Download presentation
Presentation is loading. Please wait.
Published byRandolf Carroll Modified over 9 years ago
1
Unity Application Generator How Can I… Add a device in UAG and download it into Unity project – online.
2
Schneider Electric 2 - EU – Hussain Ahmed – 02.03.2009 Issue ●I want to add a device in UAG in such a ways that it can be downloaded in Unity project, without stopping the PLC.
3
Schneider Electric 3 - EU – Hussain Ahmed – 02.03.2009 How to do.. Basic explanation ●We generate a project with UAG. ●Download the Unity application, generated by UAG, into PLC. ●Add a new motor in UAG. ●Perform incremental generation. ●Go online with Unity. ●New motor will be available in the Unity application and eventually in PLC.
4
Schneider Electric 4 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG ●We create a project in UAG with two motors and an OP MODE control module. ●We generate the project.
5
Schneider Electric 5 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG ●CONNECT to the PLC ●Using TRANSFER command, download project to PLC.
6
Schneider Electric 6 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG ●This message will be displayed. Click on TRANSFER. ●This window will be displayed.
7
Schneider Electric 7 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG ●Using BUILD /REBUILD command, download the Unity application into the PLC. ●Go Online with Unity. ●All the blocks can be monitored with Unity.
8
Schneider Electric 8 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG ●Without disconnecting from the PLC, close the Unity application. ●This window will be displayed: ●Click on “Yes”.
9
Schneider Electric 9 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG ●Come back to UAG. ●Add a new motor in UAG. ●Generate the Unity application by using incremental generation. ●This message will appear: Both, yes or No can be clicked.
10
Schneider Electric 10 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG ●After the generation, this message will appear: ●Please notice that new Motor “MOT3” has been created.
11
Schneider Electric 11 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG ●Open the Unity application by clicking on the PLC in UAG and then clicking on Unity icon in the UAG tool bar. Note we have closed the application without disconnecting from PLC.
12
Schneider Electric 12 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG ●Unity will open – and there will be a project “NOT BUILT” ●“MOT3” has been created by UAG in Unity.
13
Schneider Electric 13 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG ●Using “Connect” command, connect to the PLC. ●This will be the state of the application: PLC “Running” but project “Not Built”. ●Using “Build Changes” command, build the changes.
14
Schneider Electric 14 - EU – Hussain Ahmed – 02.03.2009 How to do.. In UAG This will be the new state of the application: PLC “Running” and project “Built”. Block for the new motor “Mot3” will be displayed.
15
Schneider Electric 15 - EU – Hussain Ahmed – 02.03.2009 Conclusion ●New device in an existing project can be generated by UAG in Online mode. ●User has to ensure that the Unity project was “Connected” before the new motor was inserted and project has been generated. Thanks for your attention!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.