©Vaisala | date | Ref. code | Page 1 OFCM Meeting VAISALA OFCM PRESENTATION 6/15/05 Scott Sternberg Van Weaver.

Slides:



Advertisements
Similar presentations
Purchasing Chapter 23.
Advertisements

SUPPLY CHAIN INTEGRATION WITH SUPPLIERS. INCAP SYSTEM We introduce the new INCAP SYSTEM, developed by AMBIENTUM and ROS ROCA, wich is the way used for.
The Evolution of NWS Aviation Weather Services in Chicago Mike Bardou National Weather Service Chicago The views expressed in this presentation are those.
Jeff Wallbank KPSN Partnership Development Manager How will the PSN change the shape of the Public Sector and the ways in which it delivers services.
Figures in Chapter 1. Learning objectives After studying this chapter, you should be able to; Define logistics and supply chain management. Describe logistics.
Gathering, Researching, and Drafting Specifications Dee Dorsey Ron Pigott.
VicConnect for Victorian Local Government Version August, 2014.
Mechanics of Futures Markets
Airport Owner’s Guide to Project Delivery Systems Prepared by: The Joint Committee of ACI-NA, ACC and AGC.
Procserve Benefits of eCommerce © Procserve Holdings Limited. All rights reserved.
Sustainable Funding and Contracting with the Not-For-Profit Sector Rebecca Brown Department of the Premier and Cabinet 18 May
Enterprise Content Management Pre-Proposal Conference for RFP No. ISD2006ECM-SS December 6, 2006 California Administrative Office of the Courts Information.
Effective Date of Free or Reduced Price Meal Eligibility Determinations SP
Purchasing Overview Purchasing Purchasing Activity
Southampton City Council Energy Procurement Changes Seminar 2 nd October 2014.
1 Federal Aviation Administration Mid Term Architecture Briefing and NextGen Implementation 1 Federal Aviation Administration Mid Term Architecture Briefing.
PROCURING APPRAISALS. Best Value Approach Mr Edward Biggers Dr. Pauline Tonsil.
Health Center Library Overview Evelyn Morgen, Director March 2007.
SDLC Phase 2: Selection Dania Bilal IS 582 Spring 2009.
MASTERING THE RFQ PROCESS Genanne Wilson, DJJStu Potlock, DMS Gina Gibson, STOBill Zimmerman, DOHVonnie Allen, AWI Department of Management Services Division.
Openings, Closings, and Mergers Tutorial I 2013 Schools and Libraries Fall Applicant Trainings 1 Openings, Closings, and Mergers Tutorial Fall 2013 Applicant.
The BIM Project Execution Planning Procedure
Federal Acquisition Service U.S. General Services Administration Linda Hosey Customer Service Director
ACE, ECCE & EFCA SEMINAR 21 October 2004 New EU Public Procurement Directive: EUROPEAN HARMONISATION OF PROCUREMENT PRACTICES IN THE SECTOR OF THE ENGINEERING.
Presented to: Aerospace Control and Guidance Systems Committee By: Stan Pszczolkowski, Manager, System Analysis Division Date: March 1, 2006 Federal Aviation.
Oxfordshire Clinical Commissioning Group Contracting to support integration for mental health and older people Oxfordshire CCG’s approach to contracting.
MyFloridaMarketPlace Roundtable July 16, 2003 MyFloridaMarketPlace.
Supply Chain ERP: Vendor Training Change is coming …. Change is Here!!!!!!!!!!
Kimball Bullington, Ph.D. - MGMT Materials Management Systems Purchasing Chapter 7.
Purchasing Director’s Meeting MFMP 2.0 Upgrade Status February 15, 2007.
CHAPTER 2 Supply Chain Management. SCM (CSCMP Definition) The integration of key business processes from end user through original suppliers, that provides.
Energy Huntsville Opportunity Report November 2012 Steve Reed
National ITS Architecture Deployment Support and FHWA Resources.
Page 1 April 1, 2003 Langley Research Center Contractor Forum_040103_Final.ppt LaRC Core Financial Project Contractor Forum Yvonne Dellapenta LaRC Core.
PROCURE TO PAY 25 SEPT 2014 Project Symphony. 2 Procure to Pay Thursday Sept 25 8:00 – 8:15am: Introduction & Recap of 2 nd day 8:15 – 9:45am Purchase.
SOA in Transformational Government Using SOA to change thinking Steve Jones Head of SOA Global Outsourcing, Capgemini.
Purchasing & Procurement Process 3. Title I Director completes the Payment. Invoices are received from the vendor(s). Payment Vouchers are attached to.
CHAPTER 2 Supply Chain Management. Copyright © 2001 by The McGraw-Hill Companies, Inc. All rights reserved.McGraw-Hill/Irwin 2-2 Supply Chain Management.
MyFloridaMarketPlace MyFloridaMarketPlace User Meeting July 20, 2004.
Chapter 20 Strategy in Purchasing and Supply Management.
INTEGRATION PROCESS IMPLEMENTATION & TIMELINE BY FUNCTIONAL AREA.
The Evolution of NWS Aviation Weather Services in Chicago Mike Bardou National Weather Service Chicago.
National Managed Voice Network Service Project
Systems Engineering “Understanding Where it Fits in Your Agency” a session in fhwa’s Systems Engineering t3 series aug. 02, 2007.
P5 Work Package 5 - Dissemination (WP5) Overall responsibility to ensure the timely achievement of the targets and deliverables for this WP – page 19.
1 Joint Action Group for Lightning Detection Systems Date/Time: 12 March 2008/1:00-4:30pm EST Cochairs: Mr. Sergio Marsh, NWS Mr. Dino Rovito, FAA Exec.
Project Management Birutė Markevičiūtė Joint Technical Secretariat Lead Partner Seminar 13 October 2008, Riga.
2015 NetSymm Overview NETSYMM OVERVIEW December
…to integration Information and advice: A single point of access that filters enquiries using a single source of information (the ‘local offer’) as soon.
System Selection Dania Bilal IS 582 Spring System Selection Business Selection of system project to develop or enhance Libraries & other information.
Phoenix Technology Solutions Products At the highest level, the products offered by Phoenix Technology Solutions are: IT Project/Programme Management.
CS223: Software Engineering Lecture 16: The Agile Methodology.
Engineering H193 - Team Project Gateway Engineering Education Coalition P. 1 Spring Quarter Last Day of Class – Spring Quarter Check Grades Turn in Project.
Information systems for Arid Regions NASA Arab Water Council Collaboration.
This Presentation Has Been Pre-Recorded To listen to the webinar presentation, click “webinar” link on
State of Indiana Road Salt Bid Winter Season Nicole Kenney, Director of Strategic Sourcing Chad Johnson, Strategic Sourcing Analyst March 21,
Food Purchasing for Child Care National Food Service Management Institute The University of Mississippi
Multiplication Find the missing value x __ = 32.
1 1 The FAA's ECSS Acquisition — An Innovative Approach to Procuring Enterprise-Wide Support Services Breakout Session # 782 Scott M. Bukovec Senior Contracting.
PROCUREMENT 101 Texas Woman’s University. Procurement Process Overview Department determines need and where to purchase Requisition created Requisition.
MGT 350 Week 1 DQ 2 What are the steps in the University of Phoenix decision-making model? Which step in the University of Phoenix decision- making model.
MGT 350 Week 4 DQ 2 What are the steps for effective management of a decision implementation plan? How should managers monitor the progress of decision.
MGT 431 Week 3 Learning Team Development and Training Paper To purchase this material click below link
Food Suppliers Implementation of EDI &PAV March 2010
The Concepts of Selection and Procurement
XRN4770 – NDM Sample Data – Modification 0654 delivery – Amended file format ChMC – 9th January 2019.
Purchasing cycle Purchase request
Source Selection Training
Purchasing Overview Purchasing Purchasing Activity
Presentation transcript:

©Vaisala | date | Ref. code | Page 1 OFCM Meeting VAISALA OFCM PRESENTATION 6/15/05 Scott Sternberg Van Weaver

©Vaisala | date | Ref. code | Page 2 DATA FORMATS AND DELIVERY Vaisala should be able to deliver multiple data formats. The formats need to either defined across all agencies or by each individual agency. The key to this initiative is providing technical contacts for our network engineers to work with. For both technical and commercial considerations alternatives to centralized data delivery should be implemented.

©Vaisala | date | Ref. code | Page 3 PacNet vs Long Range Data Where we are today: The existing procurement contract includes the Long Range (LR) data, but does not include PacNet (priced as a separate line item) We currently deliver LR+PacNet data to the Gateway over the x25 link, as a continuation of the “Evaluation Period” for the AWC PacNet included for no additional cost Clinton Wallace/AWC have expressed ongoing interest in PacNet

©Vaisala | date | Ref. code | Page 4 PacNet Data from one week ago

©Vaisala | date | Ref. code | Page 5 PacNet Data Where we need to go in the near future: Confirm Government intention on purchasing PacNet data If decision is to not to purchase – Set date for disconnection of data – Inform AWC – Vaisala stops PacNet data delivery – AWC terminates IR:Ltg product delivery If decision is to purchase – Make arrangements for integrated data delivery – Collaborate on data formatting and delivery issues

©Vaisala | date | Ref. code | Page 6 CONTRACT ISSUES - MISSING DELIVERY ORDERS 10/1/04 - 1/12/05 ALDARS (AWOS) $64, Maritime $16, Avia Wx Ctr $ FAA ARTCC Comm $5, Volpe $1, NASA Johnson $4, NASA Marshall $1, BLM $83, These delivery orders and outstanding invoices must be paid by 6/30/05.

©Vaisala | date | Ref. code | Page 7 CONTRACT ISSUES - OUTSTANDING DELIVERY ORDERS FAA BLM NASA To maintain service these delivery orders must be received no later than 6/30/05.