Download presentation
Presentation is loading. Please wait.
Published byHector McDowell Modified over 9 years ago
1
HUMBOLDT BAY SEA LEVEL RISE ADAPTATION PLANNING PROJECT Funded by the State Coastal Conservancy Aldaron Laird Project Planner
2
ADAPTATION PLANNING WORKING GROUP State Coastal Conservancy Coastal Ecosystems Institute of Northern California Humboldt Bay Harbor, Recreation and Conservation District Humboldt County City of Eureka City of Arcata California Coastal Commission, North Coast District Wiyot Tribe Department of Fish and Wildlife Humboldt Bay National Wildlife Refuge Bureau of Land Management U.S. Fish and Wildlife Service
3
MOSAIC OF COASTAL PLANNING AUTHORITIES Coastal Commission: Retained and Federal Humboldt County City of Eureka City of Arcata Harbor District
4
ADAPTATION PLANNING GOAL To support informed decision-making and encourage a unified, consistent regional adaptation strategy to address impacts associated with sea level rise in the Humboldt Bay region.
5
SEA LEVEL RISE ADAPTATION PLANNING PROCESS ASSESSPLANIMPLEMENT 2012 California Climate Adaption Guidelines 2012 Adapting to Sea Level Rise: A Guide for California's Coastal Communities
6
PHASE I ASSESS EXISTING CONDITIONS Shoreline Inventory & Mapping Trinity Associates McBain & Trush Northern Hydrology & Engineering 2010-2013 Tuluwat 8.94’, 2010
7
PHASE II VULNERABILITY ASSESSMENT & ADAPTATION PLANNING Coastal Ecosystems Institute of Northern California Humboldt Bay Harbor Recreation and Conservation District Humboldt County Public Works Department Northern Hydrology & Engineering & Trinity Associates
8
Historical Conditions 1870 60% Open Bay 40% Salt Marsh 60 miles of Shoreline
9
Current Conditions 90% Open Bay 10% Salt Marsh (-9,000 acres) 102 miles of Shoreline 75 % (77 miles) Artificial 25% (26 miles) Natural
10
Dike = 53%, 41 miles Dike = 53%, 41 miles Railroad = 14 %, 11 miles Railroad = 14 %, 11 miles Shoreline Structure
11
Exposed = 9 miles Exposed = 9 miles Vegetated = 65 miles Vegetated = 65 miles Fortified = 27 miles Fortified = 27 miles Shoreline Cover
12
Shoreline Elevations Mean Monthly Maximum Water & 2012 LiDAR Elevations
13
PHASE II VULNERABILITY ASSESSMENT & ADAPTATION PLANNING Flooding from the failure of shoreline structures or sea level rise is the primary exposure to Humboldt Bay communities 2012 California Climate Adaption Guidelines 2012 Adapting to Sea Level Rise: A Guide for California's Coastal Communities
14
PHASE II VULNERABILITY ASSESSMENT & ADAPTATION PLANNING Shoreline Inventory and Mapping Inundation and Groundwater Models Potential Inundation Area Maps Case Studies of Selected Critical Assets Annual Public and Stakeholder Meetings
15
CURRENT TIDEWATER FLOODING CURRENT TIDEWATER FLOODING King High Tide 8.94’, 2010
16
VULNERABILITY & RISK ASSESSMENTS EXPOSURE: Where SENSITIVITY: What IMPACTS: How ADAPTIVE CAPACITY: Responses RISK & ONSET: Urgency ECONOMIC CONSEQUENCE: Prioritize
17
EXPOSURE: Where
18
A HISTORICAL LEGACY A HISTORICAL LEGACY Dike Cover & Elevation
19
Shoreline Vulnerability Rating HIGHLY VULNERABLE = 59.0 miles HIGHLY VULNERABLE = 59.0 miles MODERATELY VULNERABLE = 28.3 miles MODERATELY VULNERABLE = 28.3 miles LOW VULNERABILITY = 14.0 miles LOW VULNERABILITY = 14.0 miles
20
Create 100 year Record of Predicted Tidal Elevations Create Inundation Model and Maps (EC, 1, 2, 3 & 6 feet sea level rise & 100 year flood) Create Groundwater Elevation Model and Maps (EC, 1, 2, 3 & 6 feet sea level rise) VULNERABILITY ASSESSMENT MODELING Jeff Anderson Northern Hydrology & Engineering
21
EXISTING CONDITIONS Potential Flood Area: Shoreline Failure
23
EXPOSURE: Where SENSITIVITY: What
24
A. Communities: King Salmon King Salmon B. Facilities & Services: 1.Water and Wastewater City of Eureka Wastewater City of Eureka Wastewater City of Arcata Wastewater City of Arcata Wastewater 2. Energy 3.Transportation Highway 101 Corridor Highway 101 Corridor 4. Communications CRITICAL ASSETS AT RISK APWG Selected for Adaptation Planning Case Studies That affect the greatest number of people in the Humboldt Bay region
25
KING SALMON
26
HIGHWAY 101 TRANSPORTATION CORRIDOR
27
Structures Land Uses Private Property Historical/Cultural/ Archeological Resources Hazardous Material Sites Contaminated Lands Natural Areas and Natural Resources OTHER ASSETS CATEGORIES
28
EXPOSURE: Where SENSITIVITY: What IMPACTS: How
29
SECONDARY IMPACTS: A. Flooding Shoreline Erosion-Breaching Shoreline Overtopping Rising Groundwater B. Salt Water Intrusion PRIMARY IMPACT: SEA LEVEL RISE
30
SHORELINE FAILURE by EROSION SHORELINE FAILURE by EROSION King High Tide and High Winds Breach Dike Photo Credit; Times Standard 9.51’, 2003
31
SHORELINE FAILURE by OVERTOPPING SHORELINE FAILURE by OVERTOPPING King High Tide and Storm Surge 9.49’, 2006
32
RISING SEA LEVELS & RISING GROUNDWATER
33
EXPOSURE: Where SENSITIVITY: What IMPACTS: How ADAPTIVE CAPACITY: Responses
34
ADAPTIVE CAPACITY Land Use Policies and Regulations Structure and Infrastructure Projects Natural Systems Protections Public Education and Awareness Financial Abilities
35
EXPOSURE: Where SENSITIVITY: What IMPACTS: How ADAPTIVE CAPACITY: Responses RISK & ONSET: Urgency
36
Long-Term Average King Tide 8.78’ 2000-2012 Average King Tide 8.92’ (Mean Monthly Maximum High Tide 7.74’)
37
RELATIVE SEA LEVEL RISE (North Spit Sea Level Rise + Subsidence Rate = 18.6” Sea Level Change per Century, Russell & Griggs, 2012)
38
EXPOSURE: Where SENSITIVITY: What IMPACTS: How ADAPTIVE CAPACITY: Responses RISK & ONSET: Urgency ECONOMIC CONSEQUENCE: Prioritize
39
MAGNITUDE OF CONSEQUENCE Economic importance or value of assets affected by: Flooding Rising Groundwater Salt Water Intrusion
40
PRIORITIZE ADAPTIVE NEEDS IDENTIFY STRATEGIES PRIORITIZE STRATEGIES PHASE & IMPLEMENT DEVELOP & IMPLEMENT ADAPTATION STRATEGIES
41
BASIC ADAPTATION PLANNING STRATEGY BASIC ADAPTATION PLANNING STRATEGY We cannot manage or protect the shoreline parcel by parcel or jurisdiction by jurisdiction, we need to address entire hydrologic units and the entirety of Humboldt Bay.
42
ADAPTATION STRATEGIES Land Use Policies and Regulations Structure and Infrastructure Projects Natural Systems Protections Public Education and Awareness
43
CITY OF ARCATA Wastewater Facility Dike Rehabilitation $900,000.00/mile
44
Tsunami and FEMA Flood Zones & 2 Meter Sea Level Rise Inundation Area 3.0 meters 6.0 meters 2.0 meters
45
THANK-YOU
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.