SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review.

Slides:



Advertisements
Similar presentations
Vibration Isolation Group R. Takahashi (ICRR)Chief T. Uchiyama (ICRR)Payload design H. Ishizaki (NAOJ)Prototype test R. DeSalvo (Caltech)SAS design A.
Advertisements

Cascina, January 25th, Coupling of the IMC length noise into the recombined ITF output Raffaele Flaminio EGO and CNRS/IN2P3 Summary - Recombined.
Andrea Paoli AdV 1 st Project Review Cascina, November 3 rd, 2008 IME – infrastructure modifications for environmental noise reduction.
Takanori Sekiguchi Italy-Japan Workshop (19 April, 2013) Inverted Pendulum Control for KAGRA Seismic Attenuation System 1 D2, Institute for Cosmic Ray.
April 27th, 2006 Paola Puppo – INFN Roma ILIAS Cryogenic payloads and cooling systems (towards a third generation interferometer) part II: the Vibration.
Payload design methods versus modeling E. Majorana.
Seismic attenuation chains concept, design and advancement status Riccardo DeSalvo for the KAGRA Seismic group JGW-G September 10, 20121JGW-G
1 Virgo commissioning status M.Barsuglia LAL Orsay.
LCGT seismic Attenuation System DRADF DRAFT DRAFT DRAFT.
F. Frasconi I.N.F.N. Pisa for the Virgo Collaboration TAUP2007 Sendai, September 11-15, 2007 VIRGO EXPERIMENT VIRGO: a large interferometer for Gravitational.
Suspended Mirror control: Learning through Virgo Experience E. Majorana - I.N.F.N. Pisa Aspen GWAD February 16, 2004.
rd ILIAS-GW annual general meeting 1 VIRGO Commissioning progress J. Marque (EGO)
Present Superatttenuator performance vs. AdV & ET Requirements S.Braccini for Virgo Suspension group.
September 8, 2015 THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER THE MONOLITHIC SUSPENSION STATUS FOR THE VIRGO INTERFEROMETER Helios Vocca.
EMDM Monolithic suspension development Activity plan Piero Rapagnani Detector meeting
Virgo Control Noise Reduction
1 Ist Virgo+ review Cascina H. Heitmann Alignment: Virgo+ changes.
22nd March 2005 LIGO-G R Passive attenuation for the LIGO Output mode cleaner; HAM SAS R. DeSalvo, S. Marka, V. Sannibale, A. Takamori, C. Torrie,
Thoughts on short term improvements for Mirror Suspension Control G.Losurdo - P.Ruggi.
Prototype Test of Vibration Isolation System Current Status & Schedule
Interferometer Control Matt Evans …talk mostly taken from…
March 17, 2008LSC-Virgo meeting1/12 Virgo Status B. Mours.
Design study for ET 3rd generation Gravitational Wave Interferometer Work Package 2 Suspension, Thermal noise and Cryogenics Piero Rapagnani
1 1.ISC scope and activities 2.Initial Virgo status 3.Design requirements 4.Reference solution and design status 5.Plans toward completion 6.Technical.
Virgo Commissioning update Gabriele Vajente for the Virgo Collaboration LSC/VIRGO Meeting – MIT 2007, July LIGO-G Z.
ILIAS – WG1 Hierarchical suspension control G.Losurdo INFN Firenze.
MSC recent activities Commissioning Cascina 2 Apr 2007.
Experimental tests of SA simulation Irene Fiori – Simulation Workshop – March 18, 2004 Virgo dataSiesta simulation 1. Inertial Damping simulation  test.
Seismic Attenuation System (SAS) for LCGT Inverted pendulum: 30mHz 3 cascaded GAS filter: 500mHz Test mass suspension: triple pendulum Transfer functions.
Takanori Sekiguchi External Review Control and tuning of suspension 1 T. Sekiguchi KAGRA 4th External Review.
SUSPENSIONS Pisa S.Braccini C.Bradaschia R.Cavalieri G.Cella V.Dattilo A.Di Virgilio F.Fidecaro F.Frasconi A.Gennai G.Gennaro A.Giazotto L.Holloway F.Paoletti.
1 Virgo Commissioning progress ILIAS, Nov 13 th 2006 Matteo Barsuglia on behalf of the Commissioning Team.
Minimizing the Resonant Frequency of MGAS Springs for Seismic Attenuation System in Low Frequency Gravitational Waves Interferometers Maddalena Mantovani,
SUSPENSION Performance vs. Specs PASSIVE ATTENUATION IN BAND: OK for AdV MIRROR HOR. SWING DAMPING “IN VELOCITY”: Ok for Locking in Adv MIRROR HOR. SWING.
Behavior of an inverted pendulum in the Kamioka mine R. Takahashi (NAOJ), A. Takamori (ERI), E. Majorana (INFN) GWADW 2010 We are investigating behavior.
1 The Virgo noise budget Romain Gouaty For the Virgo collaboration GWADW 2006, Isola d’Elba.
STREGA-C3 Cryogenic Seismic Isolation Roberto Passaquieti Dipartimento di Fisica “E. Fermi” Università di Pisa INFN sezione di Pisa ILIAS-GW Annual General.
Nov 3, 2008 Detection System for AdV 1/8 Detection (DET) Subsystem for AdV  Main tasks and requirements for the subsystem  DC readout  Design for: the.
New in-air seismic attenuation system for the next generation gravitational wave detector M.R. Blom, A. Bertolini, E. Hennes, A. Schimmel, H.J. Bulten,
LIGO-G Z The Status of VIRGO E. Tournefier for the Virgo Collaboration GWADW 2004, Aspen From the CITF to VIRGO Commissioning of the Fabry-Perot.
1 PAY Review Meeting 1 18/3/2009 Piero Rapagnani 18/03/2009.
The VIRGO Suspensions Control System Alberto Gennai The VIRGO Collaboration.
MSC winter, short-term schedule Commissioning meeting Cascina 2 Oct 2006.
The control of the Virgo Superattenuator: present and future Giovanni Losurdo - INFN Firenze/Urbino on behalf of the Virgo Collaboration.
Paolo La Penna ILIAS N5-WP1 meeting Commissioning Progress Hannover, July 2004 VIRGO commissioning progress report.
Dangers of controls from the cryogenic links. The LCGT-SAS Seismic Attenuation System i-LCGT is a modern, simplified and improved version of the Virgo.
Status of Virgo GWDAW12 Status of Virgo GWDAW Dec Leone B. Bosi INFN and University of Perugia (Italy) On behalf of the Virgo Collaboration.
Advanced Advanced Virgo BASELINE DESIGN advanced Giovanni Losurdo – INFN Firenze Advanced Virgo Coordinator for the Virgo Collaboration.
Advanced Coll. Meeting – Cascina, Sept 11th, 2007 G.Losurdo – INFN Firenze/Urbino 1 SUPERATTENUATOR - IP BASELINE: VIRGO DESIGN with STIFFER IP LEGS TILTMETER.
10-meter Interferometer Results M. Woods (special thanks to Steve Myers and Tim Slaton) Jan. 31, 2000 Commissioning Setup System Noise Monte Carlo simulation.
New Coil Drivers Time Line Alberto Gennai I.N.F.N. Pisa.
Filter #7 control April 18, 2016 –, Cascina Paolo Ruggi.
1 Advanced Virgo Monolithic Payloads P.Rapagnani Thermal Noise Workshop 2012_02_24-25.
VIRGO Second part. Advanced VIRGO and the INFN VIRGO activity in 2010 Fulvio Ricci
Advanced SA Specifications & Scientific Motivations S.Braccini, Cascina 21 Settembre 2007.
Paola Puppo INFN – Rome Thermal Noise Meeting – “Sapienza”-Rome - February 26 th 2008.
VIRGO Superattenuator performance and its evolution in the SAFE Project F. Frasconi – INFN Pisa (ET-WP2 Workshop – Roma – February 27, 2009)
Last stage SA F7 monitor/control
Type-A SAS Local Control Simulation (Current Status)
VIRGO–KAGRA Meeting about bottom filter damping
LCGT Seismic Attenuation System LCGT-SAS
Present Superattenuator performance vs. ET Requirements S
Status of Virgo GWDAW Dec 13-16
Advanced VIRGO Experiment
Control of the KAGRA Cryogenic Vibration Isolation System
Superattenuator for LF and HF interferometers
The Superattenuator upgrades and the SAFE Project
The views of Virgo collaboration groups on upgraded/advanced Virgo
Status at the Prague meeting
weekly meeting Cascina 28 Nov 2006
Presentation transcript:

SAT Plans for System R&D Signal Recycling Construction and A&I Short Suspension Upgrade Roberto Passaquieti Università di Pisa and INFN-Pisa AdV Review – Cascina, Nov. 3rd, 2008

AdV Review - November 3rd, The Virgo Superattenuator VIRGO Thermal Noise Filter Zero Standard Filters Inverted Pendulum Filter Seven Payload: Marionette Ref. Mass Mirror GROUND

AdV Review - November 3rd, SA Passive Attenuation Vertical Horizontal VIRGO Thermal Noise Measured Upper Limit

AdV Review - November 3rd, SA Passive Performance vs AdV VERTICAL HORIZONTAL 6 x m Hz -1/2 Upper limits of residual seismic vibrations along the beam are close to the VIRGO thermal noise Final systematic check in VIRGO +

AdV Review - November 3rd, Payload Swing Ground Seismic Noise Residual Mirror Seismic Noise Inertial Damping

AdV Review - November 3rd, Swing induced by resonances < 0.1  m Inertial Damping ADCDSPDAC Coil-Magnet actuators Acceleromters LVDT Ground Frame

AdV Review - November 3rd, Payload Swing Reduction Performance  Wide payload swing during windy days, when seismic noise below 200 mHZ is dominated by ground tilt  Too large correction dynamics for AdV requirements WIND SEA MARIONETTA CORRECTION  For principle reasons the ACC can not distinguish tilt affecting ID  A sensitive tilt-meter (≈ rad/ Hz 1/2 at ≈ 30 mHz) would be important  As demonstrated during VRS1 payload swing is ok during normal conditions but..

AdV Review - November 3rd, Present Marionette and Ref. Mass DAC Noise  Reference mass actuator noise is compliant with AdV AdV VIRGO  Marionette actuator noise has to be reduced for AdV by about a factor 10 in the Hz region (SAT R&D)

AdV Review - November 3rd, Marionette Actuation Range Optimization Calm Any  Marionette actuation range (and thus noise) can be already reduced by a factor 5, loosing only 1% of duty cycle  If tilt-meters will be put in action a calm condition on top-stage can be recovered, allowing at least a factor 8 reduction (by less 1% duty cycle) Volt

AdV Review - November 3rd, Marionette DAC Noise Reduction AdV starting point with a factor 5 DAC noise reduction AdV VIRGO

AdV Review - November 3rd, Present Performances vs AdV Specifications  Passive attenuation is OK  a new confirming test will be made in the next months  Payload swing is OK during normal environmental conditions  ID performance need to be enhanced during windy periods:  Tilt control as direct solution to reduce mirror swing below 200 mHz by a factor 10:  Operate high sensitive tilt-meters (difficult task) and piezo actuators  Investigate the possibility to extract the tilt signal combining the error signals of more SAs  Reduce actuation noise:  Selecting new low noise DAC (R&D: preliminary factor 1.5 obtained)  Splitting the action from only one to both cavity mirrors (factor 2)  Advanced filtering (enphaisis-de emphasis already tested on RM-Mirror)  Actuation optimization (factor 5 now)  Adaptive control strategy (new coil drivers with switch HN/LN config)

AdV Review - November 3rd, SAT Activities  SAT is called to make plans for the following activities:  Upgrade of the SA system (R&D activities):  Tilt Control:  Tilt-meters, piezoelectric actuators  Actuation noise:  ADC-DSP-DAC, Coil drivers  Upgrades:  Inverted Pendulum (IP)  Filter Zero (F0)  ACC, LVDT boards  Deliver plans for:  SR SA construction, assembly and integration  MC-DB-IB SAs upgrade

AdV Review - November 3rd, Tilt-Meter Status  Two Prototypes have been already assembled.  No problem in the electronics chain  Serious problems in the yielding of the flex joints (robustness).  New flex joint system mounted  Tests are being performed and will continue in the next months.

AdV Review - November 3rd, Piezoelectric Actuators Room for PZT accommodation Bottom ring Tilt meter  Tilt compensation was already addressed before VIRGO construction  Space for Piezos operation is already available on the bottom of IP platform

AdV Review - November 3rd, Piezoelectric Actuators Status  The three piezos P have been purchased.  The driving board is being prepared.  The installation in SA Facility at EGO (SAFE) is progressing

AdV Review - November 3rd, Inverted Pendulum  A new IP has been conceived.  Monolithic Al legs:  higher structural modes, more robust and safe for piezos operation  First IP prototype built and on site, ready to be assembled in SAFE

AdV Review - November 3rd, Filter Zero and Accelerometers  The F0 design is being investigated to displace to higher frequency the crossbar resonances (benefit to vertical ID)  Analysis of the F0 crossbar resonance effects is in progress to understand the impact on the interferometer  The ACC sensitivity ( a few m/s 2 / (Hz )1/2 above 1 Hz) is adequate for AdV VIRGO but a few actions are required  Obsolete electronics upgrades  Spares preparation  New digital control boards  New monolithic ACC is being investigated by the Napoli-Salerno Group

AdV Review - November 3rd, SAT R&D Activities Implementation Plan

AdV Review - November 3rd, SAT R&D Manpower

AdV Review - November 3rd, SR Construction, Assembly and Integration  The SR SA chain will be a complete long Superattenuator.  preliminary specs: (G. Vajente, “Requirements for the Advanced Virgo Length Sensing and Control System”, VIR-083-A, 2008)  VIRGO design + R&D upgrades  PBS, WBS, cost estimates and manpower plan has been conceived: SAT MANAGEMENT PLAN (Issue 1 ready): (“SAT AdV Plan for R&D, SR Construction and Short SA Upgrade” VIR-091A-,2008)

AdV Review - November 3rd, SR Construction, Assembly and Integration SR SA ITEM 1 St. Filt. ITEM 2 F0 ITEM 3 F7 ITEM 4 IP ITEM 5 Safety Frame ITEM 6 Susp. Wires ITEM 7 Cabling ITEM 8 Acceler ITEM 9 Tools

AdV Review - November 3rd, SR Production and Manpower Plan

AdV Review - November 3rd, SR Installation Plan

AdV Review - November 3rd, SR Costs Evaluation

AdV Review - November 3rd, MC-IB-DB Systems Upgrade  OPTION 1: One extra filter stage  1 FS, F0 blades, IP Flex joint, Cabling Reshuf.  OPTION 2: More than one extra filter stage (up to 4)  Opt.1 +n. FS, IP Legs, Safety Struct., Full Cabling.

AdV Review - November 3rd, MC-IB-DB Systems Upgrade Plans

AdV Review - November 3rd, MC-IB-DB System Costs

AdV Review - November 3rd, Summary of Management Plan SIGNAL RECYCLING SUSPENSION  Time: 9 Months for item preparation + 13 weeks for assembly  Persons: minimum of 7 physicists/engineers + 5 technicians  Costs: 327 k€ + electronics (130 k€ - detailed plan in progress) SHORT TOWER UPGRADES  Time: 7-11 months for items preparation + 13 – 17 weeks  Persons: minimum of 7 physicists/engineers + 5 technicians  Costs: 216 k€ (option1), 359 k€ (MC:1FS, IB 2FS, DB 2FS) 398 k€ (MC:1FS, IB 3FS, DB 3FS), 437 k€ (MC:1FS, IB 2FS, DB 2FS) + electronics (300 k€ TBD)