Project Information Meeting / Open House Wednesday, September 17, 2014 6:00 – 8:00 PM Agenda 6:00 to 6:30 View Project Displays 6:30 – Presentation and Q&A 1 Project Team Julie Campero, Project Management Nicholas Grgich, Design Brianna Ceglia, Environmental Planning Connie Ganong, Biology Dennis Calloway, Landscape Architecture RocQuel Johnson, Public Information
2
Project Purpose Repair slide to prevent further damage to roadway. 2 Project Scope Construct a 186-foot long, 14-foot tall retaining wall. Construct a concrete barrier to replace guardrail. Reconstruct damaged shoulder pavement. Replace light pole and drainage system.
3
Project Location 3
4
Typical Cross Section 4
5
Project Layout 5
6
Simulations – View From Mattis Ct. 6
7
Planting Plan 7
8
Biology – Protecting Species Resource Agency Consultation Alameda Whipsnake California Red-Legged Frog Nesting birds Preparing Contract Document Prior to Construction Start During Construction 8
9
Project Schedule and Cost Begin Construction and Tree Removal: Late 2015 End Construction: Late 2016 Plant Establishment: 1 year after construction Construction Cost: $5.1 million 9
10
Public Outreach Website http://www.dot.ca.gov/dist4/projects/13stormcarson/index.htm Stakeholder Email Notices US Postal Mail Notices RocQuel Johnson, Caltrans District 4 Public Information Office 510-286-4948 10
11
11 Questions?
12
SR 13 Projects 12
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.