PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR.

Slides:



Advertisements
Similar presentations
16/12/02GS/ALICE TB 1 Update on the ALICE Grounding Plan From draft document (June 02) The grounding plan for ALICE proposed in this document is based.
Advertisements

PACS SVR22/23 June 2006 Erich Wiezorrek, MPE Test Facility Capabilities EGSE.
PACS IHDR MPE, 12/13 Nov 2003 PACS ICC1 ICC - EGSE, PCSS, HCSS, IEGSE - Otto H. Bauer MPE Garching.
PACS IHDR 12/13 Nov 2003 Overview and Mechanical/Thermal IFs to FPU 1 MPE J. Schubert PACS IHDR.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PACS Management, …1 PACS Management, Funding and Schedule Otto H. Bauer MPE Garching.
TELESCOPE ANALOG CONTROL Martin Frericks, Frans Zwart.
PACS IHDR 12/13 Nov 2003 Photoconductor Detector Modules 1 IHDR ASTEQ-GmbH Germany Peter Dinges, Michael Harr, Heribert Krüger, Hilmar Richter, Bernd Zimmermann.
PACS IHDR, Garching 12/13 Nov 2003 Chopper R. Hofferbert D. Lemke, U. Grözinger, O. Krause, A. Böhm, A. Bohm (Hardware) R. Vavrek, U. Klaas (ICC) J. Katzer,
PACS IHDR 12/13 Nov 2003 PACS Instrument Overview1 Instrument Design/Development Overview and System Performance PACS Instrument Overview A.Poglitsch MPE.
Test Cryostat, OGSE and MGSE PACS IHDR: MPE 12/13 Nov 2003 AIV1 PACS Test Cryostat, OGSE and MGSE Gerd Jakob MPE.
COMP8130 and 4130Adrian Marshall 8130 and 4130 Test Design & Documentation Adrian Marshall.
GLAST LAT ProjectNovember 18, 2004 I&T Two Tower IRR 1 GLAST Large Area Telescope: Integration and Test One and Two Tower Integration Readiness Review.
PACS IHDR 12/13 Nov 2003 PACS FPU Mirrors and Black Paint R. Graue, D. Kampf Kayser-Threde.
PACS IHDR 12/13 Nov 2003 PACS FPU Optics: Concept and Alignment R. Graue, D. Kampf Kayser-Threde.
PACS IBDR 27/28 February 2002 PACS DEC/MEC1 Detectors & Mechanisms Controllers (DEC/MEC) J.-M. Gillis Centre Spatial de Liège (B)
WU1 - Management S. Gammino (INFN). WU1 Management and TDR preparation: overview and criticalities 2 The WP6 aim is to define the best design of the Warm.
PACS IHDR MPE 12/13 November 2003 AIV 1 PACS IHDR Integration, Qualification and Testing Reinhard Katterloher.
PACS SVR22/23 June 2006 PACS Thermal Behaviour1 PACS Thermal Behaviour Tests T. Müller, H. Feuchtgruber, A. Contursi, Cs. Kiss, Sz. Csizmadia.
PACS IHDR 12/13 Nov 2003 PACS FPU Distribution Boards and FPU Harness Concept R. Graue, D. Kampf Kayser-Threde.
PACS SVR22/23 June 2006 FM IST1 PACS FM Tests at Integrated Satellite Level H. Feuchtgruber with inputs from the PACS Operations Team: D. Cesarsky, H.
PACS IHDR 12/13 Nov 2003 PACS FPU FPU Structure, Baffle and Straylight R. Graue, D. Kampf Kayser-Threde.
PACS IQR 13 Jan 2005 PACS OBSW1/33 PACS On-board Software & User Manual A. Belbachir (UVIE/TUVIE, SPU) H. Feuchtgruber (MPE, SE) A. Mazy (CSL, DMC) S.
Development programs and model philosophy1 Preliminary design review Prototype program Critical design review Qualification program Qualification review.
PACS IQR 13 Jan 2005 IHDR Close-out1 Close-out of IHDR: Concerns / Recommendations A. Poglitsch.
PACS IBDR 27/28 Feb 2002 IIDR Close-out1 Close-out of IIDR Recommendations A. Poglitsch.
PACS SVR38/9 Nov 2007 Commissioning Phase1 Commissioning Phase H. Feuchtgruber.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
PACS IHDR 12/13 Nov 2003 IBDR Close-out1 Close-out of IBDR Recommendations A. Poglitsch.
PACS IQR ESTEC, 13 Jan 2005 Documentation1 G. Wildgruber MPE Garching Introduction to Documentation - CQM/AVM EIDP and IQR-
PACS IQR 13 Jan 2005 First Assessment1 The PI’s Self-Assessment A. Poglitsch.
PACS SVR 2 18 Jan 2007 FM ILT: Mechanisms1 FM ILT Results: Mechanisms H. Feuchtgruber, H. Dannerbauer, N. Geis, C. Hartinger, U. Klaas, P. Royer.
Consortium Meeting La Palma October PV-Phase & Calibration Plans Sarah Leeks 1 SPIRE Consortium Meeting La Palma, Oct. 1 – PV Phase and.
PACS SVR-II 18 January 2007 FM ILT overview1 The PACS FM ILT Phase I overview on actual test execution and analysis Eckhard Sturm MPE.
PACS IQR ESTEC 13 January 2005 Mech Qual Status 1 PACS IQR Mechanical Qualification Status and Plans for PFM Reinhard Katterloher R. Graue, D. Kampf, R.
Ronald Lipton PMG June Layer 0 Status 48 modules, 96 SVX4 readout chips 6-fold symmetry 8 module types different in sensor and analog cable length.
Herschel/Planck January 13, 2005PACS IQR - SCI-PT/ ggonzale: Herschel PACS Instrument Qualification Review Review Objectives and Organisation G.Crone/G.Pilbratt.
PACS IIDR ESTEC 01/02 March 2001 OGSE 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher OGSE.
PACS IBDR 27/28 Feb 2002 PACS Data Flow1 PACS Data Flow, Instrument Modes and Operations Helmut Feuchtgruber MPE.
PACS IBDR 27/28 Feb 2002 PACS Instrument Overview1 Instrument Design/Development Status and System Performance PACS Instrument Overview A.Poglitsch MPE.
PACS IBDR 27/28 Feb 2002 PACS PI Summary1 Where we are and where to go… A. Poglitsch MPE.
PACS IHDR 12/13 Nov 2003 Filters1 N. Geis MPE. PACS IHDR 12/13 Nov 2003 Filters2 PACS Filter Scheme Filter scheme with 5 or 6 filters in series in each.
PACS IIDR ESTEC 01/02 March 2001 System Engineering 1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher System Engineering DDVP, Model.
PACS IHDR MPE 12/13 November 2003 System Engineering 1 PACS IHDR Model Philosophy, Budgets, Interfaces and IID-B Reinhard Katterloher.
PACS IQR13 Jan 2005 Warm Electronics Qualification Status1 Martin von Berg PACS IQR.
PACS IHDR MPE, 12/13 Nov 2003 Overall Schedule1 Otto H. Bauer MPE Garching.
PACS IBDR 27/28 Feb 2002 OBSW Simulation1 PACS OBSW Simulation/Test A.Mazy (CSL), S.Pezzuto (IFSI), A.N.Belbachir (TUVIE), H. Feuchtgruber (MPE)
PACS SVR II – SPU HLSW Garching, 18th Jan 2007 prepared by R. Ottensamer and C. Reimers.
CEA DSM Dapnia SAp Flux calibration of the Photometer Koryo Okumura, Marc Sauvage, Nicolas Billot, Bertrand Morin DSM/DAPNIA/Sap.
PACS SVR 22/23 June 2006 Test Campaigns1 Overview of PACS Test Campaigns Helmut Feuchtgruber MPE.
PACS SVR38/9 Nov 2007 System Testing1 Tests on Satellite Level H. Feuchtgruber.
PACS IIDR ESTEC 01/02 March 2001 Integration and Testing1 PACS Instrument Intermediate Design Review (IIDR) Reinhard Katterloher Integration and Testing.
1DSM/DAPNIA/SAp – J. MartignacPACS - IHDR - MPE – Nov. 12 – 13, 2003 PACS – IHDR PhFPU Design J. Martignac CEA/DSM/DAPNIA Service d’Astrophysique.
PACS IBDR MPE 27/28 Feb 2002 System Engineering 1 PACS IBDR Model Philosophy / Development Plan Reinhard Katterloher.
Herschel EQM – Results and Lessons Learnt6/7 Feb 2006 PACS Overall Analysis1 Overall PACS EQM IMT Analysis Contributions by PACS ICC.
PACS 12/13 November 2003 PACS PA/QA IHDR1 PACS PA / QA STATUS Documentation overview Cooperation with PA/QA responsibles -outlook- NCR Status System documents.
PACS IIDR 01/02 Mar 2001 EGSE1 Otto H. Bauer MPE.
PACS SVR22/23 June 2006 Warm Electronics1 Warm Electronics: Components/Subsystems Test Results B. Voss PACS SVR.
3 He Fridge SPIRE WE Review Dec. 6-7, IFSI 1 3 He Sorption Fridge “Cooler” WE Preliminary Design Presented by: L. Rodriguez / CEA/SAp. Subsystem.
PACS IBDR MPE 27/28 Feb 2002 AIV 1 PACS IBDR Test Cryostat and OGSE Gerd Jakob MPE.
PACS IIDR 01/02 Mar 2001 PACS Grounding Scheme and EMC1 Grounding Scheme and EMC Matthias Rumitz, MPE.
PACS IHDR 12/13 Nov 2003 Digital Processing Unit1/15 DPU PRESENTATION R.Orfei & S. Pezzuto CNR- IFSI.
PACS IQR Kick-off ESTEC, 13 Jan 2005 PA/QA Status1 O.H. Bauer MPE Garching PA/QA Status.
PACS IHDR12/13 Nov 2003 Cryo Harness1 Cryo Harness, Test Cryo Harness Martin von Berg PACS IHDR.
Double Star: Experiment Activities
Double Star: Table of Contents
Double Star: Table of Contents
Injectors BLM system: PS Ring installation at EYETS
TAP eForm & Enterprise Database Training
Engineering Processes
Presentation transcript:

PACS IHDR12/13 Nov 2003 Warm Electronics1 Warm Electronics: Overview, Interfaces, Grounding and EMC Martin von Berg PACS IHDR

12/13 Nov 2003 Warm Electronics2 Warm Electronics Overview

PACS IHDR12/13 Nov 2003 Warm Electronics3 Warm Electronics Redundany

PACS IHDR12/13 Nov 2003 Warm Electronics4 PACS AVM ILT WE Set-up

PACS IHDR12/13 Nov 2003 Warm Electronics5 Grounding PACS System Grounding Concept consolidated PACS System Grounding Doc. PACS-ME-LI-006 via CR-0018 updated. Next issue to be released until (in response to Astrium comments). Verification Matrix will be provided Spectrometer Detector chain Grounding is still adaptable after EQM Testing Photometer Detector chain was analysed (verify Doc. SAp-PACS-DS-0010/ )

PACS IHDR12/13 Nov 2003 Warm Electronics6 EMC PACS EMC Control Plan is to 30% ready. Final version end of this year All Test Procedures and Sequences will be provided Verification Matrix will be provided CEA EMC Analysis triggered RfW-004 to reduce incident H- Field  RfW rejected Some EMC testing already done (Chopper, SPU CE-CM, DPU DC/DC, 1355 I/F) Main constraint: poor EMC representativity of the CQM ILT PACS set-up

PACS IHDR12/13 Nov 2003 Warm Electronics7 EMC Preparation for EQM ILT MPE EMC Measurements –Set-up different to PFM and EQM PACS –Cryostat, harness length, WU Box dimensions, PS –External PS (DMC and BOLC), only DPU FFF –Only Conducted Measurements feasible Astrium EQM EMC Measurements –Long harness between external PS not possible –EQM Cryo Harness longer than PFM CH –Refurbished ISO Cryostat will be used –EGSE environment different to S/C –Cryostat closed (but main coupling through harness)