Field Model, EuCARD WP7 review, 20/1/2011, Philippe Fazilleau, 1/16 EuCARD-WP7-HFM Dipole Conceptual Review Nb 3 Sn dipole protection Philippe.
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Frequency Transfer Function Measurements during LS1 Emmanuele Ravaioli Thanks to Arjan Verweij, Zinur Charifoulline, Andrea Musso MPE-TM
Proposal for FTF measurements on dipole magnets in the tunnel during the Christmas break Emmanuele Ravaioli TE-MPE-TM
1 A. Verweij, TE-MPE. LHC Performance Workshop – Chamonix Feb 2010 Arjan Verweij TE-MPE - type of defects - FRESCA tests and validation of the code.
Training LHC Powering R. Denz Quench Protection System R. Denz AT-MEL.
MPE actions: update Third LHC Splice Review, November 12-14, 2012 Rüdiger Schmidt, TE-MPE reporting for ….. Circuit Documentation: S.Pemberton, K.Pereira.
MP3 recommendations from June 2013-Feb 2014 Arjan Verweij on behalf of the MP A. Verweij, LSC meeting 7/2/2014 One of the tasks of the MP3 is.
CSCM Project Status and Prospects Andrzej Siemko on behalf of the CSCM project core team: Mike Koratzinos, Jens Steckert, Hugues Thiessen and Arjan Verweij.
Upper limits for QPS thresholds for selected 600 A circuits B. Auchmann, D. Rasmussen, A. Verweij with kind help from J. Feuvrier, E. Garde, C. Gilloux,
Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project 1 st Workshop FTEC 2015 Alejandro Fernandez Navarro.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
Cold powering test results of MBHSP102 Gerard Willering, TE-MSC-TF With thanks to Jerome and Vincent and all others from TF for their contribution.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
1 A. Verweij, TE-MPE. LHC Performance Workshop – Chamonix Feb 2010 Arjan Verweij TE-MPE - type of defects - FRESCA tests and validation of the code.
FRESCA II dipole review, 28/ 03/2012, Ph. Fazilleau, M. Durante, 1/19 FRESCA II Dipole review March 28 th, CERN Magnet protection Protection studies.
LHC circuit modeling Meeting 2 March PSpice Electrical modeling of the various LHC circuits, as a tool to: Describe the ac behavior of magnets Better.
TE-MPE -EI 23/6/2011,Antonopoulou Evangelia RQS circuit Simulation results of Quench Antonopoulou Evangelia June 2011 Thanks to E. Ravaioli.
Advanced simulations of events in the RB circuit Short circuit to ground Quench of a dipole provoked by the quench heaters Emmanuele Ravaioli Thanks to.
HWC with nQPS Splice Monitoring Zinur Charifoulline & Bob Flora Real Time (~10 sec) BUS Voltage Energy Extraction Trip 300 µV threshold on Un-bypassed.
Machine Protection Review, R. Denz, 11-APR Introduction to Magnet Powering and Protection R. Denz, AT-MEL-PM.
Main dipole circuit simulations Behavior and performance analysis PSpice models Simulation results Comparison with QPS data Ongoing activities Emmanuele.
MPP Workshop Status of Powering Interlocks I. Romera on behalf of MPE-MS MPP Workshop, 12 June 2015, I. Romera (TE-MPE)1.
TE-MPE –EI, TE - MPE - TM 8/12/2011, Antonopoulou Evelina RQS circuit Simulation results Antonopoulou Evelina December 2011 Thanks to E. Ravaioli.
TE-MPE –EI, Circuit Modeling Meeting 4/8/2011, Antonopoulou Evangelia RQTL circuit First Simulation results Antonopoulou Evangelia August 2011 Thanks to.
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
Status of the models of the LHC superconducting circuits ( ) (Pspice, QSF-Simulink) Emmanuele Ravaioli Thanks to E. Antonopoulou, S. Rowan, M.A.
Study of the HTS Insert Quench Protection M. Sorbi and A. Stenvall 1 HFM-EuCARD, ESAC meeting, WP 7.4.1CEA Saclay 28 feb. 2013,
CHATS-AS 2011clam1 Integrated analysis of quench propagation in a system of magnetically coupled solenoids CHATS-AS 2011 Claudio Marinucci, Luca Bottura,
09/05/ Modelling and testing of circuit protection of new superconducting magnets for the HL-LHC project 2 nd Workshop of the Spanish Traineeship.
CSCM Test description and Risk assessment  Goal  The typical and ultimate current cycle  Test sequence for type test and regular test  Risk assessment.
RB and RQ shunted BusBar current carrying capacities
Frequency Transfer Function of a dipole What is it Why is it important How to calculate it How to model it How to measure it Emmanuele Ravaioli LHC-CM.
Status of RB circuit modeling PSpice models Simulation results: nQPS & oQPS Comparison with QPS data Ongoing activities Emmanuele Ravaioli TE-MPE-TM
LHC Interconnect Simulations and FRESCA Results
12 October 2009 RRB Plenary R.-D. Heuer
Quench protection of the MAGIX high-order correctors
Powering the LHC Magnets
Update on circuit protection simulations of the HL-LHC Inner Triplet circuit Matthias Mentink, Circuit specifics + STEAM simulations: Samer Yammine, LEDET.
Dipole circuit & diode functioning
Quench Protection Measurements & Analysis
Using the code QP3 to calculate quench thresholds for the MB
Andrzej Siemko (CERN) and Marco Zanetti (MIT)
MQY as Q5 in the HL LHC era Glyn Kirby MQY 001 bat 927.
Quench calculations of the CBM magnet
AC current.
Simulations of failure cases 1st STEAM Workshop June 2019
Other arguments to train two sectors to 7 TeV
On behalf of the STEAM team
BBQ (BusBar Quench) 1st STEAM Workshop June 2019
Presentation transcript:

LHC circuit modeling Goal: Create a library of electrical models and results for each circuit Useful and usable for the next 20 years…… Web site cern.ch/LHC-CM

Our tools: PSpice Comsol QP3

LHC circuit modeling, using PSpice Describe and understand the electrical behaviour of a circuit, during ramp, plateau, fast discharge, and quench. Observe/detect anomalous behavior of a circuit in the machine, and understand the reason for this anomalous behavior. Improve the functioning of a circuit (if needed) Understand the coupling between circuits “What if …” simulations (for example: simulations of a short between bus and ground, or between two circuits)

TypeCircuitNr of circuits I_maxConverterMagnetNr of magnets RB RPTEMB154 RQ RQD RQF RPHEMQ47 / 51 RQX RPHFC+RPHGC+ RPMBC 2xMQXA+ 2xMQXB 4 IPD RD RPHFMBX1 RD RPHGBMBRC1 RD RPHFDMBRS2 RD RPHFDMBRB1 ! ! W W W Circuit is “in work” ! Circuit has high priority

TypeCircuitNr of circuits I_maxConverterMagnetNr of magnets IPQ RQ xRPHHMQY2 RQ xRPHGBMQML2 RQ xRPHGBMQML2 RQ xRPHGB2xMQM+2xMQML4 RQ xRPHGAMQM4 RQ xRPHGAMQML2 RQ xRPHGA2xMQM+2xMQMC4 RQ xRPHGAMQML2 ! ! W

TypeCircuit# of c.I_maxConverterMagnet# of m.EE 600 A RCD RPMBBMCD76 / 77EE RCS RPMBBMCS153 / 154EE ROD & ROF RPMBBMO8 / 11 / 13EE RQ6 8490RPMBBMQTLH6EE RQS 17600RPMBAMQS2No EE RQS 7600RPMBAMQS4EE RQT64600RPMBAMQT1No EE RQTD and RQTF32600RPMBBMQT8EE RQTL64600RPMBAMQTLI1EE RSD and RSF RPMBBMS9 / 10 / 11 / 12EE RSS15600RPMBBMSS4EE RCBXH24600RPMBBMCBXH1No EE RCBXV24600RPMBBMCBXV1No EE RQSX38600RPMBBMQSX1No EE RU2500RPMBBMU1EE ! )) W ! ! !

TypeCircuit# of c.I_maxConverterMagnet# of m A RCO 16110RPLBMCO77 RCBCH / 86RPLBMCBCH1 RCBCV / 86RPLBMCBCV1 RCOSX3 8110RPLBMCOSX1 RCOX3 8110RPLBMCOX1 RCSSX3 8110RPLBMCSSX1 RCSX38110RPLBMCSX1 RCTX38110RPLBMCTX1 RCBYH3877RPLBMCBYH1 RCBYV 3877RPLBMCBYV1 60 A RCBH 3761RPLAMCBH1 RCBV 3761RPLAMCBV1 )) )) )) W

Step 1: General model including current leads, power supplies (incl. crowbars, thyristors, …), ground connections, Energy Extraction (switch and dump). The magnet is modeled by a simple inductance and R=0 (with R par if present). Step 2a: If needed, replace L magnet by a more realistic L-R-C circuit based on spectrum analysis, or based on PM data from the machine. This is definitely needed for the MB’s and MQ’s with probably a current dependent L-R-C. Step 2b: Include the R(I,t) for a quenching magnet. Step 3: Validate the model as much as possible, using PM data from the machine, and data from B4, SM-18 etc. (Step 4): Combine models for mutual interaction.

Resources and Priorities for PSpice work in 2011 Manuel Dominguez Emmanuele Ravaioli Evangelina Antonopoulou Ongoing: RCBY circuit including R-L-C model of MCBY, and tests in spare magnets R-L-C model of MB and MQ at various currents (0-12 kA) RB circuit (emphasis on unbalanced aperture voltages, new snubbers, switch opening, frequency of converter ringing, R-L-C model of MB) Finalise RQ and RQ4 circuits RQS circuit 1 st priority other circuits: IT, RD2, RQ6 or RQ9, one 600 A circuit with high L and EE

Thermo-electrodynamic calculations, using Comsol and QP3 Quench behaviour (‘Hot spot’, propagation, …) Detailed stability analysis of joints and other circuit singularities Analysis of the future 13 kA shunt (for RB and RQ) Set/adapt QPS threshold values Set/ adapt BLM quench thresholds, and analyse beam-induced quenches

For each circuit at various currents (using QP3): T hot for quench starting in bus (with and without cooling). T hot for quench starting in magnet (adiabatic, peak field and average field, without inter-turn propagation). T hot and R(t) for quench starting in magnet (most realistic case for ‘critical’ circuits, possibly using Roxie). Typical propagation dV/dt at start of quench for different parts of the circuit. On request from Splices Task Force or others (using QP3, Comsol): Detailed analysis of singularities, e.g.: a badly cooled bus segment in-between 2 well-cooled segments. excessive joint resistance in a bus internal splice resistance in a coil defective 13 kA joint

Example of a singularity: plug 1.9 K 4.5 K Conductor 1: - cross-section - Cu/SC - RRR - insulation Conductor 2: - cross-section - Cu/SC - RRR - insulation L1L1 L3L3 L2L2 R splice Insulation

Ongoing Comsol work Daniel Molnar 3D models of non-shunted and shunted 13 kA RB and RQ joints (incl. different types of shunt, effect of non-uniform soldering, and setting of QC criteria). Mutual validation of Comsol and QP3. (Possible test in SM18 on adiabatic shunted RB joint) Ongoing QP3 work Arjan Quench propagation test in S56 during technical stop next week, and possibly others CSCM (aka ‘Thermal amplifier’) Adaptation the QPS threshold on the RQTD/F circuits BLM quench thresholds (to be partially transferred to BE-BI) Analysis of ‘wire scanner’ induced quenches. Manual + updates of the code

Foreseen library contents for each circuit:  Electrical description of the circuit, and the PSpice model (including converter, EE, QPS signals, earth connection, current leads, etc).  Description of the conductors in the bus and magnet (including insulation, splice configuration etc)  Response to a Fast Power Abort (during ramp and plateau, in some cases with quench back)  Response to a quench  Field map of a magnet (input from MSC group)  Simulated V(t) at start of a quench in bus and magnet for various currents  Simulated hot spot temperatures in bus, joint and magnet for various currents and conditions (adiabatic, 1.9/4.5 K, etc). For the moment not foreseen to include the current leads Priorities and resources of PSpice, Comsol and QP3 work may change due to issues coming up during machine operation