PROPOSED BULK WATER TARIFFS for 2010/11 BUSHBUCKRIDGE WATER Presented By: Mr. P Ngomana- Chairperson Mr. Mapholoba A Letswalo- Acting Chief Executive.

Slides:



Advertisements
Similar presentations
1 Implementation of Water Services Economic Regulation DWA WP10540 Framework for Economic Regulation of Water Services in Municipalities 14 June 2013.
Advertisements

DRAFT 2009/10 TO 2011/12 MEDUIM TERM REVENUE AND EXPENDITURE FRAMEWORK BUDGET.
Regional Bulk Infrastructure Grant / Programme (RBIG) Grant and Policy
OVERVIEW ON THE MUNICIPAL GUIDELINE,BENCHMARKS
REPORT ON THE ANALYSIS OF MUNICIPAL BUDGETS FOR THE 2004/2005 FINANCIAL YEAR.
1 COMMENTS ON THE TARIFF CONSULTATION PROCESS AND DEBT OWED BY MUNICIPALITIES TO WATER UTILITIES SALGA’S INPUT TO THE PORTFOLIO COMMITTEE ON WATER AFFAIRS.
Tariff Determination CFO Forum - 6 September 2013 Shireen de Visser.
PRESENTATION TITLE Presented by: Name Surname Directorate Date BRIEFING THE PORTFOLIO COMMITTEE ON WATER AND SANITATION ON BULK WATER TARIFFS INCREASES.
Financial Accounting 1 Lecture – 33 Question Following trial balance has been extracted from the books of Javed Furniture Manufacturers on June 30, 2002.
About Presentation About Rand Water Rand Water and MDGs Economic Policy and Implications Rand Water and its Role in Africa Conclusion.
1 Georgian National Energy and Water Supply Regulatory Commission Tariff Regulation Gocha Shonia Department of Methodology and informational provision.
1 27 March 2013 MYPD3 Briefing Session – Portfolio Committee on Energy.
O V E R B E R G W A T E R. 1.AREAS AND MUNICIPALITIES SERVED, ACHIEVEMENTS AND CHALLENGES  Relationship with Municipalities  Non-Financial Performance.
READING OF COMPANY ACCOUNTS Fundamentals of Auditing Day 7 Session I to IV Slide 7.1.
Challenges, Constraints and Limitations.  Water Services Act  Absence of independent regulator  12 active Water Boards  3 Recent disestablishments.
1 WATER BOARDS AND WATER TARIFFS Water boards are established in terms of the Water Services Act, 1997, as organs of State. They are categorised as National.
Rand Water Parliamentary Portfolio Committee Water Affairs & Forestry
MYPD2 SACCI VIEWS AND RECOMMENDATIONS TO NERSA 21 January 2010 Peggy Drodskie Executive Advisor to the CEO.
WATER TARIFF VALUE CHAIN Setting of Raw Water, Bulk Water and Retail Water Tariffs Presentation to the Parliamentary Portfolio Committee Mahomed Vawda.
PRESENTATION TO PCWEA – 17 APRIL OVERVIEW OVERVIEW  Established in 1997 by the Minister of Water Affairs and Forestry in accordance with the.
Water is our Passion LEPELLE NORTHERN WATER BUSINESS PLAN, ANNUAL REPORT AND BULK WATER TARIFFS Ms N.J. Manthata (Finance Chairperson) Mr L.A. Leballo.
1 Electricity Industry – Municipal Tariff Issues and NERSA Approval Processes Compiled by Nhlanhla Ngidi.
Click to edit Master subtitle style Bulk Water Tariff Review 2013/14 17 APRIL 2013.
PRESENTATION TO PARLIAMENT 14 May Amounts allocated as per the DORA.
Programme Financial Implications for Municipalities Eskom’s view on how to establish the financial impact of restructuring - as input to the EDIH.
DEPARTMENT OF MINERALS AND ENERGY Parliamentary Portfolio Committee Briefing in respect of ELECTRICITY BASIC SERVICES SUPPORT TARIFF (EBSST) 06 SEPTEMBER.
PRESENTATION TO THE PORTFOLIO COMMITTEE ON WATER AND ENVIRONMENTAL AFFAIRS 5 MAY 2010 Presenters: Mthobeli Kolisa – Executive Director: Municipal Infrastructure.
Submission to NERSA on Revised Eskom MYPD2 Chemical and Allied Industries Association January 2010.
Water Sector Value Chain Pricing and LG Water Funding Research Seminar on tariffs, costs & regulation in LG water services Victor Ngobeni, National Treasury.
Click to edit Master subtitle style Briefing by Rand Water: Analysis of Annual Report ~ Presentation to Portfolio Committee ~ 5th May 2010.
Generation Costs. Fuel InputProcess (Generating station) Electrical Energy output Cost of Electrical energy = Cost of fuel + processing cost.
BLOEM WATER REPORTING STRATEGIC (BUSINESS) PLAN, ANNUAL REPORT 2009/2010, BUDGET AND 2011/2012 TARIFF INCREASES PRESENTATION TO THE PORTFOLIO COMMITTEE.
The Association of Municipal Electricity Undertakings (Southern Africa) NERSA Public Hearing Municipal Tariff Guideline, Benchmarks and Timelines /12.
Water is our Passion Click to edit Master subtitle style 5/30/11 PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE LEPELLE NORTHERN WATER STRAT PLAN, ANNUAL.
1 WATER BOARDS TARIFF INCREASES: IMPACT AND IMPLICATIONS ON LOCAL GOVERNMENT STRUCTURES BY MTHOBELI KOLISA EXECUTIVE DIRECTOR:MUNICIPAL INFRASTRUCTURE.
MUNICIPAL MANAGERS FORUM NORTHERN CAPE JUNE 2015.
1 Local Government Budgets and Expenditure Review 2001/02 – 2007/08.
GOVERNMENT OF THE KINGDOM OF LESOTHO Water and Sewerage Company (WASCO) Greater Maseru Water Supply Feasibility Study & Preliminary Design Results of Financial.
Electricity Sector April Electricity sector in perspective Electrification of households is one of Government’s priority programmes The country.
BULK WATER TARIFFS OF BUSHBUCKRIDGE WATER Presented By: Ms. TP Nyakane Maluka - Chairperson Mr. MA Letswalo- Acting Chief Executive.
1 BOTSHELO WATER 2007/08 Annual Report. 2 Contents 1. Overview 2.Provision of Water Services /08 AFS 4. Intervention – Organisational Diagnosis.
PORTFOLIO COMMITTEE ON WATER AND ENVIRONMENTAL AFFAIRS MAHOMED VAWDA Acting Chief Director: Institutional Oversight Dept of Water Affairs Dept of Water.
Operating Efficiencies Costs to operate and maintain the water and sewer system have not varied significantly during the first 5 years of operation.
Rand Water TARIFF CONSULTATION OCTOBER DWS / TCTA raw water pricing30 th September 2016 Customer consultation and information sharing Consultation.
TARIFF CONSULTATION PROCESS
BUSHBUCKRIDGE WATER ANNUAL REPORT FOR 2009/10 TARIFF 2011/12 AND
BULK WATER TARIFF PRESENTATION TO PARLIAMENT – CONCLUSIONS OF SALGA RELATING TO WATER BOARD TARIFF INCREASES ON THE BASIS OF SECTION 42 OF THE MUNICIPAL.
Annual report for the 2014/15 financial year
PRESENTATION TO PORTFOLIO COMMITTEE ON WATER AFFAIRS AND FORESTRY
H PIENAAR: ACTING DDG-P&R and SILAS MBEDZI:CHIEF DIRECTOR
COMMENTS ON THE DEBT OWED BY MUNICIPALITIES TO WATER BOARDS SALGA INPUT 20 MARCH 2007 BY WILLIAM MORAKA.
Rand Water TARIFF CONSULTATION OCTOBER 2016.
BULK POTABLE WATER TARIFFS SETTING FORUM Raw Water Use Charges for 2018/19 Financial Year 18 October 2017.
Major Vaal River Consultation Meeting Raw Water Use Charges for 2017/18 Financial Year 12 September 2016.
Major Vaal River Consultation Meeting Raw Water Use Charges for 2017/18 Financial Year 12 September 2016.
City of Rehoboth Beach Water and Wastewater Financial and Rates Review
Public Hearing on Municipal Tariff Guideline Increase for 2007/08 Financial Year
Raw Water Use Charges for 2016/17 Financial Year
STANDING COMMITTEE ON APPROPRIATIONS
Major Vaal River Consultation Meeting Raw Water Use Charges for 2019/20 Financial Year 24 October 2018.
Annual Report 2008/09 Albany Coast Water Board Presentation to the Parliamentary Portfolio Committee on Water and Environmental Affairs.
MASILONYANA LOCAL MUNICIPALITY
Business Costs.
MHLATHUZE WATER presentation to Portfolio Committee
Overberg Water Board Annual Report 2015/16 Financial year
BULK POTABLE WATER TARIFFS SETTING FORUM Raw Water Use Charges for 2018/19 Financial Year 02 November 2017.
Presentation transcript:

PROPOSED BULK WATER TARIFFS for 2010/11 BUSHBUCKRIDGE WATER Presented By: Mr. P Ngomana- Chairperson Mr. Mapholoba A Letswalo- Acting Chief Executive

INPUT COST OF BULK WATER RAW WATER CHARGES COST OF RAW WATER SUPPLIED FROM DWAF DIRECT STAFF & LABOUR COST ALL DIRECT COST OF STAFF WHO ARE RESPONSIBLE FOR O&M OF SCHEMES & PLANT DIRECT ELECTRICITY & ENERGY COST ESKOM CHARGES FOR BOTH CAPACITY & USAGE FOR PUMPING, PURIFICATION & PLANT LIGHTING CHEMICALS FULL COST OF CHEMICALS USED FOR DOZING OF WATER MAINTENANCE COST OF ROUTINE MAINTENANCE OF PLANT & EQUIPMENT

INPUT COST OF BULK WATER REFURBISHMENT COST OF SUBSTANTIAL REPAIR OR REPLACEMENT OF PLANT & EQUIPMENT WHICH DOES NOT FORM PART OF ROUTINE MAINTENANCE OVERHEAD ALLOCATION PORTION OF HEAD OFFICE AND OTHER INDIRECT COSTS ALLOCATED TO EACH SCHEME The following financial assumptions were considered: ASSUMPTION ActualEstimatedBudgetProjected 08/0909/1010/1111/1212/1313/1414/15 CPIX10.3%6.9%6.0%5.7%5.2%5.0% Salaries and wages12.5%10.9%10.0%9.5% 9.0% Interest rate13.4%10.3%10.0%10.5% 11.0%11.5% Energy cost27.5%31.3%24.8%25.1%25.9%33.1%

TARRIF STRUCTURE Cost structure Keys = VC: Variable cost = FC: Fixed cost = FC: Fixed cost m3/year Amount% Amount p/m Raw Water (vc) Electricity (vc) Maintenance (vc) Chemicals (vc) Refurbishment (vc) Capex (vc) Salaries (fc) Administration cost (fc) TOTAL

TARRIF APPORTIONMENT  Variable Cost ComponentR1.69 (Raw water, Electricity, Chemicals, Maintenance)  Fixed Cost ComponentR1.76 (Salaries and Admin Cost) Proposed tariff for 2010/2011R3.45 Proposed tariff for 2010/2011R3.45 NB* = Proposed tariff review, due to upgrading of certain water works Average for year ending 30 June ActualBudgetProjected 09/1010/1111/1212/1313/1414/15 Bulk Water Tariff DWA Bulk Potable Water Tariff BWB * 3.87* 4.06* 4.27* 4.54

TARRIF STRUCTURE  Total water consumption is based on an average water loss of 9%  Total water consumption represent the total bulk potable water to be supplied to the municipality M3/yearM3/day Total Water Consumption

PROJECTED TARIFF 2008/092009/102010/112011/12 % increase 5.9%4.3%12.46%6.5% Raw Water (R/kl) Bulk Potable Water (R/kl)  For the period July 2010 to June 2011 an increase of 12.46% is proposed.  This increase is above the current inflation rate.  The view of Bushbuckridge Water was to have a below inflation rate increase due to current cost recovery and the poor service area of our customer. But upon receiving comments from stakeholder the above inflation rate increase was considered.

COMMENTS FROM STAKEHOLDERS  SALGA The capital expenditure is significant in amount; The capital expenditure is significant in amount; The tariff is lower than the sector average increase; The tariff is lower than the sector average increase;  NATIONAL TREASURY Proposed tariff increase will lead to a better cost recovery. Proposed tariff increase will lead to a better cost recovery. The proposed tariff will result in the organisation being financial viability The proposed tariff will result in the organisation being financial viability  BUSHBUCKRIDGE LOCAL MUNICIPALITY We have not received any comments from Bushbuckridge Local Municipality. They did not comment on the initial tariff submitted and no comments have been received on the revised tariff. We have not received any comments from Bushbuckridge Local Municipality. They did not comment on the initial tariff submitted and no comments have been received on the revised tariff.

CHALLENGES  Poor cost recovery by municipality which impacts on the water board’s cash flow.  Lack of bulk infrastructure: Inyaka Water Works has a design capacity of 50 m/l ( to be commissioned to 75 M/L) per day but only 30 m/l is produced. Inyaka Water Works has a design capacity of 50 m/l ( to be commissioned to 75 M/L) per day but only 30 m/l is produced.  Operation of small schemes: Provision of bulk infrastructure will result in the small schemes being shut down. Provision of bulk infrastructure will result in the small schemes being shut down. Operational cost will be centralised in one big scheme which will result in the review of the current tariff i.e. lower tariff. Operational cost will be centralised in one big scheme which will result in the review of the current tariff i.e. lower tariff.  Impact to the municipality: Poor recovery of cost from the consumers

CONCLUSIONRecommendation - BW recommends the tariff increase by % - BW recommends the tariff increase by %

THANK YOU