Summary of FEE-Integration Meeting LNF, 10.09.2003 1 Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided.

Slides:



Advertisements
Similar presentations
1 S. Lusin, LV Cabling, CERN 06 Apr 06 LV Cabling 06 Apr 06 S. Lusin Fermilab / CERN Cabling from USC to UXC, Power Distribution.
Advertisements

M.PEGORARO Grounding Workshop 24th Jan 08 DT GROUNDING & SHIELDING Presented by A. BENVENUTI.
LECC V. Bobillier1 Overview of LHCb Electronics installation aspects V. Bobillier; L. Roy; J. Christiansen CERN - LHCb.
CMS WeekDec 2002E. Hazen HF Electronics Status Report E. Hazen, J. Rohlf, E. Machado Boston University.
Walls crates cables gas chambers electronics CERN adb.
FT Integration Raffaella De Vita INFN – Genova Jefferson Lab 10/15/2013.
Chamber PCB s, FEB s, Cooling, HV/LV Distribution 1)PCB designs-track widths, track to track distances … 2) Double sided and Multi layer, modular approach.
Experimental Area Meeting V. Bobillier1 Good connection to earth (in many points) of every metallic parts to be installed in the cavern is very.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics, cable Muon upgrade in a nutshell.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
Proposal of new electronics integrated on the flanges for LAr TPC S. Cento, G. Meng CERN June 2014.
G. Martellotti CERN 22/04/20021 Tooling / Test Stations for MWPC (Meeting LNF, Roma1/Pz ) Production rate : 408 chambers (Fe + LNF) :192 R4 M1.
V. Bobillier1 Long distance cable installation status Calorimeter commissioning meeting.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
Goals: - To get experience in assembling MWPC on the Wall and prevent possible problems; - To check functionality and stability of different chambers at.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
Muon Electronics Upgrade Present architecture Remarks Present scenario Alternative scenario 1 The Muon Group.
M&O status and program for ATLAS LAr calorimeter R Stroynowski (on vacations)
D. Gasser ST/CV 1 Fluid distribution from UW85 Fully available now.
The LHCb Outer Tracker Front End, what does it look like and what is the status Talk for the LHCb Electronics Working Group /TS A Collaboration.
G. Carboni – Muon Meeting – April 2002 Muon Meeting LHC schedule is now official (Council Committee) First protons (Pilot run) delayed to
Electronic Systems Support Power Supply Joint Activity Chris Parkman EP Electronic Systems Support (EP-ESS) February 26, 2003.
A. Ranieri / RPC-CMS Pre-loaded profile Synchronization & Control Board (SCB) The RPC electronics will consist of the FE board plus the Synchronization.
CARDIAC meeting – 30 Sept 05 M3R3-M5R3-M5R4 FEE status.
Paolo Guglielmini - TS / CV LHCb Install Meeting - 20/04/2005 LHCb Install Meeting 20/04/05 TS / CV / Detector Cooling Installations.
cm 150 cm The Al foil is large as the M3 wall  we can put 1 raw (5 chambers) or 2 raws There is an insulating material (varnish) on the.
Status of TRD Pre-trigger System K. Oyama, T. Krawutschke, A. Rausch, J. Stachel, P. von Walter, R. Schicker and M. Stockmeier for the T0, V0, and TRD.
P. Aspell CERN April 2011 CMS MPGD Upgrade …. Electronics 2 1.
DCS meeting27.Sep.2002 Serguei Zelepoukine (IHEP, Protvino) Contents: 1. Front-end electronics: problems & solutions. 2. DCS cabling outside the ECAL detector.
Fifth CMS Electronics Week EASY: a new SY1527-based Embedded Assembly SYstem May 7th, 2003 CAEN SpA.
18 June 20031Integration Review B. Schmidt Outline: Overview of the support structures Requirements –Some details on electronics, cabling and piping Constraints.
9/18/2003Safety Review Electronics Electronics design LV, HV power supply Fusing Heat.
Status of the PSD upgrade - Problems with PSD in Be runs - Modification of cooling system - New temperature control - Upgrade of HV control system - MAPD.
October 18, Muon Meeting B. Schmidt Outline: Installation schedule under Discussion Status of Integration activities Possible modifications to the.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
February 14, Comprehensive Review B. Schmidt Outline: Status and overview of activities: –Platforms and staircases –Muon Filters and beam plugs.
GROUNDING, SHIELDING & COOLING ISSUES ON LHCb ELECTRONICS AT THE LHC PIT 8 V.Bobillier, J.Christiansen, G.Corti, D.Lacarrère, R.Lindner, L.Roy, E.Thomas,
1 13 Octobre 2011 Laurent Roy ATCA Crate / Infrastructure in place -Rack in D3: dimension -Electrical power availability -Tell1 racks running in D3 (air.
PHENIX Safety Review Overview of the PHENIX Hadron Blind Detector Craig Woody BNL September 15, 2005.
06/03/2002Ivan Hruska EP/ATE1 LV brick for TILECAL  Overview Design summary Results from 2nd radiation tests in PSI Villingen Bulk supply Plans for future.
EDR GEM - LNF 5/2/05Walter Bonivento - INFN Cagliari1 FRONT-END and HV 1)System architecture: brief summary 2)Status of chips production 3)Front-end board.
IB PRR PRR – IB System.
LHCb Install Meeting - 12 / 05 / 2004 Paolo Guglielmini - TS / CV LHCb Cooling of the sub – detectors INNER TRACKER TRACKER TRIGGER RICH 1 RICH 2 Status.
CERN – 7 Oct 04 1 LHCb Muon Grounding Anatoli Katchouk CERN Alessandro Balla, Paolo Ciambrone, Maurizio Carletti, Giovanni Corradi, Giulietto Felici, Rosario.
Power, Cooling, Cables, Simulations of Heat Dissipation Short overview of ongoing work on these points Technical Coordination (Rolf Lindner et al.) Cooling.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
TPC FEE status and more TUM Physics Department E18 I.Konorov.
LHCb Muon Station Cooling Studies (done by Ricardo Antunes Rodrigues (ST/CV)) This simulations were made for the Muon Station 1, with the follow assumptions:
1 Chamber Interfaces Adalberto Readout-, I2C-, HV-, LV-, Gas- and chamber support interface. Space issues.
1 Projectile Spectator Detector: Status and Plans A.Ivashkin (INR, Moscow) PSD performance in Be run. Problems and drawbacks. Future steps.
August 2007Andrea Gaddi, CERN Physics Dept. Detectors Infrastructures & Services Baseline to design detectors infrastructures. Tentative arrangement of.
1 26 November 2003, CERN LHCb Muon meeting Anatoli Kachtchouk (INFN Cagliari, PNPI) Final FEE-board conception proposed by Walter Bonivento Sandro Cadeddu.
DCal-ALICE integration and installation plan and status A. Tauro.
News from PNPI Presented by N. Bondar for B. Bochin Cagliari 8/10/2015.
ATLAS TRT Duke University CERN, Feb Fuse Box Status Duke University.
HF ROBOX PRR3 Apr 2003E. Hazen HF Front-End Electronics ● System Description – Overview – PMT Board, ROBOX, Patch Panel – Signal Cable, Front-end boards.
September 5, Burkhard Schmidt Integration and Installation Outline: Integration and Infrastructure issues -Suspended platforms -Cable chains -Beam.
FTK infrastructures and DCS 02/12/20101FTK Initial Design Review - A. Lanza  Crates  Single rack layout  Cabling  Rack placement  DSS  DCS.
PID meeting SNATS to SCATS New front end design
Calorimeter Mu2e Development electronics Front-end Review
PMD PMD Plans Detector Issues and solution Plans for LS1 29 June 2012.
EMU Slice Test Run Plan a working document.
ALICE Muon Tracking Upgrade EDR Answers
Pierluigi Paolucci - I.N.F.N. Naples
Pierluigi Paolucci - I.N.F.N. Naples
RPC HV&LV status Introduction HV power supply tender
Question & Suggestions March 17th
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
RPC Detector Control System
Presentation transcript:

Summary of FEE-Integration Meeting LNF, Summary of the Frascati meeting on chamber & front-end integration on 10 September 2003, provided by Adriano Lai Items discussed: - System integration - Front-end circuitry connections - Grounding - LV distribution - Cooling - Production & test of front-end boards

Summary of FEE-Integration Meeting LNF, System integration M2-M5

Summary of FEE-Integration Meeting LNF, mm "space" for cabling top hook foot  Y(Y) 2cm  2cm (Adalberto)

Summary of FEE-Integration Meeting LNF, We have a solution for racks of stations M2-M5, which provides enough space for crates and cables.We have a solution for racks of stations M2-M5, which provides enough space for crates and cables. Access to the platforms is not yet clear and a convenient solution has to be sorted out in the coming months.Access to the platforms is not yet clear and a convenient solution has to be sorted out in the coming months. The design of the tunnel is under RICH 2 is ongoing.The design of the tunnel is under RICH 2 is ongoing. We should keep pushing M1 racks into this tunnel.We should keep pushing M1 racks into this tunnel. Many pending questions for M1 (chamber and electronics) integration, installation and maintenance !Many pending questions for M1 (chamber and electronics) integration, installation and maintenance ! No resources available for integration work of station M1 at CERN !No resources available for integration work of station M1 at CERN ! A possible solution for the M2-M5 integration has been sorted out, taking into account:A possible solution for the M2-M5 integration has been sorted out, taking into account: –the system requirements –the space constraints –safety aspects (seismic stability of the system and aspects related to work on platforms at height) aspects related to work on platforms at height)  Despite some drawbacks, present solution is very appealing and agreed upon within the muon group. Manpower resources to finish drawings in time are insufficient.Manpower resources to finish drawings in time are insufficient.  Part of the production drawings have to be done outside. (Burkhard conclusions on integration) Dose reduction between a factor 10 to 5

Summary of FEE-Integration Meeting LNF, Front-end circuitry connections with the outside world From SB To next board To IB/ODE From LV (Paolo)

Summary of FEE-Integration Meeting LNF, Grounding recipes 1. Grounding à la CERN

Summary of FEE-Integration Meeting LNF, Grounding recipes 2. Grounding à la LNF Faraday cage is the reference ground Electronics ground and detector ground must be connected to FC through low impedance path Use a star structure of grounding (if possible) Faraday Cage ASDQ++ board SPB Buffer ground connection Buffer board FE ground connection LV power supply Faraday Cage Detector ground connection

Summary of FEE-Integration Meeting LNF, LV – 2. LV distribution Three possible solutions explored: 3050 A to be delivered to front-end (last estimate) 2. Radiation tolerant (switching) LVPS modular system in the cavern (EASY solution) 1. Standard (switching) LVPS modular system outside the cavern (PL500 solution) Main Generator Bridge Rectifier Superflat Mininiature transformer Voltage Regualtor Regulated output Voltage Double sinewave ON CHAMBER electronics 3. “Custom” solution

Summary of FEE-Integration Meeting LNF, Detector Cooling Counting House Area Detector Area Counting house air cooling capacity: 50kW 2MW available 1.4MW used 60kW For LV

Summary of FEE-Integration Meeting LNF, Finite elements simulation of one station Inlet Temperature [ºC]25 Max. Temperature[ºC]38 Outlet Velocity [m/s]1.0 Inlet Temperature [ºC]25 Max. Temperature[ºC]38 Outlet Velocity [m/s]1.0 Inlet Temperature [ºC]25 Max. Temperature[ºC]32 Outlet Velocity [m/s]2.0 But… How is heat dissipation inside the chamber?

Summary of FEE-Integration Meeting LNF, Production & test of front-end boards Sharing of responsibilities for front-end board test and production SPB production and test  Potenza FEB design and production  Cagliari FEB test  Potenza & Roma1 + Rio ? DIALOG test  Cagliari CARIOCAtest  CERN + Rio ? Coordinator for FEB production and test  Walter Bonivento (Cagliari)

Summary of FEE-Integration Meeting LNF, Chain tests Chain tests have been performed in the following configuration: - DIALOG - SB - IB + TB - ODE (with the exception of optical transmission) This first chain will be soon completed (October) Next step System chain with: DIALOG - 1 CANbus branch and 3 SB - 3 TB-IB - 3 ODE boards - 1 “trigger”receiver and 1 GOL receiver This is planned for the end 2003 Subsequent step: test beam, full chain with chamber and trigger system Spring 2004

Summary of FEE-Integration Meeting LNF, Milestones 1 – Prototypes for chain test SB (Roma1)Ok 100% PDM (Roma1)50% IB + TB(LNF)100% ODE(LNF + SYNC – CA)90% + SYNC 2 - Modules 0 SBok IB + TBok PDMdelayed  November 03 ODEStill needed: optical Tx, final SYNC, QPLL (CERN) 3 - Integrated circuits SYNC + CARIOCAOctober 03 DIALOG Jan 04 (Eng run delayed April 04)