Structured / Unstructured Market Trials Weekly Update – Friday Meeting November 1, 2013
2
Please Help Minimize Call Disruptions Mute your phones Do not dial-in from a recorded line If you record the call, your “holds” affect everyone Do not put the call on hold even if you are on mute Please be courteous of everyone’s time If necessary, SPP will mute all callers and unmute only at certain times for questions Thank you for your attention to this matter! 2
3
Agenda October 25 Network Outage (5 min) 9:00 – 9:05A Preliminary Results Oct 28 – Nov 1 (5 min) 9:05 – 9:10A Settlements (10 min) 9:10 – 9:20A Analysis Oct 21 – 27 (30 min) 9:20 – 9:50A Announcements & Outstanding Questions (10 min) 9:50 – 10:00A Look-Ahead Nov 4 – Nov 11 (15 min) 10:00 – 10:15A Updates (10 min) 10:15 – 10:25A Release Scorecard Migration Report Known Issues Log Questions (10 min) 10:25 – 10:35A 3
4
Analysis: Friday Oct 25 4 Stan Chapman / Casey Cathey Network Outage SPP will not count Oct 25 as an official OD or Bid to Bill Day
5
Preliminary Results from Oct 28 – Nov 1 5 Alan Adams Scheduled Scenarios 3A & 3 – Credit Scenarios 33A & B - Ramp Reservation Questions?
6
Credit Scenario 3 Participation 6 Alan Adams 60 of 105 MPs participated in 3A – No Violation of Credit Limit 57% Participation 68 of 105 MPs participated in 3 – Disapproved Credit 65% Participation
7
Statistics – Parallel Ops 7 Alan Adams The following metrics will no longer be included in the Statistics file during Parallel Operations. They can be found in the Portal locations, the format of post Go-Live reporting CategoryDataPortal Location RTBM LMP & MCP Contour Maps with Table and Downloadable files Public – Markets – RTBM – Contour Maps/LMP/MCP RTBMReal-Time Binding ConstraintsPublic – Markets – RTBM – Binding Constraints DA Operating Reserve requirements (SPP BA OR Requirements by product) on OASIS http://www.oatioasis.com/spp_default.html DALMP - Day-Ahead Hourly LMPs by BusPublic – Markets – DA – LMP By Bus DA Day-Ahead Hourly LMP per Settlement Location, MEC, MCC, and MLC Public – Markets – DA – LMP By Location DA Day-Ahead MCP for Regulation-Down, Regulation-Up, Spinning, and Supplemental Public – Markets – DA – MCP DADay-Ahead Binding ConstraintsPublic – Markets – DA – Binding Constraints DADemand BidsPublic – Markets – DA – Market Clearing OpsSystem-wide Day-Ahead Wind Forecast Public – Operational Data – Day-Ahead Wind Forecast Ops System-wide Short-Term Wind Generation Forecast vs. Actual Public – Operational Data – Short-Term Wind Forecast OpsSystem-wide Load Forecast vs. ActualPublic – Operational Data – STLF/MTLF OpsDay-Ahead Market ClearingPublic – Markets – DA – Market Clearing OpsNSIPublic – RTBM – NSI Graph
8
Settlements Charge Type Scorecard The Settlements Charge Type Scorecard for the week of November 1 is posted.Settlements Charge Type Scorecard Includes Operating Days October 14 through October 20. 8 Tony Alexander
9
Settlements Charge Type Scorecard 9 Charge Type% MPs Hit Scenario% MPs Hit DaEnergyHrlyAmt100%1‘Base’ Energy and Operating Reserve Settlement*98% RtEnergy5MinAmt100%2Make-Whole Payment*50% DaRegUpHrlyAmt100%3Regulation Non-Performance87% DaRegDnHrlyAmt100%4Contingency Reserve Deployment Failure100% DaSpinHrlyAmt100%5Day Ahead Non-Asset Energy*46% DaSuppHrlyAmt100%6Real Time Non-Asset Energy*61% RtRegUp5minAmt100%7‘Base’ Energy Import/Export*98% RtRegDn5minAmt100%8Energy Import/Export – Make Whole Payment Distribution*57% RtSpin5minAmt100%9Real Time Regulation Adjustment100% RtSupp5minAmt100%10Out Of Merit Energy and Reserve100% DaRegUpDistHrlyAmt100%11‘Base’ Virtual Energy Transaction*22% DaRegDnDistHrlyAmt100%12‘Base’ TCR Auction Settlements100% DaSpinDistHrlyAmt100%13TCR Auction Settlement - End of Month100% DaSuppDistHrlyAmt100%14‘Base’ TCR Settlement100% RtRegUpDistHrlyAmt100%15TCR Settlement - End of Month98% RtRegDnDistHrlyAmt100%16Miscellaneous100% RtSpinDistHrlyAmt100%17 RtSuppDistHrlyAmt100% RtRegAdj5minAmt100% DaOclDistHrlyAmt*98% RtOclDistHrlyAmt100% Tony Alexander
10
Settlements Charge Type Scorecard 10 DaMwpCpAmt*65% DaMwpDistHrlyAmt*59% RtMwpDistHrlyAmt*98% RtMwpCpAmt*59% RtRegNonPerf5minAmt89% RtRegNonPerfDistHrlyAmt100% RtCRDeplFailAmt100% DaNEnergyHrlyAmt*46% RtNEnergy5minAmt*61% RtCRDeplFailDistHrlyAmt100% RtOom5minAmt100% DaVEnergyHrlyAmt*27% RtVEnergy5minAmt*27% DaVTxnFeeAoAmt*31% ArrAucTxnDlyAmt100% ArrUpliftDlyAmt100% ArrPaybackMnthlyAmt100% RtRnuHrlyAmt*46% TcrFundHrlyAmt100% TcrUpliftDlyAmt100% TcrPaybackMnthlyAmt98% TcrAucTxnDlyAmt100% MiscDlyAmt100% Tony Alexander
11
Charge Types Not Using Stubbed Data All Charge Types are using upstream data from September 25 Operating Date forward. 43 Charge Types or 100% of the Charge Types for SMT. MPs should validate these Charge Types “Bid to Bill”. 11 Tony Alexander
12
Charge types not using stubbed data 12 MPs should validate these Charge Types “Bid to Bill”. DaEnergyHrlyAmtRtRegDnDistHrlyAmtRtNEnergy5minAmt RtEnergy5minAmtRtSpinDistHrlyAmtRtCRDeplFailDistHrlyAmt DaRegUpHrlyAmtRtSuppDistHrlyAmtRtOom5minAmt DaRegDnHrlyAmtRtRegAdj5minAmtDaVEnergyHrlyAmt DaSpinHrlyAmtDaOclDistHrlyAmtRtVEnergy5minAmt DaSuppHrlyAmtRtOclDistHrlyAmtDaVTxnFeeAoAmt RtRegUp5minAmtDaMwpCpAmtRtRnuHrlyAmt RtRegDn5minAmtDaMwpDistHrlyAmtArrAucTxnDlyAmt RtSpin5minAmtRtMwpCpAmtArrUpliftDlyAmt RtSupp5minAmtRtMwpDistHrlyAmtArrPaybackMnthlyAmt DaRegUpDistHrlyAmtRtRegNonPerf5minAmtTcrFundHrlyAmt DaRegDnDistHrlyAmtRtRegNonPerfDistHrlyAmtTcrUpliftDlyAmt DaSpinDistHrlyAmtRtCRDeplFailAmtTcrPaybackMnthlyAmt DaSuppDistHrlyAmtDaNEnergyHrlyAmtTcrAucTxnDlyAmt RtRegUpDistHrlyAmt MiscDlyAmt Tony Alexander
13
Charge Types Not Included In SMT ARR/TCR Annual Charge Types –ArrPaybackYrlyAmt, ArrCloseoutYrlyAmt, TcrPaybackYrlyAmt, TcrCloseoutYrlyAmt Demand Response Load Charge Types –DaDrHrlyAmt, DaDrDistHrlyAmt, RtDr5minAmt, RtDrDistHrlyAmt Other Various Charge Types –RtJoaHrlyAmt, RtRsg5minAmt –MCRRs/MPRR New Charge Types 13 Tony Alexander
14
Analysis: Oct 21 - 25 14 Alan Adams Structured Market Trials Statistics posted to spp.org Structured Market Trials Statistics spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder > Structured Market Trials Presentations, Statistics, MP Meetings Analysis of Oct 21 – 25 Operating Days posted to spp.org Analysis spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder > Structured Market Trials Presentations, Statistics, MP Meetings
15
Announcements & Outstanding Questions Settlements to clear Database on Nov 6 –BSS, Meter Data, and Settlement Results Database will not be cleared and will remain available to MPs –Meter Agents can continue to pull Meter Agent Reports for any OD up to 11-4 –SPP will clear the ETSE Database (Settlements Calculation Engine DB) SPP will not be able to produce Finals or Resettlements for any of the ODs up to 11-4 Settlement will start up again with an Initial Settlement for OD 11-12-13 to be posted on 11-19-13 MPs can continue to bid/offer Nov 4-11 but there will be no Settlements behind any of these activities 15 Ginny Watson
16
Announcements & Outstanding Questions Mon Nov 18, 9-10A – Review Known Issue Log –Register on spp.org herehere spp.org > Integrated Marketplace > Calendar > Marketplace – November 2013 DA Tags must still be entered during Parallel Ops (after Nov 3) –Real Time Tags are mirrored, Day Ahead Tags must be entered Please submit an RMS Ticket explaining what you liked or disliked on Friday calls RMS Ticket –SPP would like your suggestions for Parallel Operations’ weekly calls 16 Ginny Watson
17
Wind Resource Offer Parameter PSA The Day Ahead and Real Time Econ Min and Emergency Min MWs for Wind Resources will be required to be 0 MWs with the installation of v1.7 of the Market Software. –Offers submitted with non-zero Econ/Emer Min MWs will be rejected once the v1.7 Market Software patch is installed. –Some wind resources were not registered with 0 MW minimum outputs. –SPP has overwritten the registration limit to 0 MWs in Prod, so that 0 MW Econ Min offers can be entered. Registration will close the loop on this change. Protocols -- 4.2.2.5.5 Dispatchable Variable Energy Resources (1) The Minimum Emergency Capacity Operating Limit and Minimum Economic Operating Capacity Limit submitted as part of the Day-Ahead Market and/or RTBM Resource Offer must be submitted as zero MW. Otherwise, the Resource Offer will be rejected; 17 Jarrett Friddle
18
Holiday Proposal No SPP staff running DA Market or DA RUC on holidays listed below. Quality of solutions may be less than a normal supported day. Thanksgiving Day Thursday 11/28 & Friday 11/29 DA Market and DA RUC: run studies on Wed 11/27 for Thurs 11/28, Fri 11/29 ID-RUC (COP True-UP): run at least every 4 hours RTBM: maintain as normal RTGEN/EMS: maintain as normal Christmas Eve 12/24 & Christmas Day 12/25 DA Market and DA RUC: run Mon 12/23 for Tues 12/24, Wed 12/25, Thurs 12/26 ID-RUC (COP True-Up): run at least every 4 hours RTBM: maintain as normal RTGEN/EMS: maintain as normal New Years Day 1/1 DA Market and DA RUC: run Tues 12/31 for Wed 1/01 and Tues 1/02 ID-RUC (COP True-Up): run at least every 4 hours RTBM: maintain as normal RTGEN/EMS: maintain as normal 18 Carrie Simpson
19
Look-Ahead: Nov 1 – Nov 11 19 Scenarios Nov 1 – Nov 11 35 Daylight Savings Time Nov 4 - 11 MPs can continue to bid/offer, but there will be no Settlements behind any of these activities The Market Trials Hotline will be closed Nov 4 – 11 Hotline will re-open for high and critical issues Nov 11 – 27 Parallel Ops Monthly Calendar on spp.org Parallel Ops Monthly Calendar spp.org > Integrated Marketplace > Market Trials > Parallel Operations Test> Integrated Marketplace Parallel Operations Project Documents Parallel Ops Daily Calendar to be posted to spp.org Nov 12 - Mock Deployment Beginning Nov 16, Saturdays & Sundays in Nov are available for unstructured testing by MPs Ginny Watson
20
35 Daylight Savings Time Scenario Description Twice a year Daylight Savings creates a “Short Day” that contains only 23 hours and a “Long Day” that contains 25 hours. SPP systems are designed to handle both situations. This scenario will test the “Long Day” on Nov 3, 2013 Expected Result MPs should be able to submit all required data There should be the option to submit 25 hours worth of data with a granularity of hourly (or less) for all submissions SPP shall accept 25 hours worth of data for all hourly (or less) submissions SPP shall process all 25 hours worth of data through its systems correctly SPP shall publish all results for the 25 hours correctly MPs should be able to query all results and correctly see all 25 hours worth of data from all SPP systems 20 Alan Adams
21
35 Daylight Savings Time MP Activities MPs should interact with all of the systems below if they will be utilizing them in the Integrated Marketplace Market User Interface and API (available 7 days prior to the operating day. For 11/3, MPs may begin submitting bids and offers on 10/27). Submit at least one Bid and Offer for each parameter that is an hourly for the hour prior, the duplicate hour (HE 0200) and the subsequent hour Market Notifications: Review all notifications where appropriate to ensure timestamps are correct Scheduling: Submit DA Market dispatchable and Up to TUC schedules prior to the close of the DA Market to ensure that schedules are created for the extra hour correctly Ramp Reservation System: Submit for Ramp for extra hour to ensure it is recognized by the system 21 Alan Adams
22
35 Daylight Savings Time MP Activities - continued Day Before Day Ahead will run early in the AM on 11-2 for 11-3: Review results of study Day Ahead will run on 11-2 for 11-3: Review results of study RUC will run on 11-2 for 11-3: Review results of study RTBM: Review both XML dispatch instructions to ensure timestamps are correct RTGEN: Review ICCP timestamps to ensure they are correct Settlements: Settlement statements; Bilateral Settlements Schedules; Invoices Public Data: Virtual Reference Prices; Binding Constraints; DA LMP Prices by Bus, By Location; DA MCP; Market Clearing; RT LMP Prices by Bus, By Location; RT MCP; MTLF vs Actual; STLF vs Actual; Day Ahead Wind Forecast; Short Term Wind Forecast 22 Alan Adams
23
Release Scorecard 23 Release ScorecardRelease Scorecard posted to spp.org: spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Ginny Watson
24
Migration and Maintenance Report 24 Migration and Maintenance Report Migration and Maintenance Report posted to spp.org spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Annette Holbert
25
Known Issues Log 25 Please review the Market Trials Known Issues Log on spp.org Market Trials Known Issues Log spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Carrie Simpson Issue #RMS ID #Component Synopsis Severity 787 Market Systems DC EDR is dispatched to its fixed MW when in island=0 and SCADA=0. DC EDR should always be dispatched for economics, when in island = 0, a dispatch of 0MW is most appropriate. DC EDR's are associated with one station that if it is disconnected SPP is not receiving the energy, thus a setpoint and dispatch mw of 0 is most appropriate. Severity 3: Medium 786Markets UI Validation: Demand bids (fixed only, not price sensitive) should be limited to be 110% of a historical peak load for the settlement location. Severity 3: Medium 789Markets UI The following issues occurred while submitting ST Non-Conforming Load Forecast for the Fall DST transition in the Markets UI. 1) Duplicate hour is not consistently displayed a. Examples found where intervals for duplicate hour 02:00 are not consistently displayed with an asterisk b. Examples found where duplicate 02:00 intervals are missing from the UI page 2) Severe error occurs when saving updates via the Markets UI. The data does successfully save to the MDB. 3) Duplicate intervals do not sort correctly Severity 2: High
26
Schedule 26 Nov 4 – Nov 11 Note: No Settlements behind these days Nov 12 – Nov 17 Parallel Ops Begins Nov 12 Mock IDT Scenario 7 – Must Offer Scenario 28a – Nonfunctional Testing, CMS Outage Note: Beginning Nov 16, Saturdays & Sundays in Nov are available for unstructured testing by MPs Ginny Watson
27
Market Trials Useful Resources Hotline: 501-482-2222 for critical & high issues Nov 11-27, M-F 8A – 5P Please submit all other inquiries via the Request Management System (RMS)Request Management System (RMS) Settlements Calendar marketplace.spp.org > Public > Settlements > Calendars Integrated Marketplace Parallel Operations Project Documents spp.org > Integrated Marketplace > Market Trials > Parallel Operations Test> Integrated Marketplace Parallel Operations Project Documents Integrated Marketplace Market Trials Project Documentation Folder spp.org > Integrated Marketplace > Market Trials > Structured/Unstructured Test > Integrated Marketplace Market Trials Project Documentation Folder Here : Calendar, Release Scorecard, Migration Report, Known Issues Log, MP Guide Here SMT Presentations, Statistics, MP Meetings Folder SMT Reference Documents Folder Tag Validation Criteria for MT Testing SMT Scenarios Folder SMT Scenarios Schedule Change Tracker spp.org > Integrated Marketplace > Marketplace Documents 27