AIDA 1 20 Heatsink units, locating pins and washers now on site. Status of Electronics Module
2
These parts complete, delivered to Liverpool Templates for the cutting of the Dow Corning form to be produced and manufactured. Fasteners to be ordered. AIDA 2 Status of Electronics Module
3
3
4
AIDA 4 Status of Detector Mechanics PT100s and a controller have been wired by Paul and are monitoring temperature.
5
AIDA Thermal tests, N2 insulating volume, with Thermocube providing cooled nitrogen for detectors. Awaiting delivery of bottled Nitrogen to lab Nitrogen insulated 5 Slide is a reminder of proposed tests.
6
AIDA 6 This is the unit that will be used to cool the nitrogen gas. Unit on site at Daresbury.
7
AIDA All bought out parts now at Daresbury. Other parts to be made at Liverpool Workshop, delivery expected 13 th Feb Assembly at DL. Note of caution: Pauls expecting to be on paternity leave around end of Feb. Status of Detector Support Cooling plates Jumo Chiller Baseframe 7