1
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware Optimization at IIT
2
Tracker Cosmic Ray Readout Mid-June: tracker 1 readout arrives at RAL Late June/Early July: –Cryostats cooled down with reliable operation at 9 K –LED data indicate clear pedestals and photopeaks Early July: Cosmic ray data taking underway –Tracks successfully reconstructed –Timing refinements have improved efficiencies
3
Trigger Timing Scan - Results 3M.Ellis - VC113 - 17th July 2008 Delay chosen: 862 ns Filled square – station 1 Triangle up – station 2 Triangle down – station 3 Open circle – station 4 Open square – station 5 Light Yield for each Station Average Light Yield for All 5 Stations
4
Triplet Residuals – Station 5 4M.Ellis - VC113 - 17th July 2008 Station 5 before adjusting the nominal values Station 5 after adjusting plane X
6
2 nd Tracker Preparation at FNAL Cryostats 3 and 4 being prepared for temperature tests List of tasks for cassette characterization (setting optimum bias voltages) –Collect VLSB data collection boards –Assemble LVDS cables –Prepare AFE-IIt backplanes –Review characterization procedures –Ship LED pulser from RAL to FNAL
7
Tracker Readout Optimization at IIT One board test stand set up by Bill Luebke and me Readout Optimizations –4-level TriP-t buffering of incoming data –Double frequency clock for non-hit channels Status: Data read out to VLSB even with –Outdated spreadsheet –Wrong clock generation firmware –Wrong input timing signals to AFE-IIt board –Wrong VLSB setup Plan: –Get correct spreadsheet, firmware, and VLSB setup (install today after meeting) –Record charges and times with VLSB –Evaluate data quality as function of buffer level filled