Room 105 Status and Laser project update Brachmann.

Slides:



Advertisements
Similar presentations
______s Room Budget Created by:. My New Room I plan on purchasing _____ items for $ ____________.
Advertisements

June 8, 2011 Irvine Unified School District. What is a Modernization? Eligibility Permanent buildings - 25 years old Portable buildings - 20 years old.
CEBAF Photoinjector: What’s new, what’s the same since HAPPEx 2004? What needs to be done? M. Poelker, HAPPEx collaboration meeting, Feb. 18, 2005.
May 6, 2010 Irvine Unified School District HMC Architects.
FT-ICR Facility Safety Update. Updates to prior policies: Lab spaces have been classified as “safety glasses required at all times”
NLCTA Laser Safety System Overview 9/12/05 Laser Room Hazards: Installed and operational now: IVNd:YVO 4, CW, 532 nm, 5 Watt IVTi:Sapphire, 79 1/3 MHz,
CTF3 Laser Status Massimo Petrarca CLIC January
1 Stefan Moeller 1 AMO Instrument Schedule ARR AMO Instrument Schedule Stefan Moeller – XES Manager June 30, 2009.
1 MICE Project Report, paul drumm, 9 march 2005 CM Highlights & Tasks… –Tracker base line – scintillating fibres – performance validated –TOF performance.
ILC Polarized Electron Source Annual DOE HEP Program Review June 5 – 8 International Linear Collider at Stanford Linear Accelerator Center A. Brachmann,
Phase Difference = Phase Difference = 0.05.
David Saenz FAC November 11, 2008 SLAC National Accelerator Laboratory 1 Far Experimental Hutches David Saenz Project Manager.
Linac Laser Notcher Status David Johnson Todd Johnson, Vic Scarpine, Andrea Saewert, John Sobolewski PIP Meeting March 6, 2013 Beams Doc 4306.
G v1 Squeezer Update Review August 25, 2009 H1 Squeezer Experiment ANU, AEI, MIT, CIT and LHO collaboration.
4/25/11 G v3 1 Facility Modifications and Preparations (FMP) Technical Status Annual NSF Review of Advanced LIGO Project April , 2011 John.
Herschel Space ObservatoryPACS Science Verification ReviewMPE 22/23 June 2006 GJ / MPE 1 PACS Test Facility Capabilities – Cryogenics and OGSE Gerd Jakob.
CTF3 Collaboration meeting – CERN, January 2007 Laser system schematic 22 44 1.55  s 200  s, 5-50 Hz 15 kW 10  J 270  s ~2332 pulses 370.
Current status of Laser development 2nd Korea - Japan Workshop on KAGRA 2012/5/28(Mon)
Isao MATSUSHIMA, Hidehiko YASHIRO, Toshihisa TOMIE National Institute of Advanced Industrial Science and Technology (AIST) C , Umezono, Tsukuba,
Project Status Update Mark Petree LCLS Self Seeding Status: Management put it on hold. – Preliminary conceptual design completed – Interference.
赴国际水稻所访学情况汇报 长江大学农学院 邢丹英 2010 年 6 月. 学习目的 学习时间、地点 学习内容 学习收获 几点体会 汇报提纲.
EO sampling technique for femtosecond beam characterization
AWAKE E. Gschwendtner, EATM, 1 July Highlights Since April 2015 Cabling, piping and rack installation campaign for the AWAKE facility has started.
Yb:YAG Regenerative Amplifier for A1 Ground Laser Hut Rui Zhang ACCL Division V, RF-Gun Group Nov 20, 2015 SuperKEKB Injector Laser RF Gun Review.
Thomas Jefferson National Accelerator Facility G0 Collaboration Meeting, June 18-19, 2003 Updates G0 Tiger Laser High Polarization Photocathodes Mott polarimeter.
Laser System Upgrade Overview
SDC Update June 5, SDC Update – June 2012 Investment Plans submitted to OCIO for approval – Core Network – Firewall – Storage OB2 Heat Reduction.
Global Design Effort 1 Polarized electron source update Axel Brachmann, John Sheppard, Feng Zhou, Takashi Maruyama, -SLAC- Matt Poelker -Jlab- LCWS/ILC.
International Linear Collider at Stanford Linear Accelerator Center 9/13/2006 Americas Regional Team FY08-09 Planning Meeting 1 1/11 ILC-Americas FY08-09.
Modify Existing Scanning Electron Microscope (SEM) SEM FE Probe Surface Science Study L. Laurent, S. Tantawi, R. Kirby *This research is funded by the.
Review of e- source for the low power Option and status update Axel Brachmann, John Sheppard BAW2, SLAC 1/18/2011.
PIP Update June 18 th Agenda Summary Update – Current Activities/Updates – Reid, Slabaugh.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
Integration and Installation Status for Collaboration Meeting Ans Pardons, 29/9/2015.
Operated by the Southeastern Universities Research Association for the U.S. Dept. of Energy Thomas Jefferson National Accelerator Facility FEL Power Achieved.
CEBAF Polarized Electron Guns Marcy L. Stutzman for the Jefferson Lab Polarized Source Group.
DOE 8/21-22/06R. Prepost1 DOE REVIEW TASK C Aug , 2006 * WORK AT SLAC – Babar & ILC R. Prepost Faculty S. Dasu Faculty H. Band Senior Scientist K.
Page 1 Polarized Electron Sources for Linear Colliders October, 2010 A. Brachmann, J. C. Sheppard, F. Zhou SLAC SLAC October 18-22, 2010.
TILC Electron Source Update A. Brachmann, J. Sheppard, F. Zhou -SLAC – M. Poelker - Jlab - TILC, Tsukuba, April 2009.
南水北调东线第一期工程山东段 情况简介. 主要汇报内容 二、南水北调山东段工程总体布置 三、山东段工程项目划分及工程主 要建设内容 一、南水北调东线工程概况 四、前期工作及工程建设进展情况 五、工程总投资.
基 督 再 來 (一). 經文: 1 你們心裡不要憂愁;你們信神,也當信我。 2 在我父的家裡有許多住處;若是沒有,我就早 已告訴你們了。我去原是為你們預備地去 。 3 我 若去為你們預備了地方,就必再來接你們到我那 裡去,我在 那裡,叫你們也在那裡, ] ( 約 14 : 1-3)
26 April, 2016 LCLS II Cryomodules and Cryoplant, Joe Preble LCLS-II Overview JLAB Organization for LCLS-II JLAB responsibilities & Schedule and Status.
Nd:YAG Solid Laser Xiangyu Zhou 20. Nov Yb fiber laser system on the ground Menlo 1030nm oscillator Grating stretcher (Transmission) SOA pulse.
PIP Update Sept Agenda Summary Update – Current Activities Updates/Talks: Ken Domann - Schedule Update and Statusing Ryan Crawford - Linac MCC/Transformer,
Optical Cavity construction at LAL  2000 : polarimeter at HERA 2-mirror cavity cw ND:YAG laser, F=30000 (  ~ )  2005 : Ti:sapph pulsed laser.
November 17, 2008 A. Brachmann Slide 1 ILC polarized Electron Source R&D Update LCWS 2008 A. Brachmann, J. Sheppard, F. Zhou - SLAC National Accelerator.
LEReC System 1. Project Schedule 2015 shutdown COMPETE! Move beam line equipment from IP 01:00 Install cooling section beam line 2016 shutdown Install.
PIP Update June 17 th Agenda Summary Update – Current Activities – Updates (Matt – Cavity Refurbishment) – Additional Meetings/Notes.
Date of download: 9/18/2016 Copyright © 2016 SPIE. All rights reserved. Schematic of the OPCPA laser system at Sandia National Laboratories. A stretched.
Yb:YAG Regenerative Amplifier for A1 Ground Laser Hut Rui Zhang ACCL Division V, RF-Gun Group Nov 20, 2015 SuperKEKB Injector Laser RF Gun Review.
Laser System Upgrade Overview
E- source R&D update ILC source laser project Faraday rotation experiment A. Brachmann 05/07/07 SLAC R&D meeting.
Polarized e- Source Design and R&D 10/24/05
Nd:YAG Solid Laser 3-2 / A-1 on the ground
Principle of Mode Locking
RF-Gun for Phase-II RF Gun 10, June, 2016.
Cryoplant Installation Design Summary
Inspection Metrics Gerry Fallon.
Слайд-дәріс Қарағанды мемлекеттік техникалық университеті
.. -"""--..J '. / /I/I =---=-- -, _ --, _ = :;:.
LERF Cryomodule Testing Facility – Accelerator Systems Deliverable
Kansas Light Source Laser System J. R. Macdonald Laboratory
II //II // \ Others Q.
Велики откриватели и пътешественици
I1I1 a 1·1,.,.,,I.,,I · I 1··n I J,-·
Around the room Orders of operations.
Time of flight measurement of femtosecond ablation of graphite
. '. '. I;.,, - - "!' - -·-·,Ii '.....,,......, -,
Electro-Optical Modulation Nonlinear Optics Techniques Self Focussing
Project Update – High School Additions & Remodeling
Presentation transcript:

Room 105 Status and Laser project update Brachmann

Temperature and Humidity Relative Humidity [%] Temperature [F]

HVAC System Schematic

Laser Safety System and other news Laser Safety System installation has been completed Inspection by Ted Fieguth today SOP will be approved today (I hope) ELS laser (pump for source) has been ordered Delivery is due end of June

Laser development work plan Install MIRA and MILLENIA to room 105 Test 3 MHz Pockel’s cell ELS laser will be shipped to KM Labs to aid in Ti:Sapphire amplifier development –so far 200 kHz regenerative amplifier (non cryogenic) at ~ 5  J with 10 W pump; limitation is Pockels cell ELS laser will be shipped to SLAC and (budget dependent) amplifier will be purchased KM Labs is planning to apply for SBIR phase II