1
Jason Grewe and David Wagner JD Construction Management Old Milwaukee Subdivision 200 Acres 140 Homes 1 year House Costs Slab Value Engineering Wastewater Treatment
2
House Building Cost Differences Lowest of $49 dollars per square foot $54,880 total building costs Highest of $150 per square foot $168,000 total building cost Lowest Average of $75 dollars per square foot $84,000 total building costs Highest Average of $95 dollars per square foot $106,400 total building cost
3
Value Engineering We specified post-tension slabs instead of steel slabs Saving 0.03 cents a square foot. $2352 on 1120 sqft and $2587 on 1232 sqft $4939 total savings on using post-tension
4
Conventional Wastewater Collection Terrain requires deep trenching for pipes $2 million for wastewater collection $14,600 per house
5
Decentralized Wastewater System Septic system: 80% Cost Savings $350,000 or $2500/house May not be suitable Decentralized Wastewater Disposal 1 unit for 4-houses: $20,000 engineering 35 units: $700,000 or $5140/house 65% cost savings over conventional collection
6
JD Construction Magagement Reduce Building Costs Slab Foundation Value Engineering Wastewater This intense project requires the close coordination JD always delivers.