31 October 2007CARE'071 Preparation of FP7 Integration Activity Bid (2008) Superconducting RF Acceleration Systems (SRF-AS) Preparatory Group: Olivier.

Slides:



Advertisements
Similar presentations
Cockcroft/ASTeC Joint Workshop Jan 06 M W Poole ASTeC Research Strategy Mike Poole Director.
Advertisements

D.Proch EuCARD kick-off, CERN,Dec.08 WP10 SRF: SC RF technology for higher intensity proton accelerators & higher energy electron linacs.
Preparation of the IA proposals within FP7 Working group “ Novel Accelerating Systems” Erk Jensen (CERN) for the working group: Brigitte Cros (LPGP, U.
The Continuing Role of SRF for AARD: Issues, Challenges and Benefits SRF performance has been rising every decade SRF installations for HEP (and other.
Discussion on EUROTeV and ILC Nick Walker (DESY) EUROTeV Kick-off Meeting DESY 1 November 2004.
Roger Ruber, Volker Ziemann, Gergana Hamberg Uppsala University
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS TAC Lund, 8 July 2010 Roger Ruber (Uppsala University) for the ESS Linac RF Team.
Accelerator activities Brian Foster (Uni Hamburg/DESY) 1 B. Foster - Hamburg/DESY - Orsay 11/13.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement WP12: Innovative RF.
Test Stands Roger Ruber Uppsala University ESS TAC4 16 Feb
September 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE CERN September 2006.
R&D proposals for EuCard 2 EuCard2, April 21Steffen Döbert, BE-RF  SRF basic research (W. Weingarten)  CTF3 and CTF3+, possible infra - structure for.
PHIN JRA Status PHIN collaboration CARE SC meetingParis February 2004.
WP10.6 Advanced Photocathodes Developement DESYJacek Sekutowicz HZBThorsten Kamps HZDRJochen Teichert IOE MUTHenryk Fiedorowicz IPJRobert Nietubyć BNLJohn.
The Future of High Energy Physics R. Aleksan CPPM/IN2P3 and DAPNIA/CEA EPS HEP2005 Lisbon, July 23,
E.Elsen European LC Workshop, Cockcroft, UK, Jan 2007 Perspectives for European LC R&D.
EuCARD Task 10.4 Sergio Calatroni. Sub-task New and improved techniques for the production of Nb sputtered Quarter Wave (QW) cavities (CERN, INFN-LNL)
Maurizio Vretenar, CERN. Background 2  EuCARD (and CARE before it) had an enormous impact in structuring and promoting the European R&D on particle accelerators;
14 March 2007O. Napoly, at ESGARD1 Preparation of FP7 Integration Activity Bid (2008) Superconducting RF Acceleration Systems (SRF-AS) Preparatory Group.
SRF Test Infrastructure in Europe W. Weingarten with O. Brunner, S. Calatroni, B. Vullierme (CERN) and R. Eichhorn, E. Elsen, D. Gardès, J. Knobloch, G.
CARE Steering Committee and Dissemination Board R. Aleksan CARE Steering Committee Paris, April 11, Introduction.
Revised SPL-study work-plan W. Weingarten 3 May 20101SPL Cavity WG Meeting.
Global design effort DOE meeting 8/10/06 Global design effort Americas 1 FY07 DOE ILC Budget recommendations G. Dugan ILC-GDE/Cornell University GDE Americas.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement An Introduction to EuCARD-2.
Meeting of the European Global Design Effort Report from INFN non EU-funded R&D Carlo Pagani University of Milano and INFN DESY, 10 May 2006.
F. Richard LAL/Orsay 1 ELAN in 2006 Annual Meeting.
CARE SC meeting August 2005 T. Garvey JRA1 – SRF (WP 7 – 11)
JRA1 – SRF report CARE Steering Committee meeting,
Medium Beta Cavities Paolo Michelato, Paolo Pierini, and Carlo Pagani INFN Milano - LASA.
Medium beta cavities Paolo Michelato, Paolo Pierini, Carlo Pagani INFN Milano - LASA.
Global Design Effort: Controls & LLRF Americas Region Team WBS x.2 Global Systems Program Overview for FY08/09.
Progress and Plans for R&D and the Conceptual Design of the ILC Main Linacs H. Hayano, KEK PAC2005 5/18/2005.
ILC R&D at KEK Beam Control Technology –ATF –ATF2 Acceleration Technology –High-gradient Cavities L-band R&D Stand –Linac System  STF –Construction of.
April 2006 F. Richard LAL/Orsay 1 News from ELAN SC of CARE Paris April 2006.
Status of the SPL study R. Garoby – 25/11/2010 Fifth SPL Collaboration Meeting November 2010 / CERN.
Preparation of FP7 Integration Activity Bid (2008) Superconducting RF Acceleration Systems Preparatory Group: Initial group : Dieter Proch (DESY), Terry.
EuCARD-2 is co-funded by the partners and the European Commission under Capacities 7th Framework Programme, Grant Agreement EuCARD-2, ADS, linacs,
ESS Linac WP8 Radio Frequency Systems and Test Facilities ESS/SPL Collaboration Meeting Lund, 29 June 2010 Roger Ruber (Uppsala University) for the ESS.
RF programme Review for the ESGARD Roadmap to EUCARD2 Peter McIntosh (STFC) Stephane Chel (CEA) Wolf-Dietrich Moeller (DESY)
ESGARD – OMIA 10 & 11/09/2007 JRA on Sc cavities and Cryomodule for a Pulsed proton Linac Motivation Work Packages Partners & resources R. Garoby for S.
FP7: EuCARD after a year of preparation… A.Jeremie.
UK X-FEL National Laboratory Perspective Susan Smith STFC ASTeC IoP PAB/STFC Workshop Towards a UK XFEL 16 th February 2016.
H. Danared | TB12, 5 Mar 2015 | Page 1 Håkan Danared Mats Lindroos Lund, 5 March 2015 Status of In-Kind Contributions to Accelerator.
1 Comments concerning DESY and TESLA Albrecht Wagner Comments for the 5th meeting of the ITRP at Caltech 28 June 2004 DESY and the LC What could DESY contribute.
25 October 2004O. Napoly, EU-GDE meeting in Oxford 1 French Funding Agencies CNRS/IN2P3 : National research Institute on Nuclear Physics and Particle Physics.
Technical Board Report TESLA Technology Collaboration Meeting, Dec. 5 – 8, 2011, IHEP, Beijing, China TESLA Technology Collaboration Meeting, Dec. 5-8,
ILC MAC April 07 Global Design Effort 1 European Regional R&D plan Brian Foster (Oxford & GDE) MAC Meeting.
05/12/2011O. Napoly1 TESLA Technology Collaboration JLab, 5-8 November 2012 O.Napoly, CEA-Saclay TTC Chairman Collaboration Board Report.
H. Danared | Collaboration Board | Page 1 Status of In-Kind Contributions Håkan Danared Legnaro, 1 December 2014.
Thomas Jefferson National Accelerator Facility Operated by the Southeastern Universities Research Association for the U.S. Department of Energy Jefferson.
France Japan Particle Physics laboratory (FJPPL) first workshop at KEK, Tsukuba, Japan 10 th May 2007 A_R&D_3 R&D on High Power Couplers for the ILC Hassen.
Wolfgang Weingarten – CERN
WP9-SuperB in TIARA M. Biagini, INFN-LNF.
Superconducting RF Photoelectron Source -
Evolving an ILC focused SCRF Facility from the XFEL Infrastructure
Accelerator Research and Innovation for European Science and Society
PROPOSALS FOR HIGH INTENSITY – HIGH ENERGY PROTON BEAMS
Sébastien Bousson (CNRS-IN2P3-IPN Orsay)
ARIES A new Integrating Activity for Particle Accelerators
STFC Contributions to the FCC Study
Wolfgang Weingarten - CERN
SRF Gun at ELBE Work package 10, Task 7 Jochen Teichert
SRF Pb/Nb photoinjector; recent results
Superbeams with SPL at CERN
ERL2015 WG4: RF & superconducting RF for ERL
Matthias Liepe Zachary Conway CLASSE, Cornell University June 1, 2009
Nick Walker (DESY) EU GDE Meeting Oxford
EuCARD RF-Tech Meeting 2 December 2010, PSI
Olivier Napoly, coordinator CEA/Irfu
The SPL-based Proton Driver at CERN
Presentation transcript:

31 October 2007CARE'071 Preparation of FP7 Integration Activity Bid (2008) Superconducting RF Acceleration Systems (SRF-AS) Preparatory Group: Olivier Brunner (CERN), Mariusz Grecki (Polish Universities), Susanna Guidicci (INFN ), Peter MacIntosh (STFC), Trevor Linnecar (CERN), Olivier Napoly (CEA), Carlo Pagani (INFN), Vittorio Palladino (INFN), Dieter Proch (DESY), François Richard (IN2P3), Thomas Schilcher (PSI ), Alessandro Variola (IN2P3), Rebecca Seviour (STFC) + J. Knobloch (BESSY), P. Michelato (INFN), J. Teichert (FZR) Advisory Board : Terry Garvey (ex. IN2P3, PSI)

31 October 2007CARE'072 Major Milestones and Boundary Conditions: Plenary meetings of the SRF-AS Working Group : 19 December May series of local meetings (CERN, DESY, Daresbury, Warsaw, Orsay, BESSY) June 2007 : Official start of the XFEL project with contributions from DESY, Italy, Switzerland and France to the 17.5 GeV SC Linac. June 2007 : Approval of the CERN White Paper including SC-RF in the “4th Theme” (funding >= 2010) July 2007 : Approval of the “ILC Hi-Grade” CNI 5.0 M€

31 October 2007CARE'073 Consequences on the Objectives of SRF-AS:  two Main Priorities: 1. SCRF Infrastructures 2. Cavities beyond ILC Baseline, to reach  two Additional Priorities: 1. Include a Beam Experimental Program 2. Include Medium Labs, Universities, and Polish Labs Remark: SPL cavities in the scope of “HE-HI-Protons” Working Group

31 October 2007CARE'074 Major Existing Facilities DESY : FLASH Linac and TTF RF Infrastructure (CHECHIA, Clean Rooms, EP, …). CERN : SC RF Infrastructure (SM18), LHC Injectors, REX-Isolde Orsay-Saclay : SupraTech RF infrastructure (1.3 GHz MHz, CryHoLab, Coupler) Cockcroft Institute : Daresbury RF Infrastructure (ERLP  4GLS) Rossendorf FZD : ELBE Linac and SC-RF Gun (1.3 GHz) BESSY : 1.3 GHz RF (HoBiCat) TU Darmstadt : DALINAC (3 GHz)

31 October 2007CARE'075 Main Assumptions for the “Core” and “Additional Activities” Only direct costs : Manpower (70 k€/y) + Material + Travel. Overheads will be counted later. The EU request is 1/3 of the direct cost for every participant. (while the EC rule for RTD activities is maximum 75% of the total cost including overheads)

31 October 2007CARE'076 Proposal for a JRA Structure for a Superconducting RF Acceleration Systems (SRFAS) Integrated Activity including all the Letters of Intend: JRA1 : High Gradient Cavities (Dieter Proch) JRA2 : Cavity Prototypes (Peter McIntosh, Matteo Pasini, Jacek Sekutowicz) JRA3 : Thin Films (Bernard Visentin) JRA4 : Accelerator and Beam Studies (Roger Jones, Mariusz Grecki, Jochen Teichert) JRA5 : RF Test Infrastructures (Wolfgang Weingarten) OMIA Speakers : Green : describe (defend) their proposal Purple : review (evaluate) the proposals

31 October 2007CARE'077 Proposal for a JRA Structure for Superconducting RF Acceleration Systems (SRF-AS) merged into a single Integrated Activity : JRA : “SRF Too” WP1 : SC Cavities WP2 : Accelerator and Beam Studies WP3 : RF Test Infrastructures as presented at the ESGARD Meeting with the Lab Directors on October 15, 2007 with the aim to negociate ~5 M€ out of the 8 M€ of additional activities

31 October 2007CARE'078 Proposal for Core Activities (15 M€)Core

31 October 2007CARE'079 Proposal for Core Activities Breakdown of the M€, total direct costs

31 October 2007CARE'0710 Proposal for Additional Activities (8 M€) 1st Priority

31 October 2007CARE'0711 Proposal for Additional Activities Breakdown of the M€, total direct cost

31 October 2007CARE'0712 Activities Left Out : 10.9 M€

31 October 2007CARE'0713 Proposal for Thin Films Activities About 1.5 M€ is saved for Thin Film Activities (i.e. 0.5 M€ from EU) to serve a large community of interested laboratories. But the Proposals from CERN, IPJ, Roma2, Roma3, DESY, LNL and need to be re-organized around the following principles: 1.There are 2 rock-solid users for Thin Film Cavities : a) LHC Ring for 400 MHz elliptical cavities b) Rex-Isolde for 101 MHz Quarter-wave cavities both using the Nb/Cu magnetron sputtering technique. 2. There are proposals for alternative, not yet proven, Nb/Cu coating techniques: a) arc coating (cf. CARE/SRF), successful for Pb/Nb photocathode b) “enhanced” magnetron sputtering c) atomic layer deposition 3. There are proposals to coat new materials, e.g. A15 High Tc superconductors to increase E peak and Q0 4. There is a rich network of coating, characterization and RF test facilities across Europe I have invited Mats Lindroos (CERN) to build a new proposal along these principles

31 October 2007CARE'0714 Proposal for SCRF Gun Beam Tests at ELBE FZD at Rossendorf is offering to use their ELBE linac beam time, including the SCRF Gun (CARE/PHIN) and Beam Line diagnostics, to develop new SCRF Gun concepts: 1.Polarized electron gun 2.Emittance compensation methods 3.SCRF Gun experiments for a Total Cost of 630 k€ Items removed: 4.LASER pulse shaping 5.New large grain RF cavity

31 October 2007CARE'0715 Proposal for Network of RF Test Infrastructures Total k€ Generic 3301 k€ 352 MHz 84 k€ 400 MHz Thin Films 135 k€ 704 MHz 1859 k€ 1.3 GHz 910 k€ CERN 4013 k€ 1935 k€84 k€135 k€1859 k€- SupraTech LAL Orsay 775 k€ 415 k€ k€ SupraTech IPN Orsay 668 k€ ---- SupraTech Saclay 833 k€ 283 k€ k€

31 October 2007CARE'0716 Revised Proposal for a JRA Structure for Superconducting RF Acceleration Systems (SRF-AS) merged into a single Integrated Activity : JRA : “SRF Too” WP1 : SC Cavities WP2 : Accelerator and Beam Studies WP3 : RF Test Infrastructures as presented at the CARE’07 Meeting on Oct. 31, 2007

31 October 2007CARE'0717 Proposal for SRF2 Activities (14.8 M€)SRF2 521 k€ withdrawn 109 k€ withdrawn

31 October 2007CARE'0718 Proposal for Core Activities Breakdown of the M€, total direct costs

31 October 2007CARE'0719 Proposal for Networking Activities Networking Activities on “RF Design and Technology” : 1. LLRF Activities (DESY, CERN, Cockroft, Lodz- Warsaw- Krakow Universities, PSI, IN2P3, CEA ? …) 2. High Power L-Band Klystron (CERN, CEA, IN2P3, Thales ED, DESY ?, …) 3. RF Power Distribution (CERN, …) 4. RF Cavity Design ( …) with the aim of sharing general knowledge: new techniques, advances, defining EU standards, hardware and software developments, etc…

31 October 2007CARE'0720 Proposal for a Trans National Access FLASH-TTF with a budget < 500 k€ with the aim to provide travel expenses for Visitors to run experiments at FLASH (DESY) and/or to test cavities in TTF RF Infrastructure. Withdrawn by DESY : too much organisation and paper work for a small benefit.