NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9, 2016 1.

Slides:



Advertisements
Similar presentations
Automation and Improvements to Default Uplift Methodology (summary/white paper of a draft NPRR)
Advertisements

1 Appeal to ERCOT Board Regarding Use of Fuel Oil Index Price (FOIP) Larry Gurley TXU Wholesale June 19, 2007.
1 TAC Review of PRR 650 August 3, Board Charge to TAC Board remanded PRR 650 to TAC for: “an analysis of how to ensure that consumers pay only.
RCWG Update to WMS April 9, VCMRR-VC for Cancellation of RUC Committed Resources Paragraph (3) of Nodal Protocol Section regarding Cancellation.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee February 7, 2008.
Protocol Revision Subcommittee Tom Burke July 2, 2013.
ERCOT RMR Deployment and Cost Proposals By: Matt Mereness and Ino Gonzalez.
Protocol Revision Subcommittee Sandy Morris August 5, 2010.
May 29, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott June 3, 2014 TAC Update to RMS 1.
7/15/2013 CSWG CSWG – ERCOT Update ERCOT Matthew Tozer.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 8, 2008.
July 30, 2015 TAC Meeting Update to COPS Michelle Trenary August 12, 2015.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 4, 2006.
January 14, New logic and invoices used in January 2015 when closing out December 2014 New Bill Determinants: CRRBAFA- CRR Balancing Account Fund.
Market Mitigation Concept Group Update Jim Galvin April 26, 2004.
Protocol Revision Subcommittee Sandy Morris October 6, 2011.
Presentation to WMS Regarding PRR 731- Fuel Oil Index Price (FOIP) Larry Gurley July 18, 2007.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee March 4, 2010.
NPRR385, Security Violation Analysis and Reporting and Negative Price Floor WMS Meeting February 15, 2012.
Real Time Settlement Timeline Workshop Debrief To TAC 11/29/2012 Evaluation and consideration of reducing the RT Settlement Timeline Jim Galvin- CSWG Chair.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee August 7, 2008.
Mandy Bauld ERCOT October 9, 2012 RTM SETTLEMENT TIMELINE.
Protocol Revision Subcommittee Sandy Morris November 3, 2011.
Quick Start Resource – Payment for Start-Up at less than LSL Current NPRR language: ( 8) If a QSGR comes On-Line as a result of a Base Point less than.
Protocol Revision Subcommittee Sandy Morris December 1, 2011.
August 28, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 9, 2014 TAC Update to RMS 1.
Competitive Constraints/ Protocols 3.19 Presented to CMWG 10/14/2011 Steve Reedy, Manager, CRR.
Resource Cost Working Group October 7, 2015 WMS Update.
Appeal of PRS Action NPRR 351, Calculate and Post Projected Non-Binding LMPs for the Next 15 Minutes Floyd Trefny Texas Steel Companies.
1 TAC Report to the ERCOT Board February 21, 2006.
QMWG Update to WMS S. Looney December 3, Assignments from WMS ERCOT Market Operations Report – Two SASMs in October, no AS insufficiency – Two unique.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Verifiable Costs Process WMS Meeting May 15, 2007 Ino.
NPRRs 663NPRR Ancillary Service Insufficiency Actions. This Nodal Protocol Revision Request (NPRR) specifies the actions ERCOT will take to ensure sufficient.
Item 3: PRS Report John Varnell 2013 PRS Chair Technical Advisory Committee (TAC) Meeting ERCOT Public November 7, 2013.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee May 8, 2008.
9/17/2012 CSWG CSWG – ERCOT Update ERCOT. 2 Settlements Project & Operational Updates February 27, 2012 NPRR 347: Combined Daily Invoice –Still on track.
1 TAC Report to the ERCOT Board February 16, 2005.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2010.
Protocol Revision Subcommittee Tom Burke September 7, 2012.
Protocol Revision Subcommittee Report to ERCOT Technical Advisory Committee December 5, 2002.
1 Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee January 6, 2004.
August 27, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott September 1, 2015 TAC Update to RMS1.
Market Credit Working Group Update to WMS Wed. Oct 20, 2010.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Nodal Dispute Management System Business Requirements ERCOT.
1 TAC Report to the ERCOT Board January 17, 2006.
Protocol Revision Subcommittee Rob Bevill January 5, 2012.
DAM Self-Commitment Issues & Solutions, Part 2 Shams Siddiqi, Ph.D. (512) April 21, 2008.
Protocol Revision Subcommittee Presentation to the ERCOT Technical Advisory Committee October 1, 2009.
February 27, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 4, 2014 TAC Update to RMS 1.
Role of Account Management at ERCOT 2006 TAC Subcommittee Review ERCOT Board February 21, 2006.
Lead from the front Texas Nodal 1 High-Level Overview of draft NPRR implementing PUCT Rule Posting Requirements January 8,
COPS DECEMBER 2013 UPDATE TO RMS 12/18/2013 Harika Basaran, Chair Jim Lee, Vice Chair.
Market Operating Level Agreement (OLA) Discussion Betty Day 8 December 2009 Nodal Advisory Task Force.
1 TAC Report to the ERCOT Board November 14, 2006.
Protocol Revision Subcommittee Tom Burke April 5, 2012.
NPRR 649 Addressing Issues Surrounding High Dispatch Limit (HDL) Overrides Katie Coleman for Air Liquide (Industrial Consumer) ERCOT Board February 9,
December 2010 Wholesale Market Subcommittee Report to Technical Advisory Committee.
Texas Nodal © Electric Reliability Council of Texas, Inc. All rights reserved. 1 Verifiable Costs Process Settlement and Data Aggregation Working.
Protocol Revision Subcommittee Tom Burke January 3, 2013.
June 26 and July 31, 2014 Technical Advisory Committee (TAC) Update to RMS Kathy Scott August 5, 2014 TAC Update to RMS 1.
RCWG Update to WMS March 7, Draft NPRR, Caps and Floors for Energy Storage Resources Chair of ETWG gave high level overview ERCOT had questions.
February 25, 2016 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 1, 2016 TAC Update to RMS 1.
Money Transfer Due to Real-Time Irresolvable Constraint Resmi Surendran ERCOT.
Protocol Revision Subcommittee Sandy Morris May 5, 2011.
1 February, 2012 QMWG S&B Protocol Clarifications QSE-Requested Decommitment of a DAM Commitment ERCOT Mandy Bauld.
Reliability Must Run Resources for Summer Slide 2 RMR for Summer 2011 RMR Contracts for Mothballed Units ERCOT has signed RMR Agreements with two.
Protocol Revision Subcommittee Tom Burke November 29, 2012.
February 26, 2015 Technical Advisory Committee (TAC) Update to RMS Kathy Scott March 3, 2015 TAC Update to RMS 1.
Settlement Update Austin Rosel ERCOT February 27, 2017.
TAC Report to the ERCOT Board
Presentation transcript:

NPRR 649 Board Appeal Koch Ag & Energy Solutions February 9,

Discussion Outline  Provide context regarding NPRR 649  What are HDL Overrides and how they impact Resources  Explain NPRR 649 and describe how it solves the issue of HDL Override  Illustrate how NPRR 649 is consistent with other similar situations addressed in the Protocols  Discuss some of the objections to NPRR 649  Conclusion 2

NPRR 649 Background  In November 2012, through the use of HDL overrides, ERCOT limited generation from the Odessa plant during a period of very high prices which caused significant financial losses for the plant.  Odessa initially filed a dispute and an ADR which were both denied by ERCOT. Odessa then filed an appeal with the PUCT which was ultimately settled.  ERCOT made a resettlement payment related to the opportunity cost to follow the instructions and agreed to submit NPRR 649 in order to prevent future ambiguity. 3

NPRR 649 Voting History  September 12, 2014 – Mandy Bauld and Chad Seely of ERCOT filed NPRR 649  Stakeholder working groups worked on this NPRR to achieve consensus and minimize cost  October 7, Wholesale Market Subcommittee (WMS) unanimously voted to endorse NPRR 649 with all segments present  November 12, Protocol Review Subcommittee (PRS) voted to endorse with only one opposing vote from the Consumer segment and one abstention from the IREP segment  November 19, 2015 TAC - NPRR 649 having received 56% of the votes in favor of the NPRR, failed to achieve the 67% support necessary for approval  December 7, Koch filed this appeal to the ERCOT Board 4

What are HDL Overrides  The main objective of an override is to achieve reliability  The Nodal Protocols were drafted under the assumption that there was no need for this type of instruction, but in practice, the ERCOT operators still need this type of tool to ensure grid reliability 5 EXAMPLE

HDL overrides since January 2014  The impact of granting occasional HDL overrides would be insubstantial to the ERCOT system as a whole, but could be very meaningful to an individual Resource 6

NPRR 649 compensates resources when output is restricted  NPRR 649 ensures Resources that respond to reliability instructions are then compensated for any lost generation that would have been produced had the Resource’s output not been restricted.  To prevent overcompensation, the affected Resource’s offer curve is used to determine the output level that the Resource would have produced had it not received the HDL override.  Affected Resources will be required to file a dispute to receive compensation.  To keep costs under control, ERCOT will be required to post costs of overrides and mitigation suggestions to reduce the necessity for them. 7

Precedents within the Protocols for NPRR 649  Make-whole for out-of-merit reliability instructions is entirely consistent with existing Protocols  NPRR 649 is substantially the same as the existing Protocol Section (4), which pays a Resource when instructed to generate ABOVE its economic level while NPRR 649 pays a Resource when instructed to generate BELOW its economic level  Examples within the Protocols where Resources instructed to operate at levels other than their economic level and receive compensation for providing these services include  Real-Time Make-Whole Payment for Exceptional Fuel Cost  Reliability Must-Run Settlement  Voltage Support Settlement  (1) Emergency Operations Settlement – Emergency Conditions or Watches  (2) Emergency Operations Settlement - Testing  (3) Emergency Operations Settlement - QSGR  (4) Emergency Operations Settlement – Base Points that are inconsistent with Real-Time Settlement Point Prices (RTSPP)  (5) Emergency Operations Settlement – SCED failure  Each example above uses the same methodology to charge for these services 8

Arguments against NPRR 649  Argument 1: A Resource could mitigate or eliminate any exposure if they do not offer into the DAM  Rebuttal: DAM Energy awards are not the only way a Resource incurs a future obligation. Bilateral energy trades in addition to obligations to perform under call options or tolling agreements, create responsibilities for Resources. Resources also use the CRR Market as a tool to hedge or mitigate congestion exposure. The length of the bilateral contracts varies greatly—one day to beyond ten years. Therefore, the ability to “turn off” this exposure is not as simple as withholding an offer in the DAM. Good market design should encourage participation in both centralized markets and forward bilateral markets, not discourage it.  Argument 2: A Resource should be paid for the first day of harm, but not subsequent days  Rebuttal: First, this argument assumes that ERCOT’s operational plans are public and that the Resource can determine how long the overrides will continue. Second, contracts, involving CRRs, bilateral trades, call options, and tolling agreements, often obligate Resources to perform for days or even years; in many cases these cannot be “bought back”. Failure to generate at desired levels can leave Resources exposed. Resources cannot “adjust operations” without financial impacts, often exceeding the actual harm the override causes.  Argument 3: A Resource should only be paid “actual harm”, not “opportunity cost”  Rebuttal: For good reasons, opportunity costs have been consistently viewed as actual costs in the Protocols. Opportunity costs are also known as “resources lost”, and if ignored in a make-whole, the override would merely be a taking. The Resource owner should be allowed to participate in any available market to sell their power without fear of any financial loss due to potential HDL overrides.  Argument 4: Cost Allocation  Rebuttal: Cost allocation is consistent with other charge types in the Protocols where direct assignment is not possible. 9

Conclusion  As long as ERCOT continues to need out-of-merit reliability tools, NPRR 649 must be implemented to prevent financial losses when complying with ERCOT’s instructions.  If NPRR 649 is not implemented, ERCOT must stop using HDL overrides. Failure of the ERCOT Board to approve NPRR 649 represents a risk to a single-market segment that cannot be hedged, managed, or mitigated.  This risk has serious and negative consequences for the entire market as resources will shy away from forward transactions that drive financing and investment in new resources.  Koch supports ERCOT’s claim that it needs HDL overrides for reliability reasons, and therefore requests the ERCOT Board to approve NPRR