Download presentation
Presentation is loading. Please wait.
Published byMarianna Norton Modified over 8 years ago
1
Over/Under Billing Presented by Brian Cancian
2
Welcome If you are applying for CPE credit, please be sure to sign in and sign out. Please write legibly! Additionally, fill out the survey for a chance to win a free pass to the 2017 User Conference!
3
Today’s Session 1 What is Over/Under Billing or WIP? Configuring F OUNDATION to calculate WIP Ongoing system utilization and adjustments Over/Under or WIP reporting 2 3 4
4
What is Over/Under Billing or Work in Process (WIP)? The process of calculating the revenue earned on a project based on the actual percentage of completion, comparing it to what has actually been billed against the job, and adjusting the financial statements accordingly.
5
Configuring Your Software Proper settings for Over/Under Billings G/L Control File G/L Account Records J/C Control File Bonding Report Classes Control File
6
Ongoing Utilization Proper Job Setup Approved Change Orders (Owner C/O’s) Budget Adjustments (Estimate C/O’s)
7
Over/Under Reporting How do you run the report? Where do the figures pull from? How are the numbers calculated? What if something isn’t correct? Can financial statements be updated?
8
Thanks for Attending www.foundationsoft.com btc@foundationsoft.com Over/Under Billing
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.