© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.

Slides:



Advertisements
Similar presentations
CAPACITY PLANNING FOR PRODUCTS AND SERVICES.
Advertisements

Capacity Planning. How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities should.
Chapter 5 Strategic Capacity Planning
Capacity and Constraint Management
MBA 570 Summer How much long-range capacity is needed When more capacity is needed Where facilities should be located (location) How facilities.
Capacity and Constraint Management
© 2004 by Prentice Hall, Inc., Upper Saddle River, N.J S 7-1 Operations Management Capacity Planning Supplement 7.
McGraw-Hill/Irwin Copyright © 2007 by The McGraw-Hill Companies, Inc. All rights reserved. 5 Capacity Planning For Products and Services.
Operations Management Aggregate Planning Chapter 13
PRODUCTION AND OPERATIONS MANAGEMENT
Process Strategies How to produce a product or provide a service that
Operations Management
Chapter 9b Price Setting in the Business World. How are prices set by business people? Costs provide a price floor. See what substitute products are priced.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
Operations Management Capacity Planning Supplement 7
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning Delivered by: Eng.Mosab I. Tabash Eng.Mosab I. Tabash.
Operations Management Capacity Planning Supplement 7
Operations Management
For Products and Services
Learning Modules Introduction to POM Chapters, 1, 2, & 3
Operations Management
Process Selection and Capacity Planning
© 2006 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
© 2006 Prentice Hall, Inc.7 – 1 Operations Management Chapter 5 – Process Strategy © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany Heizer/Render.
Operations Management
PowerPoint presentation to accompany Heizer/Render - Principles of Operations Management, 5e, and Operations Management, 7e © 2004 by Prentice Hall, Inc.,
Capacity and Constraint Management
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Capacity Planning Production Planning and Control.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall Process Strategies ( process, repetitive, product) The objective of the process strategy.
LSM733-PRODUCTION OPERATIONS MANAGEMENT By: OSMAN BIN SAIF LECTURE 29 1.
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Capacity Planning © 2006 Prentice Hall, Inc.
S7 - 1© 2014 Pearson Education, Inc. Capacity and Constraint Management PowerPoint presentation to accompany Heizer and Render Operations Management, Eleventh.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
Overhead and Marketing Variances Chapter Thirteen.
© 2008 Prentice Hall, Inc.13 – 1 Operations Management Chapter 13 – Aggregate Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Aggregate Planning Chapter 13. MGMT 326 Foundations of Operations Introduction Strategy Managing Projects Quality Assurance Facilities & Work Design Products.
7 Capacity Planning PowerPoint presentation to accompany
Operations Management Aggregate Planning
Copyright ©2016 Cengage Learning. All Rights Reserved
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management yl.
S7 - 1© 2014 Pearson Education Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh.
© 2006 Prentice Hall, Inc.S7 – 1 Capacity Planning © 2006 Prentice Hall, Inc.
Lecture 11 Capacity Management and Planning Books Introduction to Materials Management, Sixth Edition, J. R. Tony Arnold, P.E., CFPIM, CIRM, Fleming College,
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
MGT 563 OPERATIONS STRATEGIES Dr. Aneel SALMAN Department of Management Sciences COMSATS Institute of Information Technology, Islamabad.
Chapter 6 Managing Capacity
12-1Aggregate Planning William J. Stevenson Operations Management 8 th edition.
Capacity Planning Pertemuan 04
To Accompany Krajewski & Ritzman Operations Management: Strategy and Analysis, Seventh Edition © 2004 Prentice Hall, Inc. All rights reserved. Special.
S7 - 1 Course Title: Production and Operations Management Course Code: MGT 362 Course Book: Operations Management 10 th Edition. By Jay Heizer & Barry.
Suppl Capacity Planning Heizer and Render Principles of Operations Management, 8e PowerPoint slides by Jeff Heyl.
Copyright © 2014 by McGraw-Hill Education (Asia). All rights reserved. 13 Aggregate Planning.
Chapter 13 Aggregate Planning.
Operations Management Capacity Design
S7 - 1© 2011 Pearson Education, Inc. publishing as Prentice Hall S7 Capacity and Constraint Management PowerPoint presentation to accompany Heizer and.
 Capacity is the ability of a process or system to hold, receive, store or accommodate.  In business terms, it is the amount of output that a system.
14-1 McGraw-Hill/Irwin Operations Management, Seventh Edition, by William J. Stevenson Copyright © 2002 by The McGraw-Hill Companies, Inc. All rights reserved.
© 2006 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning © 2006 Prentice Hall, Inc. PowerPoint presentation to accompany.
S7 - 1 Capacity Planning PowerPoint presentation to accompany Heizer and Render Operations Management, Global Edition, Eleventh Edition Principles of Operations.
© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of.
Strategic Capacity Management
7 3 Capacity Planning PowerPoint presentation to accompany
Capacity and Constraint Management
Operations Management
Operations Management Capacity Design
Special Inventory Models
Operations Management
Presentation transcript:

© 2008 Prentice Hall, Inc.S7 – 1 Operations Management Supplement 7 – Capacity Planning PowerPoint presentation to accompany Heizer/Render Principles of Operations Management, 7e Operations Management, 9e

© 2008 Prentice Hall, Inc.S7 – 2 Capacity  The throughput, or the number of units a facility can hold, receive, store, or produce in a period of time  Determines fixed costs  Determines if demand will be satisfied

© 2008 Prentice Hall, Inc.S7 – 3 Modify capacity Use capacity Planning Over a Time Horizon Intermediate- range planning SubcontractAdd personnel Add equipmentBuild or use inventory Add shifts Short-range planning Schedule jobs Schedule personnel Allocate machinery * Long-range planning Add facilities Add long lead time equipment * * Limited options exist Figure S7.1

© 2008 Prentice Hall, Inc.S7 – 4 Design and Effective Capacity  Design capacity is the maximum theoretical output of a system  Normally expressed as a rate  Effective capacity is the capacity a firm expects to achieve given current operating constraints  Often lower than design capacity

© 2008 Prentice Hall, Inc.S7 – 5 Capacity and Strategy  Capacity decisions impact all 10 decisions of operations management as well as other functional areas of the organization  Capacity decisions must be integrated into the organization’s mission and strategy

© 2008 Prentice Hall, Inc.S7 – 6 Capacity Considerations  Forecast demand accurately  Understand the technology and capacity increments  Find the optimum operating level (volume)  Build for change

© 2008 Prentice Hall, Inc.S7 – 7 Managing Demand  Demand exceeds capacity  Curtail demand by raising prices, scheduling longer lead time  Long term solution is to increase capacity  Capacity exceeds demand  Stimulate market  Product changes  Adjusting to seasonal demands  Produce products with complementary demand patterns

© 2008 Prentice Hall, Inc.S7 – 8 Tactics for Matching Capacity to Demand 1.Making staffing changes 2.Adjusting equipment  Purchasing additional machinery  Selling or leasing out existing equipment 3.Improving processes to increase throughput 4.Redesigning products to facilitate more throughput 5.Adding process flexibility to meet changing product preferences 6.Closing facilities

© 2008 Prentice Hall, Inc.S7 – 9 Demand and Capacity Management in the Service Sector  Demand management  Appointment, reservations  Capacity management  Full time, temporary, part-time staff

© 2008 Prentice Hall, Inc.S7 – 10 Profit corridor Loss corridor Break-Even Analysis Total revenue line Total cost line Variable cost Fixed cost Break-even point Total cost = Total revenue – – – – – – – – – – – |||||||||||| Cost in dollars Volume (units per period) Figure S7.6

© 2008 Prentice Hall, Inc.S7 – 11 Decision Trees and Capacity Decision Market unfavorable Market favorable Large plant Market favorable Market unfavorable Medium plant Market favorable Market unfavorable Small plant Do nothing