MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod.

Slides:



Advertisements
Similar presentations
University College London, Optical Science Laboratory bHROS Progress bench-mounted High Resolution Optical Spectrograph bHROS bHROS Progress General.
Advertisements

MMIRS 1 MMIRS MMT and Magellan Infrared Spectrograph Brian McLeod.
CIEMAT technological contributions to linear colliders Fernando ToralGandía, 3/12/2005.
MICE RF and Coupling Coil Module Outstanding Issues Steve Virostek Lawrence Berkeley National Laboratory MICE Collaboration Meeting October 26, 2004.
Design of the T962 Cryostat L. Bartoszek BARTOSZEK ENGINEERING 5/10/07.
FourStar Image Motion Stephen Smee (410)
Área de Instrumentación NAHUAL Mechanical Concept Current Status F. Javier Fuentes Instituto de Astrofísica de Canarias September
Engineering performance of IRIS2 infrared imaging camera and spectrograph V. Churilov, J Dawson, G. Smith, L Waller, J Whittard, R Haynes, A Lankshear,
RFCC Module Update Derun Li Center for Beam Physics LBNL, Berkeley, CA MICO Weekly Phone Meeting March 21, 2011.
NGAO Instrumentation Overview September 2008 Updated Sean Adkins.
FLITECAM: The first light camera for SOFIA Amanda Mainzer, I. S. McLean, T. Aliado, E. E. Becklin, G. Brims, J. Goulter, E. Kress, N. Magnone, J. Milburn,
Grism Spectroscopy with FLITECAM Erin C. Smith (UCLA) Ian S. McLean (UCLA)
NGAO Alignment Plan See KAON 719 P. Wizinowich. 2 Introduction KAON 719 is intended to define & describe the alignments that will need to be performed.
MMT Magellan Infrared Spectrograph ( MMIRS ) P.I. Brian McLeod Warren R. Brown SAO/CfA.
Masahiro Konishi (IoA, UTokyo), SWIMS Team S W I M S.
Magellan f/5 Planning and Status Andrew Szentgyorgyi Magellan SAC Meeting Pasadena/17 Mar 2012.
Technical manager’s report September Telescope activities Primary mirror hardpoint repair New mirror actuator controls Collimation analysis F/5.
Corner Raft Test Station Kirk Arndt, Ian Shipsey Purdue University LSST Camera Workshop SLAC Sept , 2008.
18/19 January 2003IMACS SAC meeting update1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 18/19 January 2003 OCIW, Pasadena,
Magellan F/5 System Status A.Szentgyorgyi/SAO/30 Apr 2005.
Nov 6, 2005SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status Reassembly and retesting in Cape Town Estimated CTC $343,000 (7.3%) over PDR cap.
LBT Q Engineering Review DYB. 26-Oct-2007LBT Q Engineering Review Highlights (Q3/2007) Currently in Commissioning Phase Currently in Commissioning.
1 FRIDA Engineering Status 17/05/07 Engineering Status May 17, 2007 F.J. Fuentes InFraRed Imager and Dissector for Adaptive Optics.
STARLight PDR 3 Oct ‘01 F.1.1 Rashid STARLight STARLight Mechanical Tahir Rashid STARLight Mechanical Engineer (734)
PACS IIDR 01/02 Mar 2001 Instrument Interfaces1 PACS FPU Opto-mechanical Design Overview and Interfaces J. Schubert MPE.
Magellan F/5 System Status A.Szentgyorgyi/SAO/25 Sept 2004.
Current Status of SPICA Focal Plane Instruments October 19, 2009 Hideo Matsuhara (ISAS/JAXA) & FPI team.
Utilities 14 October 2008 Martin Nordby, Gordon Bowden.
Telescope Integration and Tests Tuesday Afternoon.
Magellan F/5 System Status A.Szentgyorgyi / Ann Arbor 25 Sept 2005.
6-7 October 2001Inamori-Magellan Areal Camera & Spectrograph 1 IMACS: Inamori-Magellan Areal Camera and Spectrograph Magellan SAC Status Report 6-7 October.
MIRI Optical System CDR, 6 th & 7 th December 2006 Mid InfraRed Instrument 07-1 Optical System Critical Design Review (CDR) TIPS Presentation: Margaret.
AO188/LGS Status and Schedule 1 Yutaka Hayano January 31, 2008.
Magellan F/5 secondary updates. Magellan F/5 secondary  Mirror polishing finished late 2007  Final figure “better than MMT”
Test Readiness Review 23 October 2003 CRAL - LYON.
Binospec - Next Generation Optical Spectrograph for the MMT
Oct 24, 2006SSWG1 Robert Stobie Prime Focus Imaging Spectrograph Status On-telescope throughput analysis Ghost analysis Repair plan Status of other current.
DBSP-R Upgrade Progress Review The DBSP-R Team DBSP-R Progress Review.
FourStar Status Eric Persson (OCIW) Presented By.
Magellan Planet Finder Spectrograph Jeff Crane (OCIW) Steve Shectman (OCIW) Paul Butler (DTM)
Science with Giant Telescopes - Jun 15-18, Instrument Concepts InstrumentFunction range (microns) ResolutionFOV GMACSOptical Multi-Object Spectrometer.
Magellan SAC April 7-8, 2006 Pasadena, CA. Personnel New hires: –None Open positions: –Programmer –Scientists (two, through AAO) Changes –Pasadena EE.
Page 1HMI/AIA Science Meeting – February 13, 2006 HMI Instrument Status HM/AIA Science Meeting February 13, 2006 Barbara Fischer HMI Deputy Program Manager.
Status of Anti project. F. Raffaelli,A. Checchetti,C. Capoccia. INFN CERN, July 14 th, Status of the Anti construction test and schedule. -Status.
Extended Detector Cutoff Considerations WFIRST Project Office May
FIRE: Status update and Preliminary Commissioning Plan Rob Simcoe (A. Burgasser, M. Smith, R. Bernstein, B. Bigelow, J. Pipher, C. McMurtry, W. Forrest)
Status Report for E391a (Continuation of the previous PAC on April) G.Y.Lim IPNS, KEK Group Meeting at the JINR 26 th – 29 th July 2003 Dzhelepov Laboratory.
MMIRS Status A.Szentgyorgyi/SAO 30 April Imaging 7 x 7 arcmin FOV 0.2 arcsec pixels Y,J,H & K wavelength coverage Spectroscopy Multislit (4’ x 7’)
FourStar Status SAC Meeting 13mar2010 Persson, Murphy, Birk, Monson, Kelson, Uomoto.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/04 MMIRS Status Report Brian McLeod.
GMT’s Near IR Multiple Object Spectrograph - NIRMOS Daniel Fabricant Center for Astrophysics.
18-19 May 2007Mosaic-II Update, SAC Meeting Mosaic-II Progress Tyson Hare, Ian Thompson, Greg Burley, Christoph Birk, Alan Dressler, Alan Uomoto.
The Prime Focus Imaging Spectrograph for the Southern African Large Telescope: Operational Modes Chip Kobulnicky – Instrument Scientist, University of.
NIRSpec - the JWST Multi-Object Spectrograph P. Ferruit (ESA), S. Arribas (CSIS), S. Birkmann (ESA), T. Böker (ESA), A. Bunker (Oxford), S. Charlot (IAP),
Clive Field, Reggie Rogers, Venkat Srinivasan Undulator Week: BFW Card Status Update 01/23/ BFW Card - Physics Requirements.
MagIC Upgrade for High-Speed Photometry Jim Elliot, MIT Magellan SAC
Teleconference ACS – FREIA 31th May 2017
WEAVE Spectrograph.
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Agenda ComCam planning and scheduling (James & Jacques) CCS & CCS-TCS Interface (Tony) Software to use ComCam Software to get data out of ComCam (Mike)
Telescope Assembly, Integration and Verification (AIV) WBS 04C. 14 J
ComCam Hardware and Interfaces James Howard ComCam CAM LSST 2017 Project & Community Workshop 2017 Aug 15.
Prime Focus Imaging Spectrograph Status
COSMOS Status David Sprayberry, Sean Points & Jay Elias
INSTRUMENT CONTROLLER OVERVIEW
FourStar 4K x 4K JHK imager
Status of the PANDA Solenoid Magnet Production in BINP
Instrument Overview Larry Springer HMI Program Manager
Teleconference ACS – FREIA 19th June 2017
Presentation transcript:

MMIRS 1 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS Status Upate Presented by A. Szentgyorgyi P.I. B. McLeod

MMIRS 2 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 Basic Operational Modes Imaging 7 x 7 arcminute FOV 0.2 arcsecond pixels Y, J, H & K wavelength coverage Spectroscopy Multi-slit (4’x7’) or longslit (7’) –J, H, R=3000 –J+H, R=1400

MMIRS 3 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 MMIRS EXTERIOR TRUSS ELECTRONICS RACKS (2) GUIDER/ WFS MOS SECTION DETECTOR PRE-AMP’S CAMERA SECTION TELESCOPE TRUSS- WELDED ASSEMBLY WITH BOLT INTERFACES TO TELESCOPE & CRYOSTAT ELECTRONICS RACK TRUSS (2) MOS SECTION

MMIRS 4 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 Corrector Optics (warm) Guider/WFS (warm) Detector LN2 Tank/ Optical Bench Collimator Camera Slit Masks Dekker

MMIRS 5 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 Project Timeline TSIP Proposal Feb 2003 Start of Work Dec 2003 PDR July 2004 CDR May 2005 Optics orderedAugust 2005 Begin manufacture Oct 2005 Delivery to MMT early 2007 Delivery to Magellan July 2007

MMIRS 6 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 Current Status Optics: Contract has been awarded to Janos. Mechanical Design: Solid modeling 98% done. Vacuum vessel RFQ released. LN2 tank/optical bench RFQ finished next week. Electrical Design: Design and component selection are complete. Detailed drawings in progress. SWIRC pathfinder controller in operation reading 32 channel MMIRS engineering device at MMT. Software: Design complete. Many heritage components. Test dewar: In house. Servo controlled cooling tests about to begin. Detector testing to follow.

MMIRS 7 Harvard-Smithsonian Center for Astrophysics Magellan SAC 9/05 LCO Issues MMIRS instrument weight 3244 lb. – can be lifted by crane in dome. MMIRS weight at Cass (w/ adapter, &c) is 4471 lb. – also acceptable. SAO & LCO collaborating on ops plans for prepping, mounting, operating and (if necessary) repair LCO – clean room essential component. Expect to refine ops plan during October 2005 engineering.