Info on preliminary cabling request for LIU-PS S. Gilardoni PS-LIU 24 Feb. 2015.

Slides:



Advertisements
Similar presentations
Backwards Compatibility L4 – L2 W. Weterings LBCC - 14.
Advertisements

BI Outlook for BI Day 2012 Based on latest (last Monday) feedback from EN/EL XXX As foreseen originally Partially ‘As foreseen originally‘ Postponed.
4 November 2014 Mike Hourican TE/ABT1 LIU-SPS Injection Upgrade With input from Jan Borburgh, Bruno Balhan.
Status of SPS Ionization Profile Monitor Mariusz Sapinski, CERN BE/BI MSWG
March 7, 2007 LET Issues (Cai/Kubo/Zisman) Global Design Effort 1 Low-Emittance Tuning Issues and Plans Yunhai Cai, Kiyoshi Kubo and Michael S. Zisman.
LHC beams in the SPS in 2014 H. Bartosik, G. Rumolo, G. Iadarola With the help from K. Kornelis, V. Kain and SPS OP crew.
LIU-IONS Linac3 meeting LIU Project – Planning and Installation Julie Coupard EN/MEF-OSS.
Dog( leg )s of War Eric Prebys Run II Meeting March 13, 2003.
LS2 Other LHC Experiments Mike Lamont Thanks to: Michael Rijssenbeek (AFP) Joachim Baechler (TOTEM) Karl-Heinz Hiller (ALFA)
ATF2 beam commissioning status and beam time request Toshiyuki Okugi 2008 / 11 / 12 ATF2 Commissioning Meeting.
Installation issues - update, July 2006A.Fabich1 MERIT installation: Update July 2006 A.Fabich CERN AB-ATB July 2006.
1 st September 2005LHC-LUMI 05 - G.Arduini – CERN/AB Optical requirements for the magnetic lattice of the high energy injectors (SSPS in the SPS tunnel)
Work Effort in the LHC Injector Complex for the Upgrade Scenarios B. Mikulec Thanks to all the valuable input from the LIU project leaders and LIU work-
LIU-ABT systems: SPS B.Balhan, J.Borburgh, H.Day 20 th November 2015.
Flying Wire Update Feb 4, TEV E-11H Motor Failure Rotor coil overheated and shorted to ground. Stator Magnets.
Based on Lars’ progress report of LIU SPS BI Status of follow-up 13/10/2015Lars K. Jensen, V. Kain1.
Managed by UT-Battelle for the Department of Energy SNS Injection and Extraction Systems Issues and Solutions by M. Plum for the SNS team and our BNL collaborators.
Calorimeter calibration -Initial calibration -Gain following -Archiving.
Beam Instruments PSB + Transfer Lines B. Mikulec, J-F. Comblin.
LIU–PLI report LIU Project Team meeting. LIU - Planning & Installation Coordination Meeting Space Reservation & Engineering Change Request - Guideline.
Move 2 racks G16-RR2-4 G16-RR2-3. G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT G15-PP-01 CKT 8 G15-PP-01 CKT Power Feed.
1 Budget and spending 2013 (09/12). Project overview in APT (mid of year) 2 Part of the low EV may be attributed to the way work units have been defined.
Overview Consolidation projects for PS LIU-PS Main observable review Conclusion Acknowledgements S. Gilardoni R. Steerenberg G. Metral H. Damerau BI colleagues.
LER Workshop, October 11, 2006LER & Transfer Line Lattice Design - J.A. Johnstone1 LHC Accelerator Research Program bnl-fnal-lbnl-slac Introduction The.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
News and hot topics Impedance meeting 14/04/2014.
Electronics issues for MTE Etienne CARLIER TE/ABT Outline: o CAMAC eradication o PPM limitations o Electronics & Controls for MTE only CT only CT-MTE hybrid.
MG - APC meeting 29/02/20081 MTE commissioning strategy and requirements M. Giovannozzi What is needed to implement MTE ScheduleCommissioning Acknowledgements:
Planning of Injector Activities for Linac4-to-PSB Connection and LS2 Thanks to all the valuable input from the LIU project leaders and LIU work- package.
EHN1 – EN/EL Progress update J. Devine G. Gross 11/02/16.
EHN1 – EN/EL Planning Lighting _ Containment_ Cabling J. Devine G. Gross 11/02/16.
SPS BEAM DUMP UPGRADE FUTURE CABLING CAMPAIGNS Georgi Minchev Georgiev EN-EL-FC.
LIU EL-FC ACTIVITIES Georgi Minchev Georgiev EN-EL-FC EDMS
Status of the BI Work Package in the LIU-PSB frame Jocelyn TAN, BE-BI Thanks to the contributions of the WU holders: J. Belleman, P. Odier, F. Roncarolo,
Planned activities during (E)YETS… up to LS2 for PSB-PS equipment Etienne CARLIER On behalf of TE/ABT/EC.
Reminder of upcoming milestones For all machines: Nov. 2012:Table of performance parameters Jan. 2013: Baseline activities defined Feb. 2013: Update APT/EVM.
PS-LIU status S. Gilardoni – BE/ABP H. Damerau – BE/RF LIU-PT 27 Aug
Linac4 BCC 14/10/2010 Linac4 Measurement and Dump Lines BCC on the Linac4 Transfer Line Status.
Beam Gas Ionization monitors for SPS and PS Mariusz Sapinski, BE/BI input from: Karel Cornelis, Simone Gilardoni, Dominique Bodart, Rende Steerenberg BI_LIU.
LIU-PSB Working Group meeting: 25/06/2015, Markus Zerlauth Consolidation of magnet interlocks in the PS complex – Warm magnet Interlock System (WIC) R.Mompo,
Electrical Group Inputs for LIU-Ions J. Devine, on behalf of EN/EL.
LIU Critical Key activities in Long Shutdown 1 (2013) LIU-PSB: assuming LINAC4 connection in LS2 –Beam dump consolidation If not done: operation will be.
ELENA installation progress F. Butin / ELENA collaboration.
PS Complex Controls Renovation S Baird AB/ABP ATC/ABOC Days: Session Jan 2008.
26/11/2015 LIU-PSB meeting, Status of BE and BT kickers and septa 2 Extraction and Recombination Septa and Kickers status Jan Borburgh, M. Atanasov, W.
Summaries and conclusions of the MTE Workshop
Linac4-PSB 160 MeV connection readiness review
PS / Booster septa control
BE-CO Activities for LIU-CPS and LIU-SPS
PSB Lock Out Test, Follow-Up AP. Bernardes-/EN-STI, K
LIU – EVM status and next steps
SPS - EYETS 2016/17 Vacuum systems planning
LIU–PLI report LIU PSB meeting.
EC Activities Status for the LIU
BE-BI Software for LINAC4
LIU–PLI report LIU SPS meeting.
YETS 2017 / 2018 Leszek Borakiewicz IT-CS-DO
Injection region BLMs – ECR
Jan Uythoven For discussion
Status of the BI Work Package in the LIU-PSB frame
TE/EPC activities for YETS & LS2 LINAC 2-3, PSB, PS & TT2
WPs concerned by L4 connection:
Beam Gas Ionization Monitor (BGI)
Disabling Rules.
PSB-PS instrumentation for LIU
Potential Use of PEP-II Magnets by Project X
Example of A* A (4,0) 4 OPEN: (A4) CLOSED: ().
Open Points and More… Giulia / Michael / Sebastien / Maria.
SPS Injection BIS - Draft requirements
LIU EL-FC ACTIVITIES Updated on 28/11/2017
Presentation transcript:

Info on preliminary cabling request for LIU-PS S. Gilardoni PS-LIU 24 Feb. 2015

Introduction Goal: -Kick off the discussion on the preparation the cable requests -Start to explore with EN/EL the possibility to advance the installations during the next YETS and EYETS -Try to advance, at list partially, whenever possible, the interventions before LS2 -We will have soon a official EN/EL contact for cable matters This list reflect the current information I have but should be updated DICs should be issued as soon as possible if the information is available. Already, minimum information like the position in the tunnel of the equipments and the location of the power converters/electronics should be made available asap. If possible also the cable types. Remember also to ask for the removal of the unused or old cables.

Info available and/or that should be updated ElementSS/MUExisting install. Future installation Proposal resp. (TBC) Comment Injection bumpers J. M. CraveroRe-use existing cables New Septum J. Borburgh J. M. Cravero New bumper J. M. CraveroNew bumper New kfa45 /5345/ – tbcT. Kramer + J. Borburgh Will depend if KFA53 needed New SEM - injection MU42Not avail.BI - tbdPossible to re-use existing cables? Ionization profile monitor 82tbdM. Sapinski D. Bodart All new cables, power and aqn. Fast BLMssee EDMS tbcBI - tbdOASIS crate already there Slow BLMssee EDMS – tbcBI - tbdKeep same position as today?

Info available and/or that should be updated ElementSS/MUExisting install. Future install. Proposal resp. (TBC) Comment Skew quadrupoles - QSKtbd152 S. PittetRe-use existing cables if possible Vertical correctors - DVTtdb152 S. PittetRe-use existing cables if possible Backleg windings - DHZEvery MU152 S. PittetRe-use existing cables Low energy quads – QDF-QDE Various MU 152 S. PittetRe-use existing cables Second Ionization profile monitor tbdM. Sapinski D. Bodart All new cables, power and aqn. Insertion magnetstbd J. M. CraveroNew installation New dumps47/48 plus second location 354 – tbc354 - tbcF.X. Nuiry New wire scanners To be found Probably as today BI - tbdReplacing existing install. Need cables for bunch-by-bunch

Info available and/or that should be updated ElementSS/MUExisting install. Future install. Proposal resp. (TBC) Comment New digital LLRFna353H. DamerauAll outside tunnel e-cloud monitor98355 M. TaborelliDone during YETS