Presentation is loading. Please wait.

Presentation is loading. Please wait.

Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University.

Similar presentations


Presentation on theme: "Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University."— Presentation transcript:

1 Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University

2 OUTLINE ● TAC SR main Parameters ● Possible TAC SASE FEL based on X-band linac ● Damping ring option for TAC SASE ● Requirement for testing the CLIC structure ● Propose time table and budged plan ● Conclusion

3 TAC SR Main parameters Booster Ring SR ring Injector 3 GeV ● 200 MeV Injector (standard S bad linac) ● 0.20 → 3 GeV Booster Ring (500 MHz Multi-cel structure) ● 3 GeV SR Ring (500 MHz single cell) ● ==>> λ SR ~ 0.02-10nm 200 MeV Slide from Zafer Nergiz ~75 m ~40 m

4 Possible SASE FEL Project based on 12 GHz linac ● 200 MeV injector (standard S bad linac) ● 0.25->5 GeV main accelerator (X-band linac) ● Any undulator ●  λ U =2.5 cm  λ SASE FEL ~ 0.1nm Gun Injector 200 MeV Linac-2 2.5 GeV Linac-3 ~5 GeV BC1BC2 Undulator X band linac S band linac ~50 m ~120 m ~50 m

5 Main beam parameters of X-band linac proposal Main Linac Parameters Injector Parameters ParameterValueUnit Energy6GeV Linac frequency12GHz Linac gradient70MV/m Bunch charge250pC Bunch length8μm Max Bunch Repetition500MHz Pulse length150ns Number of bunches per pulse1-75 Pulse repetition0.5kHz Structure RF input Power50MW Number of klystrons320 / ~50 Klystron power6 / ~50MW Normalized horizontal emittance1mmrad Total linac length120m ParameterValueUnit Energy250MeV Linac frequency3GHz Linac gradient20MV/m Total injector length50m Injector Parameters

6 CLIC 12 GHz Structure R~3mm L~40cm Using high frequency structure allows us to reach high energy in short distance.. Potentially power and space saving… Disadvantage -> required too high precision…

7 Sample FEL Calculation ● Beam Energy  5 GeV ● Peak current  8 kA ● Emittance  1 mm.mrad ● Energy Spread  0.3 % ● Undulator period  3cm ● Undulator strength  2 ● Undulator type  planar ● Resonant λFEL  6 Å ● Pole number  100 ● Number of undulator  15 ● Lattice type  triplet

8 Sample FEL Calculation

9 Interface between TAC SR and SASE ● Option 1 – Using injector of SR as injector of SASE ● Option 2 – Using one of ring of SR as damping ring of SASE SEL 200 MeV injector 5 GeV linac Undulator 3 GeV SR

10 If we can reduce emittance 50%

11 Possible test topics for CLIC ● Accelerating structure performance; – Breakdown, fabrication, wakefield… ● Accelerating structure with klaystron – power combination scheme, low-level control; ● Instrumentation; – Alignment techniques proposed for CLIC main linac, BPMs, stabilization, ● Beam dynamics and operation ; – Low emittance damping ring,low emittance generation and preservation (injection, damping ring, bunch compressor, similar chain like CLIC design..) ● Multi bunch stabilization

12 Possible time table ● CDR (~1 year) – Feasibility study of combining SR and SASE facilities – Defining the requirement sources for TDR and test/development tasks during TDR ● TDR (~3 Years) – Development some prototypes – Testing key parameters (if possible) – Detailed design with SR interface or without SR – Definition various energy operation ● Starting installation of the injector 2017 (that is too late for SR??) ● Starting the installation of main linac 2020 ● Starting the installation of undulator section 2022 ● Expected time for FEL generation 2024

13 Draft Budget CDR (2013) existing manpower will be used ~ 60 k€ TDR (2014-2016) ~20 personnel development of gun and test for RF/klaystron ~ 6500k€ Injector(2017-2020) Building, all accelerator, manpower (no operating cost) ~80 M€ Main Linac → ~120 M€ (2020-2025) Building, all accelerator, manpower (no operating cost) ~120 M€ FEL → ~100 M€ (2020-2025) Building, all accelerator, manpower (no operating cost) ~100 M€

14 Conclusion ● High frequency linac allows reaching high energies in short distances.. compact design.. ● On the other hand operating such machine requires very tight tolerances.. ● However FEL generation at Å wavelength rage also requires similar tolerances. ● Time schedule for the proposed collaboration seems also acceptable for SR project.. ● Combining two different facility will save some cost but will bring many other difficulties.. We should evaluate cost and difficulties.. ● Our experiences from TARLA shows that building a working machine is too difficult… ● This collaboration would only be provided if CERN gives the needed support e.g… – Training – Development – Installation ● TAC-CLIC collaboration will bring lots of experience and sharing ● If we can do this collaboration together, the experiences from the works and studies will be very helpful for the planned structures for TAC. ● This could be a win-win project. My idea: Turkey, instead of making yearly installment to become CERN member, spends same amount to constrıuct this proposed accelerator test facility in Turkey but still becames a CERN member ????

15 ● Thank you!


Download ppt "Interface between TAC SR and SASE FEL Possibility for testing CLIC structure Avni AKSOY Ankara University."

Similar presentations


Ads by Google