Presentation is loading. Please wait.

Presentation is loading. Please wait.

Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015.

Similar presentations


Presentation on theme: "Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015."— Presentation transcript:

1 Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

2 Vacuum, Surfaces & Coatings Group Technology Department EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015 M. GIL COSTA 2 Test Set-Up at ANKA Outline: ANKA Facility Current Status/Next Steps FCC Beam Screen Prototype Test Bench Next Steps ANKA Test Line full definition Schedule Conclusion

3 Vacuum, Surfaces & Coatings Group Technology Department 3 M. GIL COSTA position ANKA Facility ANKA FacilityCurrent StatusNext StepsScheduleConclusion ANKA Facility EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

4 Vacuum, Surfaces & Coatings Group Technology Department Existing Beam Line slit Valve Absorber Pump Distance source to set up center: 5.5 m Set up 4 M. GIL COSTA Information summary: Free space Length from the source to the wall: ~ 7 m “Useful” length? (~ up to 2-3 m ?) Beam height: 1.4 m Incidence angle: 6.4 mrad Operating ANKA at 2.2 GeV Horizontal slit opening at 4m: 6.2 mrad SR load : ~ 110 W Flux: ~ 4 10 20 ph/s ANKA Facility ANKA FacilityCurrent StatusNext StepsScheduleConclusion EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

5 Vacuum, Surfaces & Coatings Group Technology Department 5 M. GIL COSTA Some components are available on site Proposition Sketch beam line + set up (thanks to E. Huttel) Vertical scrapper with fixed horizontal mask ANKA Facility ANKA FacilityCurrent StatusNext StepsScheduleConclusion EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

6 Vacuum, Surfaces & Coatings Group Technology Department 6 Information to be defined: Design of absorbers needed or they are existent elements? Dimensions of existent elements to integrate on CATIA model? Alignment and survey system? Control and acquisition system ? Definition of the set up functionalities Finalisation of the instrumentation needs M. GIL COSTA ANKA Facility ANKA FacilityCurrent StatusNext StepsScheduleConclusion EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

7 Vacuum, Surfaces & Coatings Group Technology Department 7 Current Status / Next Steps Beam Screen Prototype ANKA FCC Test Bench ANKA FCC Test Line M. GIL COSTA Current StatusNext Steps ANKA FacilityCurrent StatusNext StepsScheduleConclusion EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

8 Vacuum, Surfaces & Coatings Group Technology Department 8 Beam Screen (15m long) Beam Screen Prototype (≈2m) M. GIL COSTA Current Status ANKA FacilityCurrent StatusNext StepsScheduleConclusion EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

9 Vacuum, Surfaces & Coatings Group Technology Department 9 ANKA FCC Test Bench Supports adaptation from an existent design Vacuum Chamber FCC Beam Screen Prototype Centring System M. GIL COSTA Current Status ANKA FacilityCurrent StatusNext StepsScheduleConclusion EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

10 Vacuum, Surfaces & Coatings Group Technology Department 10 M. GIL COSTA FCC Beam Screen Prototype Centring System Supports adaptation from an existent design ANKA FCC Test Bench Current Status ANKA FacilityCurrent StatusNext StepsScheduleConclusion EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

11 Vacuum, Surfaces & Coatings Group Technology Department 11 Next Steps ANKA FCC Test Line Complete definition of the line with the inputs taken in the last days Check integration with ANKA Listing components and costs Start of production and material orders M. GIL COSTA Next Steps ANKA FacilityCurrent StatusNext StepsScheduleConclusion EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

12 Vacuum, Surfaces & Coatings Group Technology Department 12 Schedule Design phase end expected by end of November 2015 Fully definition of the line is not yet defined M. GIL COSTA Schedule ANKA FacilityCurrent StatusNext StepsScheduleConclusion Seems difficult to be finished in one week EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

13 Vacuum, Surfaces & Coatings Group Technology Department 13 Conclusions Beam Screen prototype production definition and 3D model is well advanced. Test Bench design proposition is presented and need to be discussed for further development and future design versions. ANKA Test Line for FCC prototypes has to be defined on the following weeks with priority based on the gathered information after discussion during Orsay meeting. Design Schedule might have to be reconsidered, trying to maintain the same deadline for the next step (procurement/tests in lab) M. GIL COSTA Conclusion ANKA FacilityCurrent StatusNext StepsScheduleConclusion EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

14 Vacuum, Surfaces & Coatings Group Technology Department 14 M. GIL COSTA EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

15 Vacuum, Surfaces & Coatings Group Technology Department 15 M. GIL COSTA Thanks for your attention EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015

16 Vacuum, Surfaces & Coatings Group Technology Department 16 M. GIL COSTA EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015


Download ppt "Miguel GIL COSTA CIEMAT CERN TE-VSC EuroCirCol WP4, Annual meeting 3 Orsay, 19 November 2015."

Similar presentations


Ads by Google