MICE CM32 25 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.

Slides:



Advertisements
Similar presentations
MICO Meeting Magnetic Field Shielding Issues 11 th July 2012 Mike Courthold 1.
Advertisements

West Wall Compressor Requirements West Wall Mezzanine Move compressors to the West Wall to distance from magnetic field Find compressor position on West.
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Status of the AFC at RAL Tom Bradshaw John Cobb Wing Lau Matt Hills Elwyn Baynham Mike Courthold Victoria Bayliss MICE Project Board 28 th June 2011.
MICE: Hall Infrastructure Chris Nelson CEng CM16 8 th Oct 2006.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
Global Magnet Systems including Field Mapping MICE Project Board 28 th June 2011 M Courthold – RAL R Preece - RAL.
paul drumm; 3rd December 2004; AFC MM 1 Cost & Schedule Review I Terms of reference: –To review the Cost and schedule of the MICE Muon beam –To review.
Status report about the e-  identifier Study of shielding against the stray magnetic field at the downstream end of the spectrometer F. Huveneers, Gh.
1 Status of infrastructure MICE Video Conference, August 17, 2005 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department.
May 12, 2004 TJR1 Effects of Downstream Iron Shield Position on MICE Good- Mu+ Rates Tom Roberts Illinois Institute of Technology May 12, 2004.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
Vacuum and cryogenic systems in R5.2 for MICE Presentation to the MICE/ISIS Operations meeting on 16/03/2015.
Electrical & Control CM40 Daresbury Laboratory. CM40 Electrical Infrastructure Update RRM2 Latest Latest on Installation Progress Rack Allocations Racks.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
Major items from field affected component list MICE Magnetic shielding review C.Macwaters 23/9/13.
MICE CM30 Magnetic Shielding Update Mike Courthold 6 th July
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
MICE - UK Project Progress Roy Preece 30 th April 2013.
Shielding the Weiner PSU 7 May 2013 Kiril Marinov ASTeC, MaRS, DL 1.
K. Long, 2 December 2014 Spokesman’s update 1. Contents: Update Step IV – Installation and commissioning – Preparations for data taking Shift tool; CHEESE.
MICE CM30 Magnetic Shielding Update Mike Courthold 6 th July
MICE MICE Magnet Modelling - Presentation to the Daresbury Magnetics Group Daresbury Laboratory 31 st January 2013 P J Smith University of Sheffield.
1 MICE - INFRASTRUCTURE MICO meeting 7 th February 2008 Tim Hayler.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE Integration Engineering Jason Tarrant - STFC l Contents »South Mezzanine change summary »Integration Envelope Model »A/C Move »Maus Geometry »AFC.
Preparations in the MICE hall Video Conference 25 th June 09 Tim Hayler Andy Lintern Peter Lau Geoff Barber.
Magnetic Shielding Issues Roy Preece STFC - RAL. Overview Issues Items in harms way – Step IV Step IV mitigation plan –Racks –Compressors Current / Future.
RSLR mtg 28/3/2014 RLSR mtg Alan Grant. 2 RLSR mtg 28/3/ MICE Finances - Forward Look.
MICE CM32 8 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1.
Magnetic Shielding Roy Preece. Issues Cooling channel initially designed without return yolks. Current North and South shielding walls designed to encapsulate.
MICE Specification of the Stray Field Issue and the MICE Hall Model P J Smith 23 rd September 2013.
1 Layout and Installation MICE Collaboration Meeting, RAL, October 27-29, 2004 Elwyn Baynham, Tom Bradshaw, Paul Drumm, Matthew Hills, Yury Ivanyushenkov,
Magnetic Mitigation - Contents l Magnetic Mitigation General l West Wall Compressors l Rack Room 2 l Magnetic Shielding Yoke Jason Tarrant – Integration.
MICE magnetic measurements: AFC considerations Alain Blondel see a previous discussion for reference in CM35 (Feb 2013 slides by V. Blackmore, A. Blondel.
Global Magnet Systems including Field Mapping and Infrastructure Vacuum System MICE Project Board 8 th March 2012 M Courthold – RAL R Preece – RAL P Hanlet.
1 MICE Hall construction status Richard Apsimon MICE VC meeting 29th Nov 2007.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l History l Requirements l Environment l Design l Structural Integrity l Preparation l.
MICE VC 10-Oct-2013 Alain Blondel 1 MICE NEWS VC 162 LOTS OF THINGS HAPPENED! have arrived at RAL: -- EMR (see report today) -- AFC2 see pictures -- SS2.
1 MICE Hall and Infrastructure - Progress since CM18 Chris Nelson MICE CM19 Oct 2007.
1 Target Station Design Dan Wilcox High Power Targets Group, Rutherford Appleton Laboratory EuroNu Annual Meeting 2012.
11 Nov 2008PC Analysis PC Schedule 2008 Tuesdays fortnightly 9 September  23 September  2 October  CM22  11 November  25 November 9 December.
Project Managers Report CM40 Collaboration Board – Rome Roy Preece 28 th October 2014.
MICE CM31 Magnetic Shielding Update Mike Courthold 1.
UK Update Package Managers Meeting 001 Roy Preece 13 th January 2014.
MICE Oversight Committee Meeting RAL, 24 April 2014 Paul Soler on behalf of the MICE Collaboration Status of MICE and Spectrometer Solenoids.
PRY Base - Contents l PRY Support/Base/Platform in the MICE Hall l Requirements l Environment l Design l Structural Integrity l Preparation l Installation.
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
1 Search for Worst-Case Forces MICE Video Conference, September 8, 2004 Yury Ivanyushenkov Applied Science Division, Engineering and Instrumentation Department,
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
MICE hydrogen review Introduction to MICE. After the LHC… Many open questions in physics: Gravity & standard model Matter-antimatter imbalance Dark matter.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Andrew Moss ASTeC TIARA Mid term meeting 12 th 14 th June 2012 CIEMAT ICTF Progress on the MICE RF System.
Reducing the Iron in the Endcap Yoke of CLIC_SiD Benoit Curé, Konrad Elsener, Hubert Gerwig, CERN CERN, June 2014 Linear Collider Detector Magnet Meeting.
Contents Jason Tarrant STFC Aim of Presentation to show: l Problem of compressors located at south shield wall l Description of compressor layout and services.
MICE CM33 – system test? Alain Blondel 1 CM 33 wrap-up TOWARDS CM34.
OsC mtg 15/10/2014 MICE Step IV Alan Grant. Content Step IV – Construction Status – Finances – Schedule – Risks – Summary 2.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE Absorbers work package MPB – 17/04/15 RAL Tom Bradshaw Vicky Bayliss Mike Courthold Matt Hills Andy Nichols Roy Preece Mark Tucker Steve Watson.
Comparing different item modelling techniques for Racks and Compressor fields Model 31,34,35,38,39 Step IV Solenoid, 240MeV/c.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
Shielding the turbomolecular pump and the vacuum gauge 11 June 2013 Kiril Marinov ASTeC, MaRS, DL 1.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
MICE CM28 Engineering Session Summary (On behalf of Wing)
Outcome of the Review and Response to Recommendations
Aims of modelling in R9 General validation of model
Specification of the Stray Field Issue and the MICE Hall Model
CM 34 RAL 17th – 19th October 2012 P. J. Smith
Control Racks Behind Nth Shield Wall modelled with
Presentation transcript:

MICE CM32 25 th February 2012 Magnet Group Report Vicky Bayliss Victoria Blackmore John Cobb Mike Courthold Roy Preece Mike Zisman 1

Conclusions from CM32 Started to identify magnetically-sensitive components within the Cooling channel volume Used the TRD Magnetic-Shielding model to predict the magnetic field and potential shielding requirements in specific areas Adapted the model the predict the effect of inserting significant ferrous objects into the Cooling Channel 2 Predicted fields without ferrous content Predicted fields with ferrous content

Magnet Group Tasks since CM32  Finding solutions for Step IV 15 compressors Magnet control Rack Electrical racks on the North Mezzanine extension  Considering solutions for Step VI  Understand the full extent of the shielding issues, by: Gathering information on ferrous objects, or objects which may not operate in high fields 3

Step VI: Compressors 4

Step IV: Compressors 5

Step IV: Magnet Control Racks Simplified solution shows it is possible to shield in 5mm US1010 iron and 5mm mu- metal if Aluminium racks are used. In reality, we will need to provide protected access (labyrinth or air-lock style) to allow access during magnet operation. 6 This implies serious modifications to the positions of magnet control racks, their services and the entrance to the trench.

Step IV: Electrical Racks on North Mezzanine 7 -4 racks located on the north mezzanine -5mm US1010 iron and 5mm mu-metal if Aluminium racks are used. -Estimated weight 3-5 tonnes – requires major modifications to the north mezzanine

Step VI Solutions 8 Modelling shows that it is not reasonably possible to shield the compressors or electrical racks in their currently proposed locations. We need to consider: -Compressors moved behind the beam stop, which would still require shielding, or against the west wall -Electrical racks...??? -What else?

Information Gathering What we know we need to consider: EMR control rack Vacuum system control racks Power supplies for conventional magnets Tracker system Hydrogen system Vacuum system PPS system Etc... For every magnetically-sensitive object in the MICE hall, we need to know: Location (X, Y and Z coordinates w.r.t. Beamline centre in Step VI) Approximate object dimensions Mass of any ferrous material Sensitivity of components to magnetic fields 9

Conclusions 10 Magnetic Field distortion Previous analysis and reports overlooked massive distortion in magnetic field profile caused by presence of ferrous objects including magnetic shielding! EG: Magnetic field in air in compressor locations ~ 30mT, which becomes 1.7T when ferrous content of cabinet and shielding taken into account. What about a partial yoke? (Pierrick’s suggestion) Forced to reconsider possibility of partial yoke around Cooling Channel magnets Substantial issues re beam physics, forces, weight, and access for services and maintenance, etc. Focusing on a Step IV solution Will still require considerable engineering compromises & effort to achieve, as well as substantial additional analysis by Vicky & Mike