Firestone Building Products EPDM Training – Termination and Miscellaneous.

Slides:



Advertisements
Similar presentations
Sectional Assembly and Installation
Advertisements

Unit 55 Roof Finish Roof Overhangs and Cornices • Open Cornices • Closed Cornices • Cornice Soffit Systems • Covering Roofs • Asphalt Shingles • Wood Shingles.
Welcome to Hardie 101 Basic Training
Interior Wall and Ceiling Finish
Unit 45 Metal Framing Industry and Code Regulations • Light-gauge Steel Framing Members • Fasteners • Framing Tools • Metal Framing Safety • Light-gauge.
NERI TORCH TRAINING PART VII PRACTICAL EXAM PREPARATION.
Illinois Department of Nuclear Safety1 Radon Mitigation Overview So, you tell the homeowner that they have elevated radon. Now what do you tell them?
Building Code – Flashing Changes & Challenges Builder Breakfast and Luncheon Series Presented by:
Building Owners Roofing System Inspection and Maintenance.
Welcome to Hardie 101 Basic Training
Unit 44 Ceiling Framing Ceiling Joists • Laying Out Ceiling Frames • Constructing Ceiling Frames • Attic Scuttles • Constructing Flat Roof Ceilings.
1 Risk Management Department Ladder Safety July, 2006.
Text goes here Agenda Welcome to Hardie 101 Basic Training Best Practices Version 6.2 – October 2012 Welcome to Hardie 101 Basic Training Best Practices.
ICRA Panel System Installation Instructions
DATE: 1/20/14 REVISIONS Construction Services 170 Long Lane Middletown, CT WESLEYAN U N I V E R S I T Y A-1 MAJOR MAINTENANCE FY15 WEST ELEVATION.
Unit 42 Floor Framing Floor Unit Resting on Sill Plates • Floor Unit Resting on Cripple Walls • Posts and Beams • Floor Joists • Subfloor • Floor Underlayment.
Architectural Drawing
ROOF DESIGNS 1. TYPES OF ROOFS The roof greatly affects the overall appearance of a home. There are many standard styles from which to choose. Choose.
EDT 51-Floor Plan Design1 Weekend Cabin Retreat Project Basements Sacramento City College EDT 51 Kenneth Fitzpatrick, P.E.
Foundation Systems.
INSTALLATION INSTRUCTIONS FOR GERARD METAL SHINGLES
Firestone Building Products EPDM Training. Membrane Attachment.
ROOF MATE Step-By-Step Application Over BOARD-STOCK INSULATION
Old Main Group. Design Issues There are no changes to the overall Design It will remain the way it is The Attachment Issue is resolved Going to screw.
Ladder Safety Training
Ladders Can take you… to great heights or on a quick trip to the ground.
Walking-Working Surfaces: Preventing Falls.
ROOF MATE Step-By-Step Application Over MODIFIED BITUMEN ROOFING Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF.
Gable, Gambrel, and Shed Roofs
R.H. ADCOCK / ARCHITECT AND ASSOCIATES, INC. Slide 1 GOSSAMER Redwood City, Ca Presented By: R.H. ADCOCK / ARCHITECT AND ASSOCIATES, INC Camino Del.
EXISTING ROOF TOP UNIT. PROVIDE NEW FLASHING AROUND STRUCTURAL PIPE SUPPORTS. 4 2 EXISTING ACCESS LADDER. RE-ADHERE EXISTING BOOT AND SEAM SEAL OVER FLAT.
Hip Rafters • Hip Jack Rafters • Constructing Hip Roofs
Safety for Working in High Places
ROOF MATE Step-By-Step Application Over METAL ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER.
Three Lines of Defense Presented by the Arapahoe County Sheriff’s Office.
Firestone Building Products. is: UltraPly™ TPO membrane in the field of the roof. RubberGard EcoWhite™ EPDM, or RubberGard™ EPDM (black), for wall flashing.
Design for Disabled & Elderly Environments Making Homes More Comfortable and Accessible Entrances Part 1 of 10.
HOME/OFF THE JOB SAFETY
ROOF MATE Step-By-Step Application Over EPDM ROOFING Master Guide Specifications List of Materials: ROOF MATE WHITE ROOF MATE LIGHT GRAY ROOF MATE BUTTER.
Master Guide Specifications List of materials: ROOF MATE WHITE ROOF MATE BASECOAT ROOF MATE BUTTER GRADE ROOF MATE MESH Optional materials: UCC (United.
Installation. Indoor Unit Installation Typical Installation.
Residential Construction Window Installation Guide *Source: (1) Carpentry & Building Construction Feirer & Feirer (2) Sill to Sash; A Professionals Guide.
Tactical Medical Solutions Inc.
Housekeeping 2015 POST Safety Forum Rob Rivers.
TPO Lap Splicing Lap Splicing Lap splicing on a TPO system is defined as joining two separate sheets, by way of heat welding, into one monolithic sheet.
Residential Construction Unit 4- Window and Doors Mr. Todzia.
Section C Nonstructural Protective Measures
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
Historical Warranty Repair Cost: A Measure Of Long-Term Roof System Performance James L. Hoff Firestone Building Products.
Fall Protection 1.  Falls are the most common cause of death on construction sites  According to OSHA, fall protection must be provided for workers.
TPO Corners Installing an Outside Corner: Outside Corner Steps: Complete field and curb membrane attachment.Start welding with pre-molded corner against.
TPO Membrane attachment and Base Tie-In Adhered System System Design Adapts Easily To Unusual Roof Profiles or Slopes System Design Is Easy To "Beef.
Microscopes Biology Light Microscope (LM) [aka Compound Microscope] Visible light is projected through the specimen. Glass lenses enlarge the image &
Struck-By Hazards. Crane Tip Over and Failure Incidents Soft Ground Inadequate outrigger support Overload Crane out of level Boom strike.
Safety on Call LADDER SAFETY. Safety on Call LADDERS CAN TAKE YOU… To great heights or on a quick trip to the ground.
Firestone Building Products
Chapter 24 Chimneys and Fireplaces Copyright Goodheart-Willcox Co., Inc. May not be posted to a publicly accessible website. Explain how masonry chimneys.
Installing A Bathroom Shower Panel American Bath Enterprises, Inc. The Bath Tub & Shower Enclosure Innovators!
Proactive Roof Asset Managemet Vince Patterson Operations Manager – Roof Maintenance & Leak Repair Department Chamberlin Roofing & Waterproofing.
VIEW SERIES with Sliding Door
STEP 1: ASSEMBLE ANGLE PLATES
Linoleum Installation System
Firestone Metal Warranties
VIEW SERIES Track Assembly & Installation
STEP 1: ASSEMBLE ANGLE PLATES
Permanent window shutter details
بسم الله الرحمن الرحيم الموضوع:الوضوء صفته وفرائضه وسننه
A light beam is incident at an angle  on the top surface of a block of plastic. The sides and bottom of the block are immersed in water. If =50, find.
Errecting TMS-580 Control room CT /-PT Platform.
Reader Swap out Guide.
Presentation transcript:

Firestone Building Products EPDM Training – Termination and Miscellaneous

Details: Termination – Term Bar

Details: Termination – Surface Mounted Counterflashing

Details: Surface Mounted Counterflashing Improper Application

Details: Surface Mounted Counterflashing Proper Application

Termination Tips When term bar is used, it must be Firestone Termination Bar. Install the termination bar so that the flanges angle away from the wall. A continuous bead of Firestone Water Block is required behind all termination bar. A continuous bead of caulking is required along the top edge of the termination bar. Ensure that the termination is fastened per specifications and details.

Details: Walkway Pad Proper Application

Walkway Pad Tips Walkway pads should be installed at all entrance and exit points of the roof. Walkway pads should be installed in high traffic areas leading to units that require frequent maintenance. Should not be used in lieu of Firestone RubberGard EPDM membrane. Walkway pads should not cover membrane lap splices. Cut the walkway pads to allow for the laps to show. Should be secured per Firestone details.