8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under 0.024 kW.

Slides:



Advertisements
Similar presentations
Status of PMD DCS. PMD Layout Unit Module Super Module Converter + Support Plate Total channels Preshower+Veto = 221,184 8 Supermodules in 2 planes 48.
Advertisements

Questionnaire Response
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
Il sistema di HV del sottorivelatore DT S. Braibant, P. Giacomelli, M. Giunta, E. Borsato Bologna, 20/01/2007.
HV Report F.Cavallari (INFN Roma). High Voltage set-up in M0’ 2 channels each driving 50 crystals (100 APDs) 1 Crate hosting 1 board (final system). 1.
A3016 and MAO test at CAEN Pigi, A. Boaino & CAEN.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
Recently Report LIU Qian. Putting the common end into the moon box We removed this surface of rack when we were installing the common end. We didn’t move.
8/11/2006 FPIX TB meeting L. Perera 1 Pixel Power Supply Response Measurement Lalith Perera - Univ. of Iowa Carlos Florez, Simon Kwan, Charles Newsom,
1 CALO DCS power supply status CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  Introduction  Power supply description with hardware.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
1 TPC online  offline calibration November 2002.
Upgrade news and Proposed interventions during YETS for the Muon Barrel Alignment Szillási Zoltán, Béni Noémi (ATOMKI ) This project is supported by Hungarian.
DCS planning for ITS/SDD Vojtech Petracek Jiri Kral CTU Prague DCS workshop CERN.
MDT PS DCS for ATLAS Eleni Mountricha
Electrical and Optical Cables Installation at P5 What When How H. Breuker
LV and HV status of the RPC system RPC detector and trigger group.
Low Voltage LB status RPC detector and trigger group.
LKr Calorimeter Control and monitoring R. Fantechi 19/02/2010 R. Fantechi.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
1 Low Voltage Power Supply Specification DCS Workshop 8 Sept 03 L.Jirden.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
P. Paolucci - I.N.F.N. di Napoli 1 MTCC meeting May 06 HV & LV status DELIVERED AT BLG /60  67% of the A3009 (LV) 6/40  15% A3512N (HV) 10/10 
Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling on YB Fabio Montecassiano INFN PH/CMM.
Alex Madorsky University of Florida/Physics Track Finder production readiness review, Rice, August 2004 Track Finder Crate, Backplane and Parts Alex Madorsky.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
r1Fabio Montecassiano INFN PD & CERN PH/CMM1 Status of cabling YB+2 and YB+1, extension to minus wheels and YB0, cables between UXC55 and USC55.
E.Guschin (INR,Moscow) 17 July 2007 CALO commissioning group meeting CERN Status of PS/SPD LED system.
John Coughlan Tracker Week October FED Status Production Status Acceptance Testing.
Low Voltage Workshop, CMS Electronics Week CERN, 8 June 2010 W. Lustermann, ETH Zurich EB + EE LV systemOPFC MonitoringEB HV systemEE HV system.
21-Jan-2009CSC - ESSC Jan'091 Report on CSC for ESSC Prepared for CSC by Fred Borcherding FNAL.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
Electronic Report Pigi. HV-LV-ADC status Sometimes “repaired boards” are not working properly and so I would like to propose you to: – Test and qualify.
DT Shifter Training Infrastructure A. Benvenuti, M.Giunta 07/07/2010.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
RPC Trigger Electronics Review Subjects: Link System Low Voltage Link System Upgrade Krzysztof Doroba, University of Warsaw Krzysztof Doroba, RPC TRigger.
P. Paolucci - I.N.F.N. of Napoli 1 RPC workshop, 2 march 07 RPC Power system P. Paolucci, G. Polese and D. Lomidze I.N.F.N. di Napoli.
ATLAS DCS ELMB PRR, CERN, March 2002Fernando Varela ELMB Networks CAN/CANopen Interoperability of the ELMB Usage of the ELMB in ATLAS ELMB Networks Full.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting EASY Crate board/cratechannel/crate (max power) power/crate# crate/rackpower/rack#
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
13-Mar-061 ACORDE DCS ACORDE GROUP CINVESTAV, ICN-UNAM, MICHOACAN. PUEBLA México.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
7-Nov-08ESSC Nov 2008 > CSC Early Upgrades by Fred B. 1 CSC Early Upgrades Current plans for "early upgrades" and maintenance during 2009 and 2010 Description:
RRB scrutiny Report: Muons. Internal scrutiny group for RRB report Internal scrutiny group composition – J. Shank, G. Mikenberg, F. Taylor, H. Kroha,
Geneva CMS Week, RPC Operation Review Anton Dimitrov RPC Detector Review Hardware Status and New Technical Procedures.
Cables Ian Crotty 8 May 2012 Cables for the RE4 Upscope in CMS News. The HV cables are in the Integration DB (INB/904) The Hv order is confirmed. Need.
J. Valls, CMS L2-L3 Meeting, Sept ROD Production at CERN  ROD Flow During Production  ROD Flow at CERN  ROD Testing Areas  Infrastructure  Equipment.
DCS meeting - CERN June 17, 2002V.Kouchpil SDD DCS status Low Voltage system End-ladder ASIC High Voltage system Cooling system Schedule.
1 hcal installation and commissioning status pawel de barbaro, vitali smirnov, june 11, 2007.
Faculty of Physics, University of Belgrade Collaboration board meeting 31 th of January, ToF-L/R detector HV upgrade Jovan Puzović, Faculty of Physics,
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
TRT HV System status and plans for LS1 LPI Moscow, K. Zhukov.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
Power consumption (Watts) LBB27 ROS18 TSC50 TIM8 1 SC crate416 Alignment20 TOTAL per rack906~1 kW X2J22X2J02 With a water flow of 10 l/min, it should.
PIXEL CAEN Installation Status
Cables for the RE4 Upscope in CMS
ProtoDUNE - SP SLOW CONTROLS MEETING 11/11/2016 CERN – EP/DT
LKr status R. Fantechi.
LV-workshop during CMS Electronics week
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
DCS: Temperature Probes
DCS: Temperature Probes
Electronics for RPC Upscope
Pierluigi Paolucci - I.N.F.N. Naples
Track Finder Crate, Backplane and Parts
Dr. Pierluigi Paolucci - INFN di Napoli
CSC Hot Spares LV Modules (24 units needed) HV Modules Custom Modules
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

8-May-2010 LV Workshop1 Alignment LV: quick’n dirty HW review Alignment uses CAEN low voltage –No HV –Low power consumption electronics: under kW per crate 1xSY1527LC MainFrame and 2xA1676A + 1 spare branch controllers –In S4F03 2xA spare 48 V AC/DC converters and 2xEasy3000 Crates + 2 spares –In YE±1 28xA3006 LVPS + 3 spares –In YE±1 alignment EasyCrates –In YB±2, YB0 DT EasyCrates We use DT AC/DC, MF and Branch Controllers

8-May-2010 LV Workshop2 LV for Alignment: issues Currently: –1 failure during operation A3006 (sn47) in CMS buffer zone needs repair –Failures of MAB Custom Boards LV related? Not sure, under investigation. Maybe ramp-up voltage “sticks” for a while on a V, CB boot loader goes mad and tries to rewrite the CB firmware. This has been corrected on 30 CBs (except on positive side of YB0 where the last problem has happened two weeks ago. All other CBs work well) In the past: –10 A3006 modules have needed some repair That’s 10 out of 30 !! A3006s are “new” designs Much more stable during last 12 months (only 1 failure)

8-May-2010 LV Workshop3 LV for Alignment: CAEN support All repairs have been through CERN Pool BEFORE CMS buffer zone –10 modules sent for repair –Turn-around time ~2 months –Two modules needed a second CAEN repair –Availability was good –We expect a continued maintenance support Now –1 module in CMS buffer zone –CAEN availability and turn around time not expected to change –Not enough experience yet

8-May-2010 LV Workshop4 LV for Alignment: Anderson connectors PP75 connectors only in the 2 AC/DCs –We do not regularly monitor the temperature But it is displayed PVSS LV project –We do not have retaining brackets (I think) –We have not changed to flexible cables as far as I know LVPS use PP15 connectors –Channel temperatures can be read in PVSS LV project –Connectors have a screw-based retainer Fuses –None directly fed by MAOs –All inside electronic boards Turn-off issues –None –If service power fails, our modules go off

8-May-2010 LV Workshop5 LV for Alignment: resources LV system –Xiaofeng Yang: endcap –Noemi Beni/Zoltan Szillasi: barrel –Javier Gonzalez: link and general HV system –does not apply Interface with DCS –Javier Gonzalez: main interface –Xiaofeng/Noemi: occasional contact Away from CERN: –Javier Gonzalez is based at IFCA, Spain

8-May-2010 LV Workshop6 LV for Alignment: maintenance Repairs –Done by CAEN through CERN POOL Records –Kept by Gervasio Gómez in an excel spread sheet Which is kept updated and put online –This is our repair history as well Tests –Performed at alignment LV rack in Bât. 904 –Test results also recorded

8-May-2010 LV Workshop7 LV for Alignment: interlocks Link –Power cards at each crate provides interface between CAEN LVPS and electronics –Additional fuse protection at each electronic card –Expert: Antonio Molinero (CIEMAT, Madrid) Endcap –No interlocks –Fuse protection of all electronic boards But most are hard to access in case of failure –Expert: Xiaofeng Yang (at CERN) Barrel –No interlocks –Expert: Zoltan Szillasi (at CERN)