1 Application status F.Carminati 11 December 2001.

Slides:



Advertisements
Similar presentations
ATLAS/LHCb GANGA DEVELOPMENT Introduction Requirements Architecture and design Interfacing to the Grid Ganga prototyping A. Soroko (Oxford), K. Harrison.
Advertisements

Author - Title- Date - n° 1 GDMP The European DataGrid Project Team
1 CHEP 2000, Roberto Barbera Tests of data management services in EDG 1.2 ALICE Off-line Week,
CMS Applications Towards Requirements for Data Processing and Analysis on the Open Science Grid Greg Graham FNAL CD/CMS for OSG Deployment 16-Dec-2004.
1 Software & Grid Middleware for Tier 2 Centers Rob Gardner Indiana University DOE/NSF Review of U.S. ATLAS and CMS Computing Projects Brookhaven National.
DataGrid is a project funded by the European Union CHEP 2003 – March 2003 – Title – n° 1 Grid Data Management in Action Experience in Running and.
GRID DATA MANAGEMENT PILOT (GDMP) Asad Samar (Caltech) ACAT 2000, Fermilab October , 2000.
Workload Management Workpackage Massimo Sgaravatto INFN Padova.
The LHC Computing Grid Project Tomi Kauppi Timo Larjo.
Workload Management Massimo Sgaravatto INFN Padova.
Magda – Manager for grid-based data Wensheng Deng Physics Applications Software group Brookhaven National Laboratory.
LHC Experiment Dashboard Main areas covered by the Experiment Dashboard: Data processing monitoring (job monitoring) Data transfer monitoring Site/service.
XCAT Science Portal Status & Future Work July 15, 2002 Shava Smallen Extreme! Computing Laboratory Indiana University.
1 DataGRID Application Status and plans
INFN-GRID Globus evaluation (WP 1) Massimo Sgaravatto INFN Padova for the INFN Globus group
5 November 2001F Harris GridPP Edinburgh 1 WP8 status for validating Testbed1 and middleware F Harris(LHCb/Oxford)
US ATLAS Western Tier 2 Status and Plan Wei Yang ATLAS Physics Analysis Retreat SLAC March 5, 2007.
Workload Management WP Status and next steps Massimo Sgaravatto INFN Padova.
HEP Experiment Integration within GriPhyN/PPDG/iVDGL Rick Cavanaugh University of Florida DataTAG/WP4 Meeting 23 May, 2002.
Andrew McNab - Manchester HEP - 5 July 2001 WP6/Testbed Status Status by partner –CNRS, Czech R., INFN, NIKHEF, NorduGrid, LIP, Russia, UK Security Integration.
KNMI Applications on Testbed 1 …and other activities.
3 Sept 2001F HARRIS CHEP, Beijing 1 Moving the LHCb Monte Carlo production system to the GRID D.Galli,U.Marconi,V.Vagnoni INFN Bologna N Brook Bristol.
LCG and HEPiX Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002.
SLICE Simulation for LHCb and Integrated Control Environment Gennady Kuznetsov & Glenn Patrick (RAL) Cosener’s House Workshop 23 rd May 2002.
Grid Workload Management & Condor Massimo Sgaravatto INFN Padova.
1 The DataGrid WorkPackage 8 F.Carminati 28 June 2001.
DataGrid Applications Federico Carminati WP6 WorkShop December 11, 2000.
Cosener’s House – 30 th Jan’031 LHCb Progress & Plans Nick Brook University of Bristol News & User Plans Technical Progress Review of deliverables.
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL U.S. ATLAS Physics and Computing Advisory Panel Review Argonne National Laboratory Oct 30, 2001.
11 December 2000 Paolo Capiluppi - DataGrid Testbed Workshop CMS Applications Requirements DataGrid Testbed Workshop Milano, 11 December 2000 Paolo Capiluppi,
DOSAR Workshop, Sao Paulo, Brazil, September 16-17, 2005 LCG Tier 2 and DOSAR Pat Skubic OU.
Grid Workload Management Massimo Sgaravatto INFN Padova.
MAGDA Roger Jones UCL 16 th December RWL Jones, Lancaster University MAGDA  Main authors: Wensheng Deng, Torre Wenaus Wensheng DengTorre WenausWensheng.
7April 2000F Harris LHCb Software Workshop 1 LHCb planning on EU GRID activities (for discussion) F Harris.
Author - Title- Date - n° 1 Partner Logo EU DataGrid, Work Package 5 The Storage Element.
Author - Title- Date - n° 1 Partner Logo WP5 Summary Paris John Gordon WP5 6th March 2002.
29 May 2002Joint EDG/WP8-EDT/WP4 MeetingClaudio Grandi INFN Bologna LHC Experiments Grid Integration Plans C.Grandi INFN - Bologna.
Magda Distributed Data Manager Status Torre Wenaus BNL ATLAS Data Challenge Workshop Feb 1, 2002 CERN.
WP8 Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid WP8 Meeting, 16th November 2000 Glenn Patrick (RAL)
David Adams ATLAS ADA, ARDA and PPDG David Adams BNL June 28, 2004 PPDG Collaboration Meeting Williams Bay, Wisconsin.
October LHCUSA meeting BNL Bjørn S. Nilsen Update on NSF-ITR Proposal Bjørn S. Nilsen The Ohio State University.
First attempt for validating/testing Testbed 1 Globus and middleware services WP6 Meeting, December 2001 Flavia Donno, Marco Serra for IT and WPs.
PHENIX and the data grid >400 collaborators Active on 3 continents + Brazil 100’s of TB of data per year Complex data with multiple disparate physics goals.
28 March 2001F Harris LHCb Software Week1 Overview of GGF1 (Global Grid Forum) and Datagrid meeting, NIKHEF, Mar 5-9 F Harris(Oxford)
1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001.
CLRC and the European DataGrid Middleware Information and Monitoring Services The current information service is built on the hierarchical database OpenLDAP.
Preparation for Integration Organized access to the code WP6 infrastructure (MDS-2, RC, …) Input from WPs on requirements,... Acquire experience with Globus.
J.J.Blaising April 02AMS DataGrid-status1 DataGrid Status J.J Blaising IN2P3 Grid Status Demo introduction Demo.
Grid User Interface for ATLAS & LHCb A more recent UK mini production used input data stored on RAL’s tape server, the requirements in JDL and the IC Resource.
UK Grid Meeting Glenn Patrick1 LHCb Grid Activities in UK Grid Prototype and Globus Technical Meeting QMW, 22nd November 2000 Glenn Patrick (RAL)
6/23/2005 R. GARDNER OSG Baseline Services 1 OSG Baseline Services In my talk I’d like to discuss two questions:  What capabilities are we aiming for.
PHENIX and the data grid >400 collaborators 3 continents + Israel +Brazil 100’s of TB of data per year Complex data with multiple disparate physics goals.
ATLAS Magda Distributed Data Manager Torre Wenaus BNL PPDG Robust File Replication Meeting Jefferson Lab January 10, 2002.
AliEn AliEn at OSC The ALICE distributed computing environment by Bjørn S. Nilsen The Ohio State University.
INFSO-RI Enabling Grids for E-sciencE ARDA Experiment Dashboard Ricardo Rocha (ARDA – CERN) on behalf of the Dashboard Team.
Julia Andreeva on behalf of the MND section MND review.
Magda Distributed Data Manager Prototype Torre Wenaus BNL September 2001.
ESA DataGrid Review – 10 June 2002 – n° 1 Summary item 3  ESA and WP9 part 1 (45m)  DataGrid Frascati infrastructure (AT, 7.5m)  ESA GOME application.
Data Management The European DataGrid Project Team
1 A Scalable Distributed Data Management System for ATLAS David Cameron CERN CHEP 2006 Mumbai, India.
Distributed Physics Analysis Past, Present, and Future Kaushik De University of Texas at Arlington (ATLAS & D0 Collaborations) ICHEP’06, Moscow July 29,
Grid Status - PPDG / Magda / pacman Torre Wenaus BNL DOE/NSF Review of US LHC Software and Computing Fermilab Nov 29, 2001.
Enabling Grids for E-sciencE INFSO-RI Enabling Grids for E-sciencE Gavin McCance GDB – 6 June 2007 FTS 2.0 deployment and testing.
Grid Activities in CMS Asad Samar (Caltech) PPDG meeting, Argonne July 13-14, 2000.
14 June 2001LHCb workshop at Bologna1 LHCb and Datagrid - Status and Planning F Harris(Oxford)
Magda Distributed Data Manager Torre Wenaus BNL October 2001.
U.S. ATLAS Grid Production Experience
Moving the LHCb Monte Carlo production system to the GRID
Ian Bird LCG Project - CERN HEPiX - FNAL 25-Oct-2002
Presentation transcript:

1 Application status F.Carminati 11 December 2001

2Architect WP meetingNovember 10, 2001 Validation plan timeline – new Doc review WP1 M.Reale WP2 J.Templon WP3 I.Augustin WP4 A.De Salvo WP5 JJ.Blaising Integration assessment 1 person / application Application integration + Test plan 1 person / application TWG + WP8-10 General Meeting Validation plans presented WP8 staff VO set up Basic testing (?) Message to WP9 & WP10 Software integration  WP8  WP9  WP10 Party!  Start writing 8.2 October

3Architect WP meetingNovember 10, 2001 Validation plan timeline – now Doc review WP1 M.Reale WP2 J.Templon WP3 I.Augustin WP4 A.De Salvo WP5 JJ.Blaising Integration assessment 1 person / application Application integration + Test plan 1 person / application WP8 staff VO set up Basic testing (?) WP8 WP9WP10  Start writing 8.2 Software integration Party! TWG + WP8-10 General Meeting Validation plans presented

4Architect WP meetingNovember 10, 2001 What next? The integration is now finished All the actors should be praised However the integration process took 300% more time than planned May be this was physiological in such a large project But it should not happen again We should not let it dis-integrate again Single WPs must integrate regularly their new versions in the TB We need development and production environment They do not need to be released at once This has to be a continuous process

5Architect WP meetingNovember 10, 2001 Application validation 8.2 will contain all we can do from today to Christmas It is very important that now we have the access as soon as possible This week one person/application Next week the validation groups For the review we may have one more month of testing to report But WP6 must stand by supporting the users We may hint this in 8.2 We can still do a reasonable job, with a bit of luck

6Architect WP meetingNovember 10, 2001 What we want OS & Net services Bag of Services (GLOBUS) DataGRID middleware PPDG, GriPhyn, DataGRID HEP VO common application layer Earth Obs.Biology ALICEATLASCMSLHCb Specific application layer WP9WP 10 GLOBU S team DataGRI D ATF WP TWG March

7Architect WP meetingNovember 10, 2001 What we have OS & Net services Bag of Services (GLOBUS) ALICEATLASCMSLHCb Specific application layer WP9WP 10 GLOBU S team DataGRID middleware WP1WP2WP3WP4WP5 HEP VO common application layer Earth Obs.Biology WP TWG DataGRID middleware WP1WP2WP3WP4WP5 If we manage to define HEP VO common application layer Earth Obs.Biology WP TWG Common core use case DataGRID middleware WP1WP2WP3WP4WP5 Or even better DataGRID middleware WP1WP2WP3WP4WP5 HEP VO common application layer Earth Obs.Biology WP TWG Common core use case It will be easier for them to arrive at

8Architect WP meetingNovember 10, 2001 A modest proposal Identify one / two experts from each application Have them meet regularly for some limited amount of time to produce a proposal Ideally a couple of months Meet in person or via videoconf Discuss this proposal at the next architect – WP meeting Have the different applications accept this proposal as their GRID baseline

9Architect WP meetingNovember 10, 2001 Why this is fundamental? The LCGP (Lhc Computing Grid Project) will require us to work on common projects The HICB (intergrid coordination board) expects proposal from the experiments It would be MUCH  smarter  to provide a single core use case Instead of competing one with the other The different GRID projects risk to diverge A common core use case could help them to develop coherent solutions Or ideally complementary elements

10Architect WP meetingNovember 10, 2001 Experiment activities There is a quite large expertise in the experiments about GRID Experiments are already using GRID tools in production It is important that this experience is put to work for DataGRID providing qualified feedback

11Architect WP meetingNovember 10, 2001 CMS

12Architect WP meetingNovember 10, 2001 CMS Production Sites, Data transfers INFN CERN FNAL Bristol/RAL Caltech Moscow IN2P3 UFL HIP WisconsinUCSD Min.Bias Objy/DB.fz files Objy/DB RC archiving data RC publishing data Direct access to INFN Objy Federations through AMS by V. Lefebure GDMP widely used Condor-G used at few sites

13Architect WP meetingNovember 10, 2001 Job scripts – BOSS integration “Produce events dataset mu_MB2mu_pt4” Request decomposition (Job scripts) JOBS RC BOSS DB Request monitoring (Job scripts) Production DB Production Interface Production Manager distributes tasks to Regional Centers Farm storage Request Summary file RC farm Regional Center Data location through Production DB

14Architect WP meetingNovember 10, 2001 CMS - MOP

15Architect WP meetingNovember 10, 2001 Distributed DB TAG Analysis

16Architect WP meetingNovember 10, 2001 ATLAS

17Architect WP meetingNovember 10, 2001 USAtlas Tool Development GRAPPA Monitoring Condor (G) GRAM GSI MDS/ GIIS/GRIS GridFTP Replica Cat Replica Mgr PacMan Packaging Magda

18Architect WP meetingNovember 10, 2001 Magda Architecture Diagram Location Site Location Site Location Site Host 2 Location Cache Disk Site Location Mas s Stor eSite Source to cache stagein Source to dest transfer MySQL Synch via DB Host 1 Replication task Collection of logical files to replicate Spider scp, gsiftp Register replicas Catalog updates

19Architect WP meetingNovember 10, 2001 Grappa lexus.physics.indiana.edu/~griphyn/grappa/

20Architect WP meetingNovember 10, 2001 ATLAS run time environment & monitoring atlasgrid.bu.edu/atlasgrid/atlas/atlas_cache/cache.html heppc1.uta.edu/kaushik/computing/grid-status/index.html

21Architect WP meetingNovember 10, 2001 LHCb

22Architect WP meetingNovember 10, 2001 Globus use in LHCb Globus-job-submit (tested, works in production) to: Testbed 0 Csflnx01.rl.ac.uk (RAL) Ccali.in2p3.fr (IN2P3) Don’t use Globus RSL, give options on Globus- job-submit command line Some instability in service Need Globus client s/w on LXPLUS Globus-rcp tested, not reliable enough Globus-FTP tests underway NIKHEF-SARA

23Architect WP meetingNovember 10, 2001 ALICE

24Architect WP meetingNovember 10, 2001 ALICE GRID August Production

25Architect WP meetingNovember 10, 2001 ALICE GRID File Catalogue as a global file system on top of a RDB TAG Catalogue, as extension Secure Authentication Interface to Globus under development Central Queue Manager ("pull" vs "push" model) Monitoring infrastructure The CORE GRID functionality

26Architect WP meetingNovember 10, 2001 DataGrid & ROOT Local Remote Selection Parameters Procedure Proc.C PROOF CPU TagD B RD B DB 1 DB 4 DB 5 DB 6 DB 3 DB 2 Bring the KB to the PB and not the PB to the KB

27Architect WP meetingNovember 10, 2001 Conclusion Time is very tight for validation before the review The release process will be of fundamental importance for the further development of the project We have to follow it closely Some work needs to be done to integrate and streamline products and procedures But for this you need real users! Some work needs to be done on the user side to provide a more usable/useful picture to developers A huge potential is there, up to us to exploit it correctly!