Abuse-c update Denis Walker Business Analyst RIPE NCC Database Team.

Slides:



Advertisements
Similar presentations
LACNIC Policy Update Roque Gagliano LACNIC. Current Policies Proposals - LACNIC As a result of the Open Policy Forum at LACNIC XI four policy proposals.
Advertisements

Erik Bais, May 15 th 2013 PP Resource Certification for non-RIPE NCC Members Presenter : Erik Bais –
Registration Services Feedback Andrea Cima RIPE NCC RIPE 66 - Dublin.
The RIPE NCC Update Ingrid Wijte Registration Services Assistant Manager.
NCC Services to PI Resource Holders RIPE / Dublin Axel Pawlik Randy Bush Services to PI 1.
IPv4 Final Distribution Business Processes Andrea Cima, RIPE NCC RIPE 64.
IPv4 Run Out and Transitioning to IPv6 Marco Hogewoning Trainer, RIPE NCC.
December 2013 Internet Number Resource Report. December 2013 Internet Number Resource Report INTERNET NUMBER RESOURCE STATUS REPORT As of 31 December.
March 2014 Internet Number Resource Report. March 2014 Internet Number Resource Report INTERNET NUMBER RESOURCE STATUS REPORT As of 31 March 2014 Prepared.
1 Overview of policy proposals Policy SIG Wednesday 26 August 2009 Beijing, China.
Database Update Kaveh Ranjbar Database Department Manager, RIPE NCC.
Database Update Johan Åhlén Assistant Manager and Denis Walker Business Analyst.
Database Update Kaveh Ranjbar Database Department Manager, RIPE NCC.
1 Axel Pawlik APNIC 22, 8 September 2006, Kaohsiung RIPE NCC Update APNIC 22.
Chit Fund Software. First we will try to see how to create a (Chit Scheme) 1. Enter the Chit Name 2. Enter Chit Value. 3. Total No. of members in that.
RIPE Network Coordination Centre ISOC 2007/IPv6 Forum, Tel Aviv, Feb Arno Meulenkamp IP Resource Statistics & IPv6 Policy Update.
Update on RIPE NCC Inter- RIR Transfer proposal Adam Gosling APNIC 38 Policy SIG Meeting 18 September 2014.
Deal Registration BP User Guide Western Europe
APNIC Policy SIG1 5 th APNIC Address Policy SIG Report March 7, 2002 Takashi Arano Address Policy SIG Chair Asia Global Crossing.
Database Update Kaveh Ranjbar Database Department Manager, RIPE NCC.
Database Update Paul Palse Database Manager, RIPE NCC.
APNIC Update RIPE 59 October Overview APNIC Services Update APNIC 28 policy outcomes APNIC Members and Stakeholder Survey Next APNIC Meetings.
18th APNIC Open Policy Meeting SIG: DB Thursday 2 September 2004 Nadi, Fiji Chair: Xing Li.
Life After IPv4 Depletion Leslie Nobile. Overview ARIN’s current IPv4 inventory Trends and observations Ways to obtain IP addresses post IPv4 depletion.
The Online Activity Module User Account and Contact Us June 5, 2013.
DOCUMENT MANAGEMENT FOR A NEW RESEARCH GRANT PROPOSAL FORM IN JE-S 1.
Erik Bais, May 13 th 2015 PP – unassigned yet General Transfer Policy Presenter : Erik Bais –
Update from the RIPE NCC Axel Pawlik ARIN XXIX, Vancouver.
Feedback from RIPE NCC Registration Services Alex Le Heux, RIPE NCC RIPE64 Ljubljana.
Abuse-c Update Denis Walker Database Department, RIPE NCC.
Rough Edges of Current Policies Alex Le Heux RIPE NCC Rome.
Anti-Abuse Working Group Tobias Knecht & Brian Nisbet RIPE 68 Warsaw, May 2014.
Erik Bais, Nov 5 th 2014 PP Allow IPv6 Transfers Presenter : Erik Bais –
Contractual Relationship Requirements for End Users Implementation Update:
Skeeve Stevens APNIC 31, Hong Kong Alternative criteria for subsequent IPv6 allocations Prop-083v003.
RIPE Network Coordination Centre 28, 28 August 2009, Beijing 1 Axel Pawlik Update from the RIPE NCC.
Crisis Commander Mobile App. Crisis Commander Cloud based virtual Crisis Management tool Complete audit trail and full legal compliance Initiates securely.
Policies for ASN Management in the Asia Pacific Region – Revised Draft Address Policy SIG APNIC14, Kitakyushu, Japan 4 Sept 2002.
Erik Bais, May 5 th 2011 PP Removal of multihomed requirement for IPv6 Presenter : Erik Bais –
Update from the RIPE NCC Axel Pawlik ARIN XXX, Dallas.
Rob Blokzijl, RIPE 64, April 2012 IPv4 Maintenance Policy.
Anti-Abuse Working Group Tobias Knecht & Brian Nisbet RIPE 71 Bucharest, November 2015.
Current Policy Topics Emilio Madaio RIPE NCC RIPE November 2010, Rome.
Contractual Relationship Requirement for End Users Implementation update policy proposal
Registration Services Feedback Andrea Cima RIPE NCC RIPE 67 - Athens.
Prop-073 Automatic allocation/assignment of IPv6 Terry Manderson Andy Linton.
Aut-num object Denis Walker Business Analyst RIPE NCC Database Team.
Anti-Abuse Working Group Tobias Knecht & Brian Nisbet RIPE 67 Athens, October 2013.
Prop-077: Proposal to supplement transfer policy of historical IPv4 addresses Wendy Zhao Wei, Jane Zhang & Terence Zhang Yinghao.
Contractual Relationship Requirements for End Users Implementation Update: Policy Proposal
Update from the RIPE NCC Axel Pawlik Managing Director.
Crisis Commander Mobile App
20 Years of the RIPE NCC: Where Are We Today?
Head Of Member Services
Shared Space Admin Demo
Publication of Sponsoring LIR for Independent Number Resources
AFRINIC Services Update
ICD-11 Review Process Overview
RIPE Whois Database Software Recent Changes
APNIC 29 Policy SIG report
Downstream Allocations by LIRs A Proposal
RIPE Policy Landscape Filiz Yilmaz ESNOG, February 2008.
Selecting Your Year 9 Options
A view from ARIN, LACNIC & RIPE Communities Laura Cobley
NWI-1 Staying On Top of Abuse Contact Changes
PERSON objects in the RIPE Database
IPv6 distribution and policy update
Feedback From NCC Registration Services
IPv6 Policy Update ~ APNIC community ~
PP Allow AS Number Transfers
Presentation transcript:

abuse-c update Denis Walker Business Analyst RIPE NCC Database Team

Denis Walker, RIPE 67 October 2013 Where are we now? Number or LIRs ~ 9000 abuse-c contacts added ~ 4000 still to be added ~

Denis Walker, RIPE 67 October 2013 Networks covered IPv4 allocations ~ 57% IPv6 allocations ~ 58% IPv4 PI assignments ~ 6% IPv6 assignment ~ 14% IPv4 allocated address space ~ 62% IPv4 assigned PI address space ~ 12% 3

Denis Walker, RIPE 67 October 2013 Simplified UI for adding abuse-c To be deployed shortly after RIPE 67 Log into LIR Portal Enter address DONE The software will do everything else 4

Denis Walker, RIPE 67 October 2013 Deadline for LIRs It was agreed all LIRs should have abuse-c by end of Q3 – now!! We have listened to your comments The new UI should help Propose extending deadline to end November After that date all remaining LIRs will have it set up for them by default 5

Denis Walker, RIPE 67 October 2013 PI space Propose delaying start of this phase until end of November Provide new simplified UI for PI holders – Enter org id, mntner password, address – DONE The software will do everything else 6

Denis Walker, RIPE 67 October 2013 References to abuse-c Currently only from organisation object Some users find duplicating org a problem Allowing references from multiple locations is also a problem RIPE NCC acknowledges this is a problem Propose to take an in depth look at options Come back to WG with suggestions for improvement 7

Questions?